Z2DZ--Replace Switchgear Bldg 18 Construction (VA-26-00001395) 558-20-156|
Veterans Affairs · 246-NETWORK CONTRACTING OFFICE 6 (36C246)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C24625B0026 in this department, oldest first.
- May 22, 2025Pre-solicitationOpen
- Jun 16, 2025SolicitationOpen
- Jun 16, 2025SolicitationOpen
- Jun 16, 2025SolicitationOpen
- Jul 31, 2025 · this noticeSolicitation
- Aug 5, 2025SolicitationOpen
- Aug 5, 2025SolicitationOpen
- Aug 5, 2025SolicitationOpen
- Aug 5, 2025SolicitationOpen
- Aug 5, 2025SolicitationOpen
- Aug 5, 2025SolicitationOpen
- Aug 7, 2025SolicitationOpen
- Aug 7, 2025SolicitationOpen
- Aug 7, 2025SolicitationOpen
- Aug 11, 2025SolicitationOpen
- Aug 12, 2025SolicitationOpen
- Oct 22, 2025Award NoticeNATIONAL PROJECT MANAGEMENT LLC · $3.8MOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
RFI Reference (Optional) Response 1. In regards to drawing HA-01 the Project title on the drawing is Building 1 Halls and Walls.� I do see it has in red on the top left for Reference Only. � � � This is for reference but as this project includes demolition of Vending room, the walls right outside that would be lead containing if it is a yellow glazed block. 2. On Drawing G-003 Under Life Safety General Notes, Note A indicates referencing drawing GI002 which is not included with the contract documents. G-002 This is assuming GI002 is a typo and that it was suppose to be G-002 in which G-002 doe… (show all)
s speak on ICRA and life safety. 3. Drawing A-101 please clarify the building numbers on the drawings.� Some Reference Bldg 1 some reference Bldg 18. Drawing FX101 References the switchgear Rm as Building One. � Building 1 is the hospital itself. Building 18 is the switchgear room. These two rooms are connected but separated by a wall. For this project, we will be taking down that wall and incorporate the vending room (in Building 1) as part of the switchgear room (building 18). 4. Is Building One and Building 18 the same building? � See question # 3 for explanation. Is there a video surveillance/access control component to this project � No video surveillance is part of the project. Are you accepting approved equals on this project � No equipment is being sole sourced. Approved equals are acceptable. 1. Will all the work for this project take place during normal work hours? All work should take place during normal work hours. Section 01000 subsection 1.25 and Section 010000 subsection 1.6.2 Work that may need be outside of working hours will need to be coordinated with the COR. This is usually not an issue unless the GC wants to complete this project all at night. Outages will be done outside of working hours but coordination will still need to be completed. 2. Does the Superintendent have to be an employee of GC? 010000 sub 1.30.B / 014500.10 sub1.5.1.2 / 014500.10 sub 1.6.1 No, but all qualification must be met as seen in the specs. This superintendent will still be viewed as an extension of the GC by default an employee of the GC. This superintendent will be dedicated only to this project and no others. 3. Can Superintendent or SSHO have more than one duty? Section 013526 subsection 1.7/ Section 014500.10 subsection 1.5.1.2 Superintendent and SSHO are two different individuals with two different roles. We will usually allow QCM/superintendent to the the same person given qualifications are met for both. 1)� � � � Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO? section 013526 sub 1.7 See Specification section 013526 sub 1.7 2)� � � � If no to the question above, will the SSHO need to be full-time for this project? section 013526 sub 1.7 See Specification section 013526 sub 1.7 3)� � � � Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC? section 014500.10 sub 1.5.1 See Specification section 014500.10 sub 1.5.1 4)� � � � If no to the question above, will the QA/QC need to be full time for this project? section 014500.10 sub 1.5.1 See Specification section 014500.10 sub 1.5.1 5)� � � � Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC? section 014500.10 sub 1.5.1 and section 013526 sub 1.7 See Specification section 013526 sub 1.7 and See Specification section 014500.10 sub 1.5.1 6)� � � � Please confirm if tax should be included in our proposal? � Proposals should cover your cost to perform the terms and conditions given in the solicitation 7)� � � � Please provide the latest wage determination for this project s county. � Wage determination is included in the posting. 8)� � � � Page 51 of 68 Section 4.15 Please check off the appropriate box for VAAR clause 852.219-75. � The contractor may check "general construction" and include with their bid submission. 1. Staging Area: Could you please confirm the designated location for the contractor s staging area? � VA to confirm. 2. Construction Area: What is the defined boundary of the construction area for this project? � See drawing Sheets A-101, MH101, PP101, ED101 and EP101. 3. Switchgear Room Configuration: Will the new switchgear room be a single consolidated space incorporating the existing vending room and the current switchgear room? � Refer to drawing Sheet A-101. There is a new pair-door in the existing wall between the current switchgear room (Bldg 18) and the new expanded switchgear room (BG000, Bldg 1). 4. Equipment Placement: Will the new switchgear be installed in the vending room, or will the transformers be placed there while the switchgear remains in the existing switchgear room? � Refer to drawing Sheets E-001 to E-603. 5. Space Allocation: Alternatively, will all new equipment (transformers and switchgear) be installed within the existing switchgear room, with modifications made to ensure adequate ventilation and spacing? � Refer to the construction documents. . Will VAMC Facility Electrical Engineering provide a similar or compatible functional Specification against Siemens-Allie? � It is not required to be siemens equipment but rather any equipment that is equal to equipment within the spec and drawings. Does the SDVOSB Prime have to be a General Contractor? � This is a Total Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside under NAICS code 236220. Contractor qualification determination will be made in accordance with Federal Acquisition Regulations Does the General Construction phase on pages 50-68 apply to the General Contractor designation as the Prime contractor on this project? � All pages of the contract would apply to the awarded party (Prime). Is Siemens SENTRON or GEAFOL OEM being upgraded? Is equipment being bid on this project as a Vendor/Subcontractor? � It is not required to be siemens equipment but rather any equipment that is equal to equipment within the spec and drawings. Do the VAMC Switchgear and Transformer Upgrades have similar OEM (Siemens) specifications in the Bid,� or can another vendor's OEM equipment be bid? � It is not required to be siemens equipment but rather any equipment that is equal to equipment within the spec and drawings. Is the Electrical contractor to replace the existing substation B18-SWGR-Main A/B and transformers B18-XF-T6 and B18-XF only? � Refer to Sheet E-601 for the extent of the demolition. In addition to other work, all distribution equipment including the medium voltage compartments B18-MVS-S6 and S7 and downstream items are to be replaced. Is it the intention to have the awarded firm provide the newer version of the existing products now under the SENTRON or GEAFOL product lines? If so, why weren't the specifications and model numbers of the newer Siemens Equipment included in the bid? � The equipment is not sole sourced. Approved equivalents are allowed to be used. Are we to provide a new tie breaker that can properly transfer power without manual load transfer? Has the Siemens Account Representative provided a make and Siemens Product and item number? � Tie breaker is to be kirk-keyed with the main breakers of the transformer secondaries, and manually controlled. Are we to relocate the distribution circuits to the new switchgear or the former canteen/break room? � Distribution circuits are to be relocated from the existing switchgear to the new switchgear upon energizing, phased in a sequence which is coordinated with the VA so as to be least disruptive and minimize downtime. Provide a concrete foundation to house the new switchgear in the canteen/break room? � Refer to Drawing 3 GROUND FLOOR NEW WORK PLAN and New Keynote 3 on Sheet A-101 and Detail 7 CONCRETE EQUIPMENT BASE on Sheet A-601. Is modifying the existing OIT and HAC closet a General Contractor's responsibility? � General contractor should be working with their subcontractors. Modify the existing location to house the new equipment correctly. � Refer to the
Who won similar work
25 award notices on SAM.gov in the last 24 months. Matched by: Same office (246-NETWORK CONTRACTING OFFICE 6 (36C246)), same NAICS 236220.
Single-winner award sizes (25): middle half $197K to $3.8M, median $1.6M; range $28K to $23.9M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| VALIANT CONSTRUCTION LLC | 2 | $43.3M | Sep 2, 2026 |
| PHILLIPS C&C LLC | 2 | $4.8M | May 20, 2026 |
| BTR ENTERPRISES OF SC LLC | 2 | $213K | May 8, 2026 |
| SIGO VALIANT JV II LLC | 1 | $23.0M | Jul 10, 2026 |
| GROUP III MANAGEMENT INC | 1 | $17.5M | Aug 3, 2026 |
| BRIGHT REGARDS, LLC | 1 | $8.5M | Jul 30, 2025 |
| BRYMAK FSI JV, LLC | 1 | $7.6M | Sep 12, 2025 |
| BLUE CORD DESIGN AND CONSTRUCTION, LLC | 1 | $3.8M | Jul 30, 2026 |
| HARBOR SERVICES, INC | 1 | $2.9M | Oct 29, 2025 |
| Yerkes South Inc. | 1 | $2.8M | Aug 24, 2026 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
- Sep 2, 2026VALIANT CONSTRUCTION LLC$19.4MFY26 NRM B3-Fourth Floor PACT Renovation Project # 659-26-800No listed company matched (Materiality N/A)
- Aug 24, 2026Yerkes South Inc.$2.8MZ2DA--RENOVATE PROSTHETICSNo listed company matched (Materiality N/A)
- Aug 3, 2026GROUP III MANAGEMENT INC$17.5MY1DA--652-24-103 Increase Surgical AccessNo listed company matched (Materiality N/A)
- Jul 30, 2026BLUE CORD DESIGN AND CONSTRUCTION, LLC$3.8MZ2DA--Correct Site Structural DeficienciesNo listed company matched (Materiality N/A)
- Jul 10, 2026SIGO VALIANT JV II LLC$23.0MZ1NB--Boiler replacementNo listed company matched (Materiality N/A)
- May 20, 2026PHILLIPS C&C LLC$3.8MZ1DA--Renovate Main LobbyNo listed company matched (Materiality N/A)
- May 14, 2026VALIANT CONSTRUCTION LLC$23.9MY1DZ--36C24626C0037 659-22-405 | Install Campus Generator |No listed company matched (Materiality N/A)
- May 8, 2026BTR ENTERPRISES OF SC LLC$184KY1LB--Sidewalks and CrosswalksNo listed company matched (Materiality N/A)
- Mar 6, 2026DAX SAFETY & STAFFING SOLUTIONS, LLC$1.3MZ2DA--Replace MRI 1.5TNo listed company matched (Materiality N/A)
- Feb 20, 2026PHILLIPS C&C LLC$992KZ1DA--658-24-106 Replace Bldg 16 HVACNo listed company matched (Materiality N/A)
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.