78--2026 Steel Pavilions
Interior (all) · COLORADO STATE OFFICE
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 140L1726Q0036 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
Amendment 0006: In response to a vendor submitted question: Q1. The summary and coating paragraph indicate 24 shelters, while the post/upright color paragraph indicates 27. Page 1 also includes a �Quantity: 8 Total� reference. Could you please confirm the total number of shelters we should use for pricing purposes? A1. The requirement is for the following quantities. Any inconsistencies to volume shall be clarified to the following. CLIN 00011: 10 ft x 10 ft prefabricated Steel Pavilion, 24 each, Rob Jaggers Campground (incl freight) CLIN 00020: 20 FT X 20 FT prefabricated Steel Pavilion, 1 ea… (show all)
ch, Datil Campground CLIN 00030: 16 FT X 16 FT prefabricates Steel Pavilion, 4 each, Datil Campground CLIN 00040: Freight costs allocable to Datil Campground Amendment 0005: The purpose of this modification is to clarify prior question and answer. All other terms and conditions remain unchanged. 3. Post/Upright Quantity: Under the coating requirements, the specifications reference color selection for the "24 each � 10' x 10'" post/uprights, while the procurement is for 24 shelters. Please confirm that this is a typographical error and that the requirement applies to all posts/uprights associated with the 24 shelters. RE: Datil Well CG Shelters ONLY � Minimum Specifications: Quantity of 5 (five) as specified: 1. Length x Width -20 feet x 20 feet to roofline (1 each): all steel, square, hip roof shelters 2. Length x Width - 16 feet x 16 feet to roofline (4 each): all steel, square, hip roof shelters RFO: Rob Jaggers Faciltiy requires quantity of 24 Each. Total = 24 � 10� x 10� (RFO NCA) + 5 (SFO Datil CG) = 29 total to 2 different locations Amendment 0004: The purpose of this modification is to provide the below questions and answers. 1. Snow and Wind Loads: The specifications state that the ground snow load and wind speed loading are to be determined by site-specific design(by manufacturer), but the required PSF and MPH values are blank. Can BLM provide the required ground snow load and design wind speed for the Rob Jaggers Campground location? RE: Datil Well CG Shelters ONLY � these values are blank as a requirement of the building manufacturer to calculate and provide in the response to this solicitation. These values need to be based on the site-specific locations, as provided and current building codes. BLM does not have the expertise to determine wind and snow load and that is why BLM is requiring those structural loads to be calculated by the building manufacturer. RFO: Manufacture will have to use any national or local codes for load and wind specifications. 2. Applicable Building Code: The specification references "2018 IBC, or newer." Can BLM confirm the specific edition of the IBC and any locally applicable amendments that should be used for the engineered shelter and foundation designs? RE: Datil Well CG Shelters ONLY � the Building Codes, as specified in the SOW, shall be determined by the manufacturer literally as �2018 IBC or newer�, which the building manufacturers must be capable to determine and show compliance with. These values are based on the provided site-specific locations and the most current building codes. BLM does not have the expertise to determine these and that is why BLM is requiring code compliance to be determined by the building manufacturer. This response applies to both shelter and foundation design. RFO: Concur with the above statement. 3. Post/Upright Quantity: Under the coating requirements, the specifications reference color selection for the "24 each � 10' x 10'" post/uprights, while the procurement is for 24 shelters. Please confirm that this is a typographical error and that the requirement applies to all posts/uprights associated with the 24 shelters. RE: Datil Well CG Shelters ONLY � Minimum Specifications: Quantity of 5 (five) as specified: 1. Length x Width -20 feet x 20 feet to roofline (1 each): all steel, square, hip roof shelters 2. Length x Width - 16 feet x 16 feet to roofline (4 each): all steel, square, hip roof shelters RFO: Rob Jaggers Faciltiy requires quantity of 24 Each. Total = 24 (RFO NCA) + 5 (SFO Datil CG) = 29 total to 2 different locations 4. Delivery vs. Installation: Please confirm that this procurement is for manufacture and delivery only, and that installation, excavation, concrete foundations/footings, anchor installation, and shelter erection will be performed by others. The specifications require engineered foundation drawings and anchor templates but do not expressly state that the contractor is responsible for construction/installation. RE: Datil Well CG Shelters ONLY � Exactly as the Specifications indicate this procurement is for manufacture and delivery only. There will be absolutely no installation, excavation, concrete foundations/footings, anchor installation, since the shelter erection will be performed later by others. Vendor must follow delivery instructions. RFO: Same as above. 5. Offloading: The specifications state that the contractor is responsible for offloading and that site conditions will require an off-road forklift or equivalent machine. Can BLM confirm whether the contractor must furnish and operate the off-road forklift/telehandler at delivery, with no Government-furnished unloading equipment available? RE: Datil Well CG Shelters ONLY � BLM will offload if the required advanced notice is provided. Vendor must follow delivery instructions. RFO: Contractor will need to provide offloading services of the above mentioned equipment. 6. Delivery Date: The solicitation identifies October 30, 2026 as the delivery date. Please confirm whether all 24 (29 in this combined Solicitation) shelters must be delivered in a single shipment by October 30, or whether phased/partial deliveries prior to October 30 are acceptable. RE: Datil Well CG Shelters ONLY � The shelters can be delivered as either a partial or complete quantity, if the delivery instructions are followed. However, payment cannot be invoiced or paid until the entire quantity is delivered, inspected, and accepted. For Datil CG the final delivery date is flexible based on manufacturers required lead time. RFO: Same as above. 7. Warranty: The evaluation criteria state that a minimum ten-year warranty should be offered for "materials and/or workmanship," while the specifications state a minimum ten-year warranty against manufacturer defects. Please confirm the required warranty standard and whether a manufacturer's standard 10-year warranty against manufacturing defects satisfies this requirement. RE: Datil Well CG Shelters ONLY � If the Industry Standard as offered by the Manufacturer for "materials and/or workmanship," is 10 years, BLM will not accept a warranty less than the manufacturer's and industry standard. RFO: Same as above. 8. Quantity Clarification: The solicitation calls for 24 shelters, but the specifications contain the language "Quantity: 8 Total: 24 each of 10' x 10' shelters." Please confirm that the total required quantity is 24 shelters. RE: Datil Well CG Shelters ONLY � Minimum Specifications: Quantity of 5 (five) as specified: 3. Length x Width -20 feet x 20 feet to roofline (1 each): all steel, square, hip roof shelters 4. Length x Width - 16 feet x 16 feet to roofline (4 each): all steel, square, hip roof shelters 5. RFO: Rob Jaggers Faciltiy Specs require quantity of 24 Each 10 feet x 10 feet all steel, square, hip roof shelters. Total = 24 (RFO NCA) + 5 (SFO Datil CG) = 29 total to 2 different locations 9. Foundation Engineering: The manufacturer is required to provide sealed foundation/footing designs for the installation area. Will BLM provide geotechnical or soil-bearing information for the Rob Jaggers Campground site, or should offerors use an assumed allowable soil-bearing capacity for design? RE: Datil Well CG Shelters ONLY � offerors shall use an assumed allowable soil-bearing capacity for design. BLM will not provide geotechnical or soil-bearing information for design. RFO: Same as above s
Who won similar work
22 award notices on SAM.gov in the last 24 months. Match: Same agency (Interior (all)), same NAICS 332311.
| Winner | Awards | Value | Last |
|---|---|---|---|
| A & A SHEET METAL PRODUCTS INC | 2 | $120K | Sep 24, 2026 |
| HORIZON STRUCTURES LLC | 2 | $83K | May 21, 2026 |
| CONTAINERS UNLIMITED LLC | 2 | $80K | Sep 11, 2026 |
| MOOWEEP LLC | 2 | $20K | Apr 16, 2026 |
| NORTHSTAR INTERNATIONAL LLC · $MCK | 1 | $1.7M | Aug 28, 2025 |
| BURHANI ENTERPRISES INC | 1 | $1.2M | Aug 17, 2026 |
| WE BUILD LLC | 1 | $1.1M | Aug 12, 2026 |
| SABALA MANAGEMENT LLC | 1 | $305K | Jun 11, 2025 |
| ALLIANCE NETWORK INTEGRATORS LLC | 1 | $127K | May 28, 2026 |
| VISIONARY EXPERTS LLC | 1 | $120K | Jul 30, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Sep 24, 2026A & A SHEET METAL PRODUCTS INC$23K54--WA-TURNBULL NWR-PESTICIDE STORAGE BLDG
- Sep 22, 2026A & A SHEET METAL PRODUCTS INC$97K54--BLM ALASKA, FDO HAZMAT STORAGE UNIT
- Sep 15, 2026SEVENTH GENIUS LLC$18K54--Car Port for Red Rock Day School
- Sep 11, 2026CONTAINERS UNLIMITED LLC$39K54--SUPPLY: AZ-AZ FWCO-SHIPPING CONTAINER OFFICE
- Sep 1, 2026CONTAINERS UNLIMITED LLC$41K39--Mobile/Modular Office
- Aug 17, 2026BURHANI ENTERPRISES INC$1.2M56--Boardwalk Materials for Bear River Migratory Birds Refuge
- Aug 12, 2026WE BUILD LLC$1.1M56--Boardwalk Materials for Bear River Migratory Birds Refuge
- Jul 30, 2026VISIONARY EXPERTS LLC$120K54--GREAT AMERICAN OUTDOORS ACTRPFO-NCA PREF-FAB PIC
- May 28, 2026ALLIANCE NETWORK INTEGRATORS LLC$127K56--NV-ASH MEADOWS NWR-BOARDWALK MATERIALS
- May 21, 2026HORIZON STRUCTURES LLC$29K37--VA-BR OF OPERATIONS-DRLE K9 KENNELS-BPA
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Interior, Dept of (DOI) since 2024 (0 filings)
- 0 of their lobbyists list a past Interior, Dept of (DOI) job
- $14K from their corporate PACs since 2024 to members of House Committee on Appropriations, House Committee on Natural Resources, Senate Committee on Appropriations, Senate Committee on Energy and Natural Resources
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 149 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 1 of the past winners are listed companies
- 0 insider buys and 2 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.