J--NEW ICF MAINT FREEZER
Interior (all) · OFC OF ACQUISITION GRANTS-DENVER
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 140G0225Q0044 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
The U.S. Geological Survey (USGS) on behalf of the U.S. National Science Foundation (NSF) has a requirement for operations and maintenance (O&M) services of a newly constructed CO2 refrigeration plant and all associated subsystems. THIS IS A SOURCES SOUGHT NOTICE ONLY FOR MARKET RESEARCH PURPOSES. THIS IS NOT A REQUEST FOR PROPOSAL (RFP), REQUEST FOR QUOTATIONS (RFQ) OR INVITATION FOR BID (IFB). NO FORMAL SOLICITATION IS BEING REQUESTED UNDER THIS NOTICE. This Sources Sought Notice is for market research purposes to identify parties having an interest in and resources to support this requireme… (show all)
nt for operations and maintenance services of a newly constructed C02 refrigeration plant and supporting systems located in building 810, Denver Federal Center, Denver, Colorado. The result of this market research will contribute to determining the method of procurement. The Government will review the information requested in this announcement based on the responses to this sources sought notice/market research, this requirement may be set-aside for small businesses or procured through full and open competition. The North American Industry Classification System (NAICS) code is 238220 (Plumbing, Heating, and Air Conditioning Contractors) and the size standard is $19.0 Million. The following is a brief description of services that are required to be performed but not limited to: 1.0 Introduction The U.S. Geological Survey (USGS) on behalf of the U.S. National Science Foundation (NSF) manages the NSF Ice Core Facility (NSF-ICF). This facility is physically located in E Bay, building 810, on the Denver Federal Center, Denver, Colorado. The NSF-ICF has a requirement for operations and maintenance (O&M) services of a newly constructed CO2 refrigeration plant and all associated subsystems. The NSF-ICF CO2 refrigeration plant and associated subsystems had an expected completion date of June 2025, an official commissioning date of July 2025, followed by a six-month run-in period. If the NSF-ICF CO2 refrigeration plant and associated subsystems perform within operational requirements during the six-month period, ice cores will be moved from the existing facility to the NSF-ICF CO2 refrigeration plant in January- February 2026. 2.0 Background The NSF-ICF CO2 refrigeration plant is a highly specialized facility in Denver, CO. It stores over 30,000 meters of ice cores that have been drilled from the world's ice-covered regions for scientific investigation of the Earth's past climate and atmosphere. To date, the cost of acquiring the samples stored in the NSF-ICF CO2 refrigeration plant is approximately $750M. Due to lack of accessibility to collection sites and environmental changes recollection of many of the unique samples is impossible. The ice core samples must be stored at temperatures well below freezing and within a narrow temperature range to maintain sample integrity. It is not enough that the cores be prevented from melting, if the stored samples warm to approach the freezing point, components of the old air and other trapped substances in the ice may migrate out of the ice destroying the scientific integrity of the ice and rendering the samples useless. In addition, if the temperatures vary too much, even within a range of subfreezing temperatures, the ice can undergo disastrous structural and chemical changes, again affecting the scientific integrity of the samples. 3.0 Scope The NSF-ICF CO2 refrigeration plant is an extremely complicated and custom facility utilizing new trans critical CO2 technology and associated controls and supporting subsystems. Operating and maintaining the facility to manufacturer specifications is essential. Accomplishing on-site preventative maintenance, regular maintenance, and emergency response services for the NSF-ICF CO2 refrigeration plant and associated subsystems while meeting the technical specifications is a key factor in evaluating sources sought capabilities. 4.0 Technical Requirements The NSF-ICF maintains refrigeration using a M&M Carnot transcritical CO2 refrigeration system (CO2 system). The CO2 system ensures temperatures remain within technical operating requirements so the integrity of ice core samples is preserved. A description of the system, as well as the technical operating requirements are described in the following sections. 4.1 System Description The CO2 system consists of the following major components: - Transcritical CO2 compressor racks - Gas coolers/condensers - Flash gas bypass system - High-pressure controls and valves - Heat reclaim system for hydronic floor application - Electronic expansion valves - System controllers and automation - Safety systems and pressure relief devices - CO2 leak detection system The CO2 system includes an integrated hydronic floor system. The hydronic floor system covers approximately 6000 square feet divided into 24 independently controlled zones. The hydronic floor system consists of the following major components: - Heat exchanger interface with the CO2 system - Primary and secondary circulation pumps - Distribution manifolds - Hydronic piping network embedded in floor - Zone control valves and actuators - Temperature sensors and controls - Expansion tanks and pressure regulation - Water treatment system The CO2 system includes an integrated control system with the following major components: - Building Management System (BAS) interface - CO2 system controller - Hydronic system controller - Remote monitoring capabilities - Alarm and notification systems - Data logging and trend analysis tools - Energy management controls The CO2 system is comprised of hermetically sealed CO2 compressors, control modules and oil separators on two separate racks, two Gunter adiabatic gas coolers adjacent to the mechanical room at an elevation higher than the mechanical room to utilize gravity flow, a digital control system that monitors the system, plus eight evaporators. The evaporators are in three separate refrigerated spaces (Ice Core Storage, Examination, Staging) and are fully redundant. All evaporators are controlled via evaporator control and power panels located in the machine room. The CO2 system includes heat pumps and a monitored subfloor hydronic system, an associated HVAC and filtration system, stainless steel piping system, and heat traced condensate drains and monitoring. The CO2 system is monitored by a CO2 leak detection system. 4.2 Technical Requirements The O&M Contractor shall perform the operational requirements to meet or exceed the manufacturer�s performance standards. For Continuous Operation: - Ensure 24 hour, 7 days a week, and 365 days a year operation of the NSF-ICF CO2 refrigeration plant and associated subsystems, including holidays, through maintenance activities, and responding to and resolving on-call issues. - Maintain system uptime of no less than 99.5%, excluding scheduled maintenance, through monitoring, preventive maintenance, and regular maintenance. - Provide temporary cooling solutions if system downtime exceeds 8 hours. For Energy Optimization: - Continuously optimize system operations through preventive and regular maintenance activities to minimize energy consumption. - Adjust operating parameters through preventive and regular maintenance activities based on ambient conditions, facility load, and utility rates to minimize energy consumption. - Maximize utilization of heat recovery for hydronic floor system through preventive and regular maintenance activities. For Remote Monitoring and Control: - Monitor system parameters remotely 24 hours, 7 days a week, and 365 days a year. - Respond to alarms in a timely manner to evaluate issues, repair as appropriate, and ensure technical specifications are met. - Make remote adjustments to system parameters as needed to ensure technical specifications are met. - Maintain secure access protocols for remote system access to ensure systems are not corrupted by external entities. - Ensure backup monitoring s
Who won similar work
8 award notices on SAM.gov in the last 24 months. Matched by: Same office (OFC OF ACQUISITION GRANTS-DENVER), same NAICS 238220.
Single-winner award sizes (8): middle half $11K to $131K, median $24K; range $5K to $351K.
| Winner | Awards | Value | Last |
|---|---|---|---|
| DS DESIGNS LLC | 2 | $343K | Sep 22, 2026 |
| Tolin Mechanical Systems Company | 1 | $351K | Sep 24, 2026 |
| GRANITE GROUP, LLC | 1 | $70K | Sep 23, 2026 |
| BLUE CONSTRUCTION SERVICES LLC | 1 | $21K | Sep 18, 2025 |
| ARABIC INTERPRETERS LLC | 1 | $11K | Sep 16, 2026 |
| JMG Ventures, LLC | 1 | $10K | Sep 22, 2025 |
| AMERICAN BUILDING ENVIRONMENTS LLC | 1 | $5K | Aug 28, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Sep 24, 2026Tolin Mechanical Systems Company$351KJ--Ice Core Freezer MaintenanceNo listed company matched (Materiality N/A)
- Sep 23, 2026GRANITE GROUP, LLC$70KJ--BOU HVAC REPLACEMENTSNo listed company matched (Materiality N/A)
- Sep 22, 2026DS DESIGNS LLC$27KZ--UMESC AIR HANDLER REPLACEMENTNo listed company matched (Materiality N/A)
- Sep 16, 2026ARABIC INTERPRETERS LLC$11KJ--FRD BLDG 8 HEAT PUMP REPLACEMENTNo listed company matched (Materiality N/A)
- Aug 28, 2026AMERICAN BUILDING ENVIRONMENTS LLC$5KJ--HVAC Preventative MX 22-AD-HVAC-OY4No listed company matched (Materiality N/A)
- Jul 9, 2026DS DESIGNS LLC$316KN--UMESC HYDRONIC BOILER REPLACEMENTNo listed company matched (Materiality N/A)
- Sep 22, 2025JMG Ventures, LLC$10KN--Mini Split AC Units - Guam Magnetic ObservatoryNo listed company matched (Materiality N/A)
- Sep 18, 2025BLUE CONSTRUCTION SERVICES LLC$21KK--FRD BLDG 8 HEAT PUMP REPLACEMENT CONTRACT AWARDNo listed company matched (Materiality N/A)
Competitive landscape
For the 7 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Interior, Dept of (DOI) since 2024 (0 filings)
- 0 of their lobbyists list a past Interior, Dept of (DOI) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 149 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.