56--NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ
Interior (all) · FWS, OVER SAT G/S
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 140F0S26Q0004 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ Type 2 Class B base course with Tailgate spread for Fallon NV. See SOW in solicitation packet for specifications. Provide a statement that you understand the standard for Type 2 Class B base course as defined in the SOW and include your CAGE code in your submission. Email Robert_Sung@fws.gov for questions and your quotes. RFI Q&A response Q1: After reviewing this requirement with our subcontractor, we received the following clarification from them: "If the trucks ran consecutively, they could all dump in sequence, allowing the refuge staff time to work … (show all)
the material before the trucks returned for their second and third trips. The total daily tonnage can be adjusted to suit your needs by increasing or decreasing the number of trucks. We anticipate approximately 800-1,000 tons per shift. The material would be delivered using belly dump trains, leaving a window for the refuge staff to spread. We would revise the proposal to include minimum truck spacing. However, doing so would limit roughly half the trucks to only two loads per day, increasing the cost per ton. Based on this scenario and eight trucks per day, spacing would be approximately 15-30 minutes between loads, followed by about 1.25 hours of downtime between the last truck in the first rotation and the first truck returning for the second rotation. This would result in approximately 800 tons per shift." Based on this, strict adherence to the minimum 15-minute spacing requirement would materially affect operational efficiency and increase the cost per ton. We would respectfully like to inquire whether there is any flexibility in the delivery spacing requirement. Specifically: A. Would consecutive dumping be acceptable if coordinated safely and efficiently with the grading contractor? B. Is the 15-minute minimum interval mandatory throughout the entire shift, or could it be adjusted during certain delivery windows? C. Would alternative staging or sequencing methods be considered, provided safety and site control are maintained? A1: The refuge does have some flexibility on the spacing of the trucks and could be coordinated at that time with the project coordinator. During the work day - we will have a refuge staff member who is stationed to take the tickets from drivers and direct them when it is safe to unload. However, we have completed similar projects at least three times in the past 5 years with various contractors. A 15-minute interval between trucks was generally what they averaged between trucks just based on how long it took the for each load to be filled between the first and the next truck at the gravel pit. Across the projects, delivery has averaged between 800-1k tons per day. For the specific questions: A. Yes, consecutive dumping can be coordinated with the refuge staff who will be completing the gravel grading. B. The 15 minute interval would not be mandatory and could vary throughout the shift, but would need to be coordinated with staff on site. C. Alternative staging or sequencing methods could be considered, provided safety and site control are maintained. The contractor would be responsible for coordinating with the project manager on site and ultimately would be responsible for ensuring the gravel is delivered to its final location on the delivery route.
Who won similar work
9 award notices on SAM.gov in the last 24 months. Matched by: Same office (FWS, OVER SAT G/S), same product/service code (PSC) 5610 and NAICS 212319.
Single-winner award sizes (9): middle half $343K to $970K, median $500K; range $214K to $1.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| ROGERS BROTHERS LAND CLEARING LLC | 3 | $1.1M | Aug 28, 2026 |
| GIVING TREE CAPITAL, LLC | 2 | $2.1M | Sep 25, 2025 |
| GovLink LLC | 1 | $970K | Jul 13, 2026 |
| KERNEN CONSTRUCTION 2350 GLENDALE DR McKinleyville CA 95519 USA | 1 | $585K | Aug 7, 2026 |
| ECOLOGY MIR GROUP LLC | 1 | $343K | Aug 22, 2025 |
| CROWLEY HOLDINGS LLC | 1 | $214K | Jun 13, 2025 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
- Aug 28, 2026ROGERS BROTHERS LAND CLEARING LLC$344K56--FL-ST.MARKS NWR-BPA CALL-ROAD MATERIALNo listed company matched (Materiality N/A)
- Aug 7, 2026KERNEN CONSTRUCTION 2350 GLENDALE DR McKinleyville CA 95519 USA$585K56--CA-HUMBOLDT BAY NWR-BULK MATERIALSNo listed company matched (Materiality N/A)
- Jul 13, 2026GovLink LLC$970K56--VA-CHINCOTEAGUE NWR-AGGREGATE MATERIALSNo listed company matched (Materiality N/A)
- Jul 1, 2026ROGERS BROTHERS LAND CLEARING LLC$500K56--FL-ST. MARKS NWR-ROAD MATERIALNo listed company matched (Materiality N/A)
- Sep 25, 2025GIVING TREE CAPITAL, LLC$1.0M56--VIEQUES NWR- Road Fill MaterialNo listed company matched (Materiality N/A)
- Aug 28, 2025ROGERS BROTHERS LAND CLEARING LLC$233K56--FL-ST. MARKS NWR-ROAD MATERIAL BPANo listed company matched (Materiality N/A)
- Aug 22, 2025ECOLOGY MIR GROUP LLC$343K56--GA-FWS DIVISION OF ENGINEERING-GRAVELNo listed company matched (Materiality N/A)
- Aug 8, 2025GIVING TREE CAPITAL, LLC$1.0M56--PR-VIEQUES NWR-PRIORITY ROADS REHABNo listed company matched (Materiality N/A)
- Jun 13, 2025CROWLEY HOLDINGS LLC$214K56--Chincoteague NWR Road Material for construction prNo listed company matched (Materiality N/A)
Competitive landscape
For the 6 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Interior, Dept of (DOI) since 2024 (0 filings)
- 0 of their lobbyists list a past Interior, Dept of (DOI) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 150 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.