- May 22, 2025Pre-solicitationOpen
- Jun 16, 2025SolicitationOpen
- Jun 16, 2025SolicitationOpen
- Jun 16, 2025 · this noticeSolicitation
- Jul 31, 2025SolicitationOpen
- Aug 5, 2025SolicitationOpen
- Aug 5, 2025SolicitationOpen
- Aug 5, 2025SolicitationOpen
- Aug 5, 2025SolicitationOpen
- Aug 5, 2025SolicitationOpen
- Aug 5, 2025SolicitationOpen
- Aug 7, 2025SolicitationOpen
- Aug 7, 2025SolicitationOpen
- Aug 7, 2025SolicitationOpen
- Aug 11, 2025SolicitationOpen
- Aug 12, 2025SolicitationOpen
- Oct 22, 2025Award NoticeNATIONAL PROJECT MANAGEMENT LLC · $3.8MOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
SCOPE OF WORK Replace Switchgear in Building 18 Project Number 558-20-156 STATEMENT OF WORK Description of Work - Summary: The switchgear in Building #1 at the Durham VA Health Care Center, 508 Fulton St, Durham, NC has been inspected and deemed deficient. There is an immediate need to replace the switchgear as it is past its life cycle. Estimated construction magnitude is between $2,000,000 and $5,000,000. NAICS CODE: 236220 Size Standard: $45.0 Million General: The contractor shall upgrade the distribution system for building 18 normal power switchgear and transformers to meet the power requ… (show all)
irement for redundancy in Building 18 at the Durham VA Health Care System. The contractor shall provide phasing coordination for each section below to minimize impact to normal operations. The contractor is responsible for providing all supervision, materials, labor, equipment, transportation, testing, and storage for this project. The contractor may be required to provide alternate source of power to minimize operation impacts. The contractor shall replace the existing substation B18-SWGR-Main A/B including transformers B18-XF-T6 and B18-XF. All work shall be performed according to the attached drawings and specifications. Specific Requirements: The construction for this project will cover the following but not limited to: Provide new switchgear and related transformers in Building1 BG-000 Provide new Substations and distribution switchgear. Provide new transformers to replace T-6 and T-7. Provide a new tie breaker that can properly transfer power without having manually load shed power to close the breaker. Relocate the distribution circuits to the new switchgear room. Provide a concrete foundation to house the new switchgear. Modify the existing OIT and HAC closet. Modify the existing location to properly house the new equipment. Provide a warranty in accordance with the FAR. All material and installation will be in accordance to all state and federal codes, NFPA, ANSI standards, drawings, and specifications. Electrical distribution components (switchboards) would include provisions to manually limit the potential energy due to potential fault conditions(Arc Quenching) when operating or maintaining the equipment to ensure maintenance and operational safe working conditions while maintaining system reliability and required code/efficiency ratings. Installation Requirements: Competent, experienced, licensed or certified workers shall perform crafts requiring specialized skills. All work shall be performed in full accordance with applicable local and Federal regulations. All equipment and installation shall conform to the VA master specifications. All equipment and installation shall conform to the recommendations of the National Fire Protection Association (NFPA), including the National Electrical Code (NEC). The Supplier shall use good safety practices while working. All hardware should be installed in such a manner to minimize damage and maximize patient and employee safety. All equipment and procedures shall conform to OSHA, NEMA, and ANSI Standards and conform to the Standard Building Code and the Standard Mechanical Code. All installations for the Durham VAMC shall conform to VAR and FAR standards. Normal working hours shall be 7:30 AM to 4:00 PM, Monday through Friday � Federal Holidays or any other Holiday designated by the President of the United States excluded. Some work may be outside normal working hours. For working outside the �normal working hours� as defined in this contract, the vendor shall give 3-day notice to the Contracting Officer so that arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section. No photography of VA premises is allowed without written permission of the Contracting Officer. Execute work to interfere as little as possible with normal functioning of Medical Center, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied jointly by patients or medical personnel, and Contractor�s personnel, except as permitted by COR where required by limited working space. No utility service such as water, gas, steam sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director�s prior knowledge and written approval. The vendor shall submit a request to interrupt any such services to COR, in writing, 15 working days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption. Working outside the normal business hour may be necessary to limit the impact as much as possible. VA reserves the right to close or shut down the project site and order the vendor�s employees off the premises in the event of a national emergency. The vendor may return to the site only with the written approval of the Contracting Officer. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with COR. Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Coordinate with COR. Obtain permits from facility Safety Manager at least 24 hours in advance. The contractor shall maintain neat and orderly work areas and shall clean area of debris and rubbish daily and dispose of waste materials offsite per hospital policies. The contractor shall provide a dumpster if it is determined to be necessary, and shall work with the COR in advance for a spot-on site to establish the dumpster. Space on campus is limited and a dumpster location is not guaranteed. Testing will be accordance with ANSI standards and IEE standards unless otherwise provided in specifications for new devices provided. Coordinate with COR for all Factory Acceptance Testing. Contractor must have an EMR Rating of 1 or less and must not have any Repeat, and Willful, or more than three serious OSHA Violations or any EPA violations within the past 3 years. These ratings must be provided by contractor�s insurance company for verification. To our understanding, this should be included to the bidding documents that are to be provided and this language should be included in contracting document for GC required bidding documents. List of contractor trade to include but is not limited as follows. All trade personnel must meet the specifications. Qualified Electricians Drywaller Floor installers Painters Plumbers Fire sprinkler specialists HVAC Place of Performance: Tasks will be performed at the VA Medical Center Durham, VA. Work will be around an occupied healthcare facility in operation 24 hours a day. This work will require appropriate personal protective equipment and proper infection control measures. Work will be phased to minimize disruption to clinic and medical center operations. Period of Performance: Completion of project shall be 238 calendar days from NTP.
Who won similar work
25 award notices on SAM.gov in the last 24 months. Matched by: Same office (246-NETWORK CONTRACTING OFFICE 6 (36C246)), same NAICS 236220.
Single-winner award sizes (25): middle half $197K to $3.8M, median $1.6M; range $28K to $23.9M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| VALIANT CONSTRUCTION LLC | 2 | $43.3M | Sep 2, 2026 |
| PHILLIPS C&C LLC | 2 | $4.8M | May 20, 2026 |
| BTR ENTERPRISES OF SC LLC | 2 | $213K | May 8, 2026 |
| SIGO VALIANT JV II LLC | 1 | $23.0M | Jul 10, 2026 |
| GROUP III MANAGEMENT INC | 1 | $17.5M | Aug 3, 2026 |
| BRIGHT REGARDS, LLC | 1 | $8.5M | Jul 30, 2025 |
| BRYMAK FSI JV, LLC | 1 | $7.6M | Sep 12, 2025 |
| BLUE CORD DESIGN AND CONSTRUCTION, LLC | 1 | $3.8M | Jul 30, 2026 |
| HARBOR SERVICES, INC | 1 | $2.9M | Oct 29, 2025 |
| Yerkes South Inc. | 1 | $2.8M | Aug 24, 2026 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
- Sep 2, 2026VALIANT CONSTRUCTION LLC$19.4MFY26 NRM B3-Fourth Floor PACT Renovation Project # 659-26-800No listed company matched (Materiality N/A)
- Aug 24, 2026Yerkes South Inc.$2.8MZ2DA--RENOVATE PROSTHETICSNo listed company matched (Materiality N/A)
- Aug 3, 2026GROUP III MANAGEMENT INC$17.5MY1DA--652-24-103 Increase Surgical AccessNo listed company matched (Materiality N/A)
- Jul 30, 2026BLUE CORD DESIGN AND CONSTRUCTION, LLC$3.8MZ2DA--Correct Site Structural DeficienciesNo listed company matched (Materiality N/A)
- Jul 10, 2026SIGO VALIANT JV II LLC$23.0MZ1NB--Boiler replacementNo listed company matched (Materiality N/A)
- May 20, 2026PHILLIPS C&C LLC$3.8MZ1DA--Renovate Main LobbyNo listed company matched (Materiality N/A)
- May 14, 2026VALIANT CONSTRUCTION LLC$23.9MY1DZ--36C24626C0037 659-22-405 | Install Campus Generator |No listed company matched (Materiality N/A)
- May 8, 2026BTR ENTERPRISES OF SC LLC$184KY1LB--Sidewalks and CrosswalksNo listed company matched (Materiality N/A)
- Mar 6, 2026DAX SAFETY & STAFFING SOLUTIONS, LLC$1.3MZ2DA--Replace MRI 1.5TNo listed company matched (Materiality N/A)
- Feb 20, 2026PHILLIPS C&C LLC$992KZ1DA--658-24-106 Replace Bldg 16 HVACNo listed company matched (Materiality N/A)
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.