NAVSUP (Naval Supply Systems Command) wants bids for "CABLE ASSEMBLY,SPEC, IN REPAIR/MODIFICATION OF". Bids are due Nov 30, 2026. In the last 2 years, similar work went to 9 companies, usually for about $1.2M per award. An award is expected between November 2026 and May 2027.
Put together from the facts on this page; the details and sources are below.
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation N0038326QLA92 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
CONTACT INFORMATION|4|N792.10|T2Q|N/A|KIMBERLY.FLORES12.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING (COMBO) TYPE||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (… (show all)
DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset Return to the date of asset acceptance under the termsof the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset at the contractor's facility as reflected inthe Action Date entry in the Commercial Asset Visibility (CAV) system. Inaccordance with the CAV Statement of Work, the contractor is required toaccurately report all transactions by the end of the fifth regular businessday after receipt and the Action Date entered in CAV must be dated to reflectthe actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Governmentfor all assets within the RTATs established in the subsequent contract. Required RTAT: 90 days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint foreach NSN(s). Total assets to be repaired monthly after initial deliverycommences X/month (contractor fill in #). A throughput of 0 per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any assetreceived after this date in days is not authorized for repair withoutbi-lateral agreement between the Contractor and NAVSUP WSS ContractingOfficer. All contractual documents related to the instant procurement are considered tobe "issued" by the Government when copies are either deposited in the mail,transmitted by facsimile, or sent by other electronic commerce methods, such asemail. The Governments acceptance of the contractors proposal constitutesbilateral agreement to "issue" contractual documents as detailed herein. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: CABLE ASSEMBLY,SPEC ;014812876; NSN , ;A14G2697-3; Part Number, Shall be performed IAW: CABLE ASSEMBLY,SPEC ;IAW CONTRACTOR DRAWING AND REPAIR PROCESS; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: CABLE ASSEMBLY,SPEC ;A14G2697-3; P/N, ;014812876; NSN, ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS,TECH SPECS,ENGINEERIG ORDERS AND DRAWINGS; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing
Who won similar work
18 award notices on SAM.gov in the last 24 months. Matched by: Same agency (NAVSUP (Naval Supply Systems Command)), same product/service code (PSC) 5995.
Single-winner award sizes (18): middle half $859K to $1.8M, median $1.2M; range $258K to $5.4M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| AMETEK SCP INC · $AME · $7.9B | 5 | $10.9M | Sep 17, 2026 |
| L3HARRIS MARITIME SERVICES INC · $LHX | 4 | $4.2M | Sep 18, 2026 |
| TELEDYNE INSTRUMENTS INC | 3 | $6.0M | Sep 29, 2026 |
| NEWVAC LLC | 1 | $5.4M | May 28, 2026 |
| THE BOEING COMPANY · $BA · $94.0B | 1 | $1.2M | Mar 18, 2025 |
| GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC. · $GD · $53.8B | 1 | $995K | May 22, 2026 |
| CATON CONNECTOR CORPORATION | 1 | $814K | Dec 10, 2025 |
| ARGON ST, INC. | 1 | $444K | Jul 25, 2026 |
| ORDNANCE TECHNOLOGY SERVICE, INC. | 1 | $258K | Jul 18, 2025 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
- $AME reported $7.9B revenue (12 months to Jun 30, 2026). The median single-winner award in these 18 past awards, $1.2M, is under 0.1% of that. SEC filing
- $BA reported $94.0B revenue (12 months to Jun 30, 2026). The median single-winner award in these 18 past awards, $1.2M, is under 0.1% of that. SEC filing
- $GD reported $53.8B revenue (12 months to Apr 5, 2026). The median single-winner award in these 18 past awards, $1.2M, is under 0.1% of that. SEC filing
One award's total value against one year of revenue; many awards are paid over several years.
- Sep 29, 2026TELEDYNE INSTRUMENTS INC$3.5M59--LEAD ASSEMBLY,ELECTNo listed company matched (Materiality N/A)
- Sep 18, 2026L3HARRIS MARITIME SERVICES INC$1.5M59--SI CBLE BI-STBL W17 - AND OTHER REPLACEMENT PARTS$LHX: no recent revenue figure in SEC filings (Materiality N/A)
- Sep 17, 2026AMETEK SCP INC$4.9M59--CABLE ASSEMBLY,POWEMateriality: 0.06% of $AME revenue (Low) SEC
- Sep 12, 2026L3HARRIS MARITIME SERVICES INC$1.5M59--SI CBLE FUSE W12 - AND SIMILAR REPLACEMENT PARTS$LHX: no recent revenue figure in SEC filings (Materiality N/A)
- Aug 13, 2026L3HARRIS MARITIME SERVICES INC$598K59--SI CBLE CPEC A7 W19- AND SIMILAR REPLACEMENT PARTS$LHX: no recent revenue figure in SEC filings (Materiality N/A)
- Aug 13, 2026L3HARRIS MARITIME SERVICES INC$666K59--BI CBL FLEX A43 A41- AND SIMILAR REPLACEMENT PARTS$LHX: no recent revenue figure in SEC filings (Materiality N/A)
- Jul 25, 2026ARGON ST, INC.$444K59--RMC POWER & CONTROL, IN REPAIR/MODIFICATION OFNo listed company matched (Materiality N/A)
- May 28, 2026NEWVAC LLC$5.4M59--CABLE ASSEMBLY,SPECNo listed company matched (Materiality N/A)
- May 27, 2026AMETEK SCP INC$1.0M59--CORD ASSEMBLY,ELECTMateriality: 0.01% of $AME revenue (Low) SEC
- May 22, 2026GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC.$995K59--TOW CABLE,LITTORAL, IN REPAIR/MODIFICATION OFMateriality: <0.01% of $GD revenue (Low) SEC
Materiality: one award's value as a share of the winner's revenue over the latest 12 months in its SEC filings (or its last fiscal year, as noted when you point at it). Low under 1%, Medium 1 to 5%, High 5% or more. Many awards are paid over several years, so this overstates a single year's share.
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 2 of these past winners lobbied Navy, Dept of or U.S. Marines since 2024 (26 filings)
- 0 of their lobbyists list a past Navy, Dept of or U.S. Marines job
- $991K from their corporate PACs since 2024 to members of House Committee on Appropriations, House Committee on Armed Services, Senate Committee on Appropriations, Senate Committee on Armed Services
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 8 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 4 of the past winners are listed companies
- 1 insider buys and 5 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.