B-21 Utilities & Site Improvements, Communications and Electric Infrastructure, Dyess Air Force Base, Texas
Army Corps of Engineers · W076 ENDIST FT WORTH
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation W9126G27R1CP8 in this department, oldest first.
- Sep 30, 2026 · this noticeSources Sought
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
The purpose of this notice is to refresh the market research previously conducted under Notice ID PANSWD25P0000000232. SOURCES SOUGHT NOTICE For B-21 Utilities & Site Improvements, Communications & Electric Infrastructure at Dyess Air Force Base, Texas This is a SOURCES SOUGHT notice; a market survey, for information only, to be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS NOTICE. No reimbursement will be made for any costs associated with providing information or industry response to this notice or any follow up inf… (show all)
ormation requests. Not responding to this notice does not preclude participation in any future procurement. If a solicitation is released, it will be synopsized in the Government-Wide Point of Entry (GPE). It is the responsibility of potential offerors to monitor the GPE for additional information pertaining to this requirement. Responses to the sources sought will be utilized with other market research methods to establish the planned acquisition strategy. The planned acquisition strategy will be posted as a change to this synopsis, as required by regulation. The purpose of this notice is to gain knowledge of interest, capabilities and qualifications of industry, to include the Small Business Community: Small Business, Section 8(a), Historically Underutilized Business Zones (HUB-Zone), Service-Disabled Veteran-Owned Small Business (SDVOSB), or Women-Owned Small Business (WOSB). All are highly encouraged to respond to solidify the acquisition strategy. The acquisition strategy will be determined based on responses received from this notice and/or other market research methods. The U.S. Army Corps of Engineers � Fort Worth District has been tasked to solicit for and award a firm fixed-price, Design-Bid-Build construction project for Utilities & Site Improvements (U&SI) Communications and Electrical Infrastructure for B-21 Beddown at Dyess Air Force Base, Texas. The Government is seeking experienced firms for the following scope of work: This project adds electrical distribution infrastructure and fiber optic communications infrastructure to the existing base networks, supporting multiple new projects associated with the bed-down of the B-21 weapons system at Dyess Air Force Base. The communications component of this project includes the addition of single mode fiber optic cable in underground concrete encased duct, together with telephone system expansion. The electrical distribution component includes power cabling, also in underground concrete encased duct, as well as pole mounted power conductors and all associated transformers & equipment. Primary Underground Distribution includes new switchgear, cabling, duct banks, manholes & other associated appurtenances. Facilities to be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01, Department of Defense Minimum Antiterrorism Standards for Buildings, and Unified Facility Criteria 4-010-06, Cybersecurity of Facility-Related Control Systems. The Target Price Estimate is between $27,000,000 and $34,000,000. Estimated duration of the project is 600 days. NOTE: The project duration in the actual solicitation could be increased or decreased. The North American Industry Classification System (NAICS) code for this procurement is 237130 which has a small business size standard of $45,000,000. The Product Service Code is Y1NZ�Construction of Other Utilities. Should this action be set-aside for small business, firms are reminded of the requirements under RFO 52.219-14, Limitations on Subcontracting. Firms will not pay more than 85% of the amount paid by the Government to the prime�s subcontractors that are not similarly situated. Any work that a similarly situated entity further subcontracts will count toward the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. Should this action be solicited as Full and Open Competition, a Small Business Participation Proposal will be identified as an evaluation factor in the solicitation. Large Business(es) must comply with RFO 52.219-9 by submitting an acceptable Small Business Subcontracting Plan. Prior Government contract work is not required for submitting a response to this notice. However, respondents are reminded that all construction performance must follow the USACE Safety and Health Requirements Manual (EM 385-1-1), and must also comply with all Federal, State, and local laws, ordinances, codes and/or regulations. Anticipated solicitation issuance is early December 2026, and the estimated proposal due date will be late January 2026. The official notice citing the solicitation number will be issued via the GPE and firms are to register electronically to receive a copy of the solicitation when it is issued. Please review these questions in advance. You will input your answers directly into the online form linked below. 1. Firm�s name, address, point of contact, phone number, Unique Entity Identifier and e-mail address. 2. Firm�s Business Size � LB, SB, 8(a), HUBZone, SDVOSB, or WOSB. 3. Will the firm submit a response as a Joint Venture or other arrangement? If YES, provide specific type: Joint Venture, Mentor-Prot�g�, Teaming Arrangement, or Other 4. Firm�s Bonding Capacity (construction bonding level per contract and aggregate construction bonding level, both expressed in dollars). 5. Firm�s interest in bidding on the solicitation when it is issued. 6. Please briefly describe your organization�s current status regarding the Cybersecurity Maturity Model Certification (CMMC) process. This includes, but is not limited to, whether you are actively working towards certification at a specific level or have already achieved CMMC Certification. If certified, please indicate the achieved level. 7. Firm�s experience to perform the magnitude and complexity outlined in the Scope of Work above by providing: Brief description of the project, customer name, and dollar value of the project � provide at least 3 examples. 8. Planned Source Selection Method: The Government is planning to utilize the Highest Technically Rated Offeror (HTRO) with a Fair and Reasonable Price source selection approach for this requirement. Under this methodology, proposals will be evaluated to determine the highest technically rated offeror, and award will be made to the offeror who represents the highest technically rated proposal if the price is fair and reasonable. No tradeoffs between technical and price will be conducted. Please provide any general feedback, comments, or recommendations regarding the planned use of the HTRO methodology for this project. Are there any risks, advantages, or industry-standard practices the Government should consider when implementing this approach for this specific scope of work? 9. Planned Evaluation Factors: The Government anticipates evaluating the following factors to determine the ratings under the HTRO framework: Factor 1: Past Performance Factor 2 Technical Approach, which is planned to include the following elements, subject to a 30-page limit(excluding tables, illustrations, and drawings): Project Schedule: Detailed narrative and graphic schedules detailing major features of work, activity durations, milestones, sequencing, and float, based on an assumed Notice to Proceed (NTP) date. Disruption Mitigation: Strategies for managing Dyess AFB logistical constraints, mitigating disruption to active flightline/base operations, and minimizing schedule and cost growth. Project Execution Plan: Comprehensive work plan covering site mobilization/demobilization, subcontractor management, safety compliance, environmental measures, and physical/information security. Methodology & Innovation: S
Who won similar work
24 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Army Corps of Engineers), same product/service code (PSC) Y1NZ.
Single-winner award sizes (24): middle half $2.2M to $30.2M, median $7.1M; range $122K to $239.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| CITY LIGHT & POWER JBLM LLC | 2 | $64.9M | Sep 26, 2025 |
| HHI CORPORATION | 1 | $239.0M | Sep 15, 2025 |
| ENERGY RESILIENCE PARTNERS LLC | 1 | $99.6M | Sep 25, 2026 |
| Quanta Government Solutions, LLC · $PWR · $20.9B | 1 | $73.0M | Sep 29, 2026 |
| Harper Construction Company | 1 | $48.0M | Dec 30, 2024 |
| CITY LIGHT & POWER ABERDEEN, LLC | 1 | $30.7M | Sep 29, 2025 |
| Aacon - Raven Volt Joint Venture LLC | 1 | $26.9M | Aug 20, 2026 |
| CITY LIGHT & POWER FTR, LLC | 1 | $26.4M | Jul 7, 2025 |
| DOMINION PRIVATIZATION TEXAS, LLC | 1 | $16.7M | Mar 31, 2026 |
| WRH INC | 1 | $11.8M | Dec 12, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- $PWR reported $20.9B revenue in FY2025. The median single-winner award in these 24 past awards, $7.1M, is under 0.1% of that. 10-K
One award's total value against one year of revenue; many awards are paid over several years.
- Sep 29, 2026Quanta Government Solutions, LLC$73.0MAward Notice: ERCIP Rock Island Arsenal Microgrid
- Sep 29, 2026KOMAN CONSTRUCTION MANAGEMENT, LLC$2.3M88TH RD US ARMY RESERVE CENTER ARLINGTON HEIGHTS, IL WATER INFRASTRUCTURE IMPROVEMENTS- AWARD
- Sep 29, 2026COLT BUILDERS INC$207KBldg. 1025 HVAC at Kirtland AFB
- Sep 25, 2026ENERGY RESILIENCE PARTNERS LLC$99.6MAward Notice: ERCIP Lake City Army Ammunition Plant Microgrid and Combined Heat and Power
- Sep 16, 2026CECIL & CECIL ENTERPRISES INC$5.8MDDJC CENTRALIZED GAS AND ELECTIC METERING, TRACY, CA
- Aug 28, 2026NOWAK CONSTRUCTION CO., INC.$377KWaterline Boring at Fall River Lake, KS
- Aug 20, 2026Aacon - Raven Volt Joint Venture LLC$26.9MERCIP Microgrid and Power Generation Infrastructure at White Sands Missile Range (WSMR) - Las Cruces, New Mexico
- Aug 14, 2026BRANNON CONTRACTING & MAINTENANCE SERVICES, LLC$1.9MCity of McMechen, West Virginia, Stormwater Project - Section 219
- Jun 30, 2026ACCESS COMMUNICATIONS GROUP, LLC$4.2MBldg. 1870 HVAC Upgrades and Repairs, WSMR
- May 19, 2026THE INSPIRED GROUP, LLC$279KGreen Bay Harbor Culvert Repair
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 1 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.