SolicitationPosted Aug 18, 2026·Responses due Aug 25, 2026

78--2026 Steel Pavilions

Interior (all) · COLORADO STATE OFFICE

Stage
Open solicitation
NAICS
332311
Value
Not stated
Solicitation
140L1726Q0036
Set-aside
Indian Small Business Economic Enterprise
PSC
7830
Place
Fort Stanton, NM, USA
Contact
Voigt, Scott (scott_voigt@ios.doi.gov)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 140L1726Q0036 in this department, oldest first.

Early notice
None posted
Solicitation
  • Aug 7, 2026
    Solicitation
    Open
  • Aug 7, 2026
    Solicitation
    Open
  • Aug 10, 2026
    Solicitation
    Open
  • Aug 12, 2026
    Solicitation
    Open
  • Aug 12, 2026
    Solicitation
    Open
  • Aug 14, 2026
    Solicitation
    Open
  • Aug 14, 2026
    Solicitation
    Open
  • Aug 18, 2026 · this notice
    Solicitation
Award
Not yet. Typical award: Aug 28, 2026 to Sep 22, 2026, middle of the range Sep 7, 2026.
Measured from 1342 past solicitations at Bureau of Land Management that later posted an award (middle half of cases, counted from Aug 4, 2026).

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

Amendment 0008: The purpose of this amendment is to clarify shipping and material terms subject to inquiry. The solicitation due date is extende3d to August 25th at 0800 MT. All other terms and conditions remain unchanged. Timber is not a qualifying substitute. CLIN 0011 Shipping Address: Rob Jabbers CG: 1612 NM-220, Fort Stanton, NM 88323 CLIN 0020, 0030 Shipping Address: Socorro Field Office, 901 South Highway 85, Socorro, NM 87801-4168 Amendment 0007: The purpose of this amendment is to provide answers to submitted questions: 1. Snow and Wind Design Criteria: The specifications state that t… (show all)

he structures must meet site-specific snow and wind load criteria, while the actual ground snow load and wind speed values are left �to be determined by site specific design.� Please confirm whether the contractor/manufacturer is responsible for determining these site-specific design loads through its licensed engineer, or whether BLM will provide the required design values. A1. This amendment hereby modifies requirements 4 & 5 of the attached specification to remove CUSTOM wind and snow load requirements. Wind and snow load requirements shall be based on building codes applicable to the delivery locations. 2. Delivery Schedule: The solicitation establishes a delivery date of October 30, 2026. Please confirm whether all required shelters must be delivered and accepted by this date and whether partial or phased deliveries are permitted. A2. The delivery due date for all items is 01/31/2027 3. Scope of Work: Please confirm that the contractor�s scope is limited to furnishing, transporting, and offloading the Rob Jaggers Campground shelters, including the required engineered drawings, foundation/footing design, and installation instructions. The specifications require the manufacturer to provide engineered drawings and foundation/footing design, and state that the contractor is responsible for offloading. Please confirm that field erection, concrete foundations/footings, anchoring, and final installation are not included in the contractor�s scope. A3. This is correct... Supply delivery and tech data only Amendment 0006: In response to a vendor submitted question: Q1. The summary and coating paragraph indicate 24 shelters, while the post/upright color paragraph indicates 27. Page 1 also includes a �Quantity: 8 Total� reference. Could you please confirm the total number of shelters we should use for pricing purposes? A1. The requirement is for the following quantities. Any inconsistencies to volume shall be clarified to the following. CLIN 00011: 10 ft x 10 ft prefabricated Steel Pavilion, 24 each, Rob Jaggers Campground (incl freight) CLIN 00020: 20 FT X 20 FT prefabricated Steel Pavilion, 1 each, Datil Campground CLIN 00030: 16 FT X 16 FT prefabricates Steel Pavilion, 4 each, Datil Campground CLIN 00040: Freight costs allocable to Datil Campground Amendment 0005: The purpose of this modification is to clarify prior question and answer. All other terms and conditions remain unchanged. 3. Post/Upright Quantity: Under the coating requirements, the specifications reference color selection for the "24 each � 10' x 10'" post/uprights, while the procurement is for 24 shelters. Please confirm that this is a typographical error and that the requirement applies to all posts/uprights associated with the 24 shelters. RE: Datil Well CG Shelters ONLY � Minimum Specifications: Quantity of 5 (five) as specified: 1. Length x Width -20 feet x 20 feet to roofline (1 each): all steel, square, hip roof shelters 2. Length x Width - 16 feet x 16 feet to roofline (4 each): all steel, square, hip roof shelters RFO: Rob Jaggers Faciltiy requires quantity of 24 Each. Total = 24 � 10� x 10� (RFO NCA) + 5 (SFO Datil CG) = 29 total to 2 different locations Amendment 0004: The purpose of this modification is to provide the below questions and answers. 1. Snow and Wind Loads: The specifications state that the ground snow load and wind speed loading are to be determined by site-specific design(by manufacturer), but the required PSF and MPH values are blank. Can BLM provide the required ground snow load and design wind speed for the Rob Jaggers Campground location? RE: Datil Well CG Shelters ONLY � these values are blank as a requirement of the building manufacturer to calculate and provide in the response to this solicitation. These values need to be based on the site-specific locations, as provided and current building codes. BLM does not have the expertise to determine wind and snow load and that is why BLM is requiring those structural loads to be calculated by the building manufacturer. RFO: Manufacture will have to use any national or local codes for load and wind specifications. 2. Applicable Building Code: The specification references "2018 IBC, or newer." Can BLM confirm the specific edition of the IBC and any locally applicable amendments that should be used for the engineered shelter and foundation designs? RE: Datil Well CG Shelters ONLY � the Building Codes, as specified in the SOW, shall be determined by the manufacturer literally as �2018 IBC or newer�, which the building manufacturers must be capable to determine and show compliance with. These values are based on the provided site-specific locations and the most current building codes. BLM does not have the expertise to determine these and that is why BLM is requiring code compliance to be determined by the building manufacturer. This response applies to both shelter and foundation design. RFO: Concur with the above statement. 3. Post/Upright Quantity: Under the coating requirements, the specifications reference color selection for the "24 each � 10' x 10'" post/uprights, while the procurement is for 24 shelters. Please confirm that this is a typographical error and that the requirement applies to all posts/uprights associated with the 24 shelters. RE: Datil Well CG Shelters ONLY � Minimum Specifications: Quantity of 5 (five) as specified: 1. Length x Width -20 feet x 20 feet to roofline (1 each): all steel, square, hip roof shelters 2. Length x Width - 16 feet x 16 feet to roofline (4 each): all steel, square, hip roof shelters RFO: Rob Jaggers Faciltiy requires quantity of 24 Each. Total = 24 (RFO NCA) + 5 (SFO Datil CG) = 29 total to 2 different locations 4. Delivery vs. Installation: Please confirm that this procurement is for manufacture and delivery only, and that installation, excavation, concrete foundations/footings, anchor installation, and shelter erection will be performed by others. The specifications require engineered foundation drawings and anchor templates but do not expressly state that the contractor is responsible for construction/installation. RE: Datil Well CG Shelters ONLY � Exactly as the Specifications indicate this procurement is for manufacture and delivery only. There will be absolutely no installation, excavation, concrete foundations/footings, anchor installation, since the shelter erection will be performed later by others. Vendor must follow delivery instructions. RFO: Same as above. 5. Offloading: The specifications state that the contractor is responsible for offloading and that site conditions will require an off-road forklift or equivalent machine. Can BLM confirm whether the contractor must furnish and operate the off-road forklift/telehandler at delivery, with no Government-furnished unloading equipment available? RE: Datil Well CG Shelters ONLY � BLM will offload if the required advanced notice is provided. Vendor must follow delivery instructions. RFO: Contractor will need to provide offloading services of the above mentioned equipment. 6. Delivery Date: The solicitation identifies October 30, 2026 as the delivery date. Please confirm whether all 24 (29 in this combined Solicitation) shelters must be delivered in a single shipment by October 30, or whether phased/partial deliveries prior to October 30 are acceptable. RE: Datil Well CG Shelters ONLY � The shelters can be delivered as either

Who won similar work

6 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Interior (all)), same product/service code (PSC) 7830.

Single-winner award sizes (6): middle half $31K to $49K, median $43K; range $23K to $57K.

WinnerAwardsValueLast
J & N MARKETING, INC.1$57KJul 22, 2025
SAVE AGAIN.COM 28027 LINDA LN Santa Clarita CA 91350 USA1$50KDec 23, 2024
BEAVERFIT NORTH AMERICA LLC1$44KSep 23, 2025
BHAYANA BROTHERS LLC1$42KJan 22, 2026
RJ THOMAS MANUFACTURING COMPANY1$28KJun 5, 2025
FURNITURE LEISURE, INC.1$23KJul 24, 2025

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.

Latest awards

Competitive landscape

For the 6 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Interior, Dept of (DOI) since 2024 (0 filings)
  • 0 of their lobbyists list a past Interior, Dept of (DOI) job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 150 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro