140-ton 10-foot Hydraulic Press Brake
Army · W7NK USPFO ACTIVITY MTANG 120
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation W50S7L-26-Q-A004 in this department, oldest first.
- Sep 2, 2026Combined Synopsis/SolicitationOpen
- Sep 3, 2026Combined Synopsis/SolicitationOpen
- Sep 3, 2026Combined Synopsis/SolicitationOpen
- Sep 9, 2026Combined Synopsis/SolicitationOpen
- Sep 10, 2026Combined Synopsis/SolicitationOpen
- Sep 13, 2026 · this noticeCombined Synopsis/Solicitation
- Sep 15, 2026Combined Synopsis/SolicitationOpen
- Sep 16, 2026Combined Synopsis/SolicitationOpen
- Sep 16, 2026Combined Synopsis/SolicitationOpen
- Sep 21, 2026Combined Synopsis/SolicitationOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
Amendment 5 The purpose of this amendment is to provide answers to questions that have been received up to 9/13/2026 and to change the required delivery date on CLIN 0001/0002 to 31 January 2026. Does any wage determination, prevailing wage schedule, Service Contract Labor Standards requirement, certified payroll requirement, or contractor trade-license requirement apply to CLIN 0002? No, it does not apply The requirement calls for certified heavy machinery riggers, while Amendment 4 states that riggers will need Real ID for facility access. Is any specific rigger certification or license requ… (show all)
ired in addition to the Real ID and EAL access requirements? No specific rigger certifications or licenses are required Our understanding of Amendment 4 is that the on-site installation electrician will perform the final electrical connection, and that the contractor/manufacturer should not include facility-side electrical wiring to the disconnect/panel. Please confirm. The on-site electrician will perform the final connection The solicitation pricing schedule lists CLIN 0002 as quantity 1, unit EACH, while the current notice description identifies CLIN 0002 as quantity 1 Job (JB). Which unit should quoters use on the completed pricing schedule? Each or Job is acceptable as long as the quantity is 1 (one) We have a machine option that meets the technical as well as DFAR requirements, however, the manufacturer is currently quoting approximately 14�16 weeks for delivery. Is November 30 a firm required delivery date, or would the Government consider an otherwise compliant offer with a delivery date beyond November 30 (approximately 1 month later)? The November 30 delivery date is the Government's preferred delivery target; however, it is not a mandatory pass/fail technical threshold. The Government will consider and evaluate technically compliant quotes that propose a firm delivery and installation completion date on or before December 31. Offerors must explicitly state their best realistic delivery lead time (in weeks after receipt of order) within their technical proposal, which will be binding upon contract award. End Amendment 5 Amendment 4 The purpose of this amendment is provide answers to questions that have been received up to 9/10/2026. The solicitation includes FAR 52.225-3/52.225-4 and provides for identification of �Other Foreign End Products�; however, the solicitation also states that the offered machine must be manufactured in the United States, a DFARS qualifying country, or a TAA-compliant country. Please confirm whether an end product manufactured in China may be offered and evaluated under FAR 52.225-3, or whether Chinese-origin equipment is specifically excluded from consideration. Equipment manufactured in the People's Republic of China (or any other non-qualifying, non-TAA compliant country) is SPECIFICALLY EXCLUDED from consideration and will be evaluated as TECHNICALLY UNACCEPTABLE. Can you provide more details on the electrical run. Conduit type, for instance. Will it be overhead or along a wall? Is a scissor lift required for electrical install? In the RFQ, it stated that the government would wire to a disconnect and only the final connections would need to be made. The additional information provided, seems to contradict the RFQ by stating that the electrical would be run from the main panel? Conduit is in the floor, installation electrician is on site, electrical panel is 35-40 ft away. Does the electrician need special certifications to work onsite? Installation electrician is on site Also, for the riggers, do they need special certifications to work onsite?� They will need a Real ID to get on base. Electrical Connection: Further clarification is needed. Please confirm that the Government/end user will provide the electrical drop, disconnect, and required electrical connection so that the machine can be connected and placed into service at installation. By law, the manufacturer or rigging contractor cannot perform electrical wiring. Installation Electrician will be on site to connect power Facility Access: Please advise what credentials or forms of identification will be required for the freight carrier, rigging crew, manufacturer�s technician, and/or trainer to enter the facility. Real ID is required along with an EAL Offloading Equipment: Is there an onsite forklift of sufficient capacity available for use in offloading and positioning the machine, or should the rigging contractor provide all required forklift/crane equipment? Yes Startup/Test Bend: The solicitation requires a live test bend using Government-furnished material. Please confirm that the Government will have the appropriate material available onsite at the time of startup/commissioning and training. Yes, we will have material on-site Final Machine Placement: Please confirm that the final machine placement area is a flat, level concrete surface suitable for installation and anchoring of the approximately 14,000�16,000 lb press brake. Yes IUID: Please confirm if an IUID is required for this purchase. Yes End Amendment 4 Amendment 3 The purpose of this amendment is provide answers to questions that have been received up to 9/8/2026. Category 1: Tooling & Material Specifications Material Types & Thickness: What are all the material thicknesses you intend to form (from thinnest to thickest)? What are the specific types and grades of material you will be working with (e.g., A36 Mild Steel, 5052 Aluminum, 304 Stainless Steel)? 321 Stainless Steel 0.016 � 0.180 302 Stainless Steel 0.016 � 0.180 4901 Titanium 0.020 � 0.120 9046 Titanium 0.020 � 0.120 2024-T3 Aluminum 0.016 � 0.125 2024-T81 Aluminum 0.016 � 0.125 7075-O Aluminum 0.030 � 0.160 7075-T6 Aluminum 0.030 � 0.160 6061-O Aluminum Up To 0.125 (No other sizes are listed in our inventory) 7075-T651 Up to 0.250 (No other sizes are listed in our inventory) 5052-H43 0.020 � 0.375 Mild Steel 0.020 � 0.250 Tooling Configuration: For each material type and thickness, what is the required tooling configuration?. What are the required V-opening sizes for the Multi-V Bottom Die? Please provide specifics. Selecting the correct V-opening (V) depends heavily on your material thickness (T) and type. Mild Steel: formula: V = 8 � T Stainless Steel (Harder): typically V = 10 � T or 12 � T Aluminum (Softer): Often uses V = 6 � T for soft grades, or up to 10 � T - 12 � T for hard/T6 grades to prevent surface cracking. What are the required punch dimensions and angles for the Gooseneck Punch? Tip Working Angle: Ranges from 30�, 45�, 60�, 85�, 88�, to 90�. Springback Target Angle: Usually 88� or 86� for air-bending standard 90� parts. Outward Neck Angle: Ranges between 42� and 45� to provide relief clearance. Clamping Method: The solicitation specifies "quick-release clamping." Please clarify the preferred method: a) Hydraulic Clamping Category 2: Machine Configuration & CNC System CNC Gauging Axes: What is the required number of CNC gauging axes? CNC Control: 2-axis to 5-axis CNC with programmable sequences for repeatable bends Is there a specific back gauge configuration required? Back Gauge: Programmable back gauge for precise material positioning. Back Gauge Length: 23.6 � 25.6 in. Back Gauge Motor: � hp Category 3: Facility, Installation & Rigging Installation Location: What is the building number and exact installation location for the press brake? Bldg 80 Aircraft Structural Maintenance shop Please confirm if "Building 60" is the final installation site or only the ship-to/receiving address. Only the ship-to/receiving address. Rigging & Placement Path: Can you provide photos or drawings of the entire delivery and rigging path? This should include: Exterior access points to the building. 12x12 ft Exterior overhead door / 2 ft grade Dimensions of overhead doors and interior doors/openings. 10x10 ft interior overhead door / 1ft grade Any changes in floor elevation or steps. No The total distance from the unloading point to the final place
Who won similar work
45 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Army), same NAICS 333517.
Single-winner award sizes (45): middle half $64K to $1.1M, median $246K; range $17K to $34.2M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| PHILLIPS CORPORATION | 4 | $35.5M | Sep 30, 2025 |
| MORRIS SOUTH, LLC | 2 | $4.5M | Jul 6, 2026 |
| MACHINE TOOL MARKETING INC | 2 | $2.2M | Sep 15, 2025 |
| Aantilia LLC | 2 | $837K | May 13, 2026 |
| FLINT MACHINE TOOLS, INC. | 1 | $16.2M | Sep 2, 2026 |
| DMG MORI FEDERAL SERVICES, INC. | 1 | $8.6M | Oct 1, 2026 |
| CR ONSRUD INC | 1 | $5.0M | Feb 27, 2026 |
| UNITED PRECISION SERVICES, INC. | 1 | $4.8M | Sep 14, 2026 |
| Fiber Laser Cutting Machine Tobyhanna PA 18466 USA | 1 | $1.8M | Sep 17, 2025 |
| TRION COATINGS, LLC | 1 | $1.7M | May 23, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Oct 14, 2026ALL WORLD MACHINERY SUPPLY INC$1.1MW519TC-26-Q-A173 CNC Grinders Solicitation Amendment 0001 Award NoticeNo listed company matched (Materiality N/A)
- Oct 2, 2026KMH SUPPLY COMPANY$87KMNA SMCJ BandsawNo listed company matched (Materiality N/A)
- Oct 1, 2026DMG MORI FEDERAL SERVICES, INC.$8.6MMill Turn Machine for the Watervliet ArsenalNo listed company matched (Materiality N/A)
- Sep 25, 2026CODESOURCE, L.P.$97KLaser Engraving SystemNo listed company matched (Materiality N/A)
- Sep 25, 2026REPUBLIC MACHINERY CO INC$95KHigh Speed Precision Gap Bed LatheNo listed company matched (Materiality N/A)
- Sep 17, 2026ROCKLIN MANUFACTURING CO Sioux City IA 51101 USA$60KMobile Laser CleanerNo listed company matched (Materiality N/A)
- Sep 15, 2026Supernova International Inc$58KLaser EngraverNo listed company matched (Materiality N/A)
- Sep 15, 2026QUAKELOGIC, INC.$37KSupply and Deliver New Hydraulic IronworkerNo listed company matched (Materiality N/A)
- Sep 14, 2026UNITED PRECISION SERVICES, INC.$4.8MCNC 5 Axis Gantry MillNo listed company matched (Materiality N/A)
- Sep 2, 2026FLINT MACHINE TOOLS, INC.$16.2MComputer Numerical Control (CNC) Gantry Machining Center (GMC)No listed company matched (Materiality N/A)
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.