EIE466 ADAL JPARC Range Operations Center, Eielson Air Force Base, Alaska
Army Corps of Engineers · W2SN ENDIST ALASKA
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation W911KB27RA003 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE Notice: This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm�s abi… (show all)
lity to submit a proposal should a formal solicitation be issued in the future. NAICS Code: 236210 � Industrial Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Alaska District, has a requirement for constructing a new 3,515 Squar Meter facility across Flight Line Avenue from Building 1151 in support of the Alaska Red Flag mission, including all air operations for major combat training in a joint, multinational, multi-domain, and unconventional environment against 21st-century near-peer competitors. The facility will include administrative space, building support space, and secure workspace for mission-critical activities. The facility shall be a multi-story structure with a non-frost-susceptible foundation system. Work includes, but is not limited to, the construction of a facility with a conventional shallow concrete foundation system, steel structure and framing, and seismic design with special concentrically braced frames. The building exterior will feature Eielson Air Force Base Installation Facility Standards-compliant metal siding panels and a compatible membrane low-slope roof system. Standing seam metal roofing shall be used where visible from the ground. The facility will be air-conditioned and supported by base-wide district utilities for steam, water/sewer, and electricity. Soils remediation is required to mitigate, transport, and dispose of hazardous soils off-site. Infrastructure and facility design should be compatible with applicable Department of Defense, Air Force, and base design standards. Work will include all subgrade and subbase work, drainage, foundation, and facility assembly. Additionally, local materials and construction techniques should be used where cost-effective. The facility will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01. Estimated Acquisition Magnitude: $50,000,000 to $100,000,000 Planned Acquisition Strategy: Anticipated to utilize Construction Manager at Risk via Other Transaction Authority (OTA) The Alaska District is conducting market intelligence to assess industry capability and interest in supporting this effort utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. � 2808a, Facility Construction or Repair: Transactions Other Than Contracts and Grants. This authority is distinct from the Department of Defense prototype OT authorities commonly associated with 10 U.S.C. � 4021 and 4022. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. The anticipated delivery method is Construction Manager at Risk (CMAR). Phase 1: Pre-Construction Services - The OT Awardee shall assist the Government collaboratively in achieving its goals with respect to the project�s scope, constructability, budget, quality, schedule, and in coordination with the Designer of Record (DOR). Phase 2: Construction - Upon reaching an agreed-upon level of design (e.g., 95 to 100%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the construct the facility via alternative methods. SUBMISSION INSTRUCTIONS: Please follow the link: https://forms.osi.apps.mil/r/0cGuS5MpFU to MS Forms and submit the questionnaire. The questionnaire will close for responses on 28 August 2026 at 12:00PM Alaska Time. Any questions regarding the requirement or issues with MS Forms please reach out to Jason Linn at jason.linn@usace.army.mil and Michelle Nelsen at michelle.nelsen@usace.army.mil
Who won similar work
26 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Army Corps of Engineers), same product/service code (PSC) Y1AZ.
Single-winner award sizes (26): middle half $177K to $20.2M, median $2.3M; range $111K to $900.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| COLT BUILDERS INC | 4 | $945K | Sep 29, 2026 |
| EVERGREEN CONTRACTORS LLC | 3 | $561K | Sep 18, 2026 |
| QA ENGINEERING LLC | 2 | $341K | Jul 24, 2026 |
| RYMARC CONSTRUCTION INC | 2 | $334K | Sep 18, 2026 |
| PERINI MANAGEMENT SERVICES, INC. · $TPC · $3.9B | 1 | $900.0M | Mar 25, 2026 |
| WALSH FEDERAL LLC | 1 | $80.9M | Sep 15, 2026 |
| TUNISTA-ABSHER JOINT VENTURE LLC | 1 | $53.8M | Sep 28, 2026 |
| UNIT COMPANY · $UNTC | 1 | $47.0M | Dec 31, 2025 |
| SGS LLC | 1 | $25.8M | May 15, 2025 |
| NISOU ENTERPRISES INC | 1 | $21.4M | Mar 7, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- $TPC reported $3.9B revenue in FY2025. The median single-winner award in these 26 past awards, $2.3M, is under 0.1% of that. 10-K
One award's total value against one year of revenue; many awards are paid over several years.
- Sep 29, 2026COLT BUILDERS INC$313KW912PP26PA041No listed company matched (Materiality N/A)
- Sep 28, 2026TUNISTA-ABSHER JOINT VENTURE LLC$53.8MJoint Base Lewis McChord Multi Domain Task Force Buildings 3219 and 3218No listed company matched (Materiality N/A)
- Sep 21, 2026COLT BUILDERS INC$154KW912PP26PA037 BLDG 753 8(a) Sole Source Award NoticeNo listed company matched (Materiality N/A)
- Sep 18, 2026RYMARC CONSTRUCTION INC$161KBuilding 66017 Repair Restrooms at KAFBNo listed company matched (Materiality N/A)
- Sep 18, 2026EVERGREEN CONTRACTORS LLC$221KFY26 Building 405 Repair Rooms 36 and 37, Kirtland Air Force Base, NMNo listed company matched (Materiality N/A)
- Sep 18, 2026RYMARC CONSTRUCTION INC$173KKirtland AFB Building 428 and 429 Repair RestroomsNo listed company matched (Materiality N/A)
- Sep 18, 2026EVERGREEN CONTRACTORS LLC$189KBuilding 37000 Plant 1 Repair RestroomsNo listed company matched (Materiality N/A)
- Sep 15, 2026WALSH FEDERAL LLC$80.9MConstruction for Secure Operations FacilityNo listed company matched (Materiality N/A)
- Sep 14, 2026COLT BUILDERS INC$332KRenovate NW Collaboration Bldg. 570 KAFBNo listed company matched (Materiality N/A)
- Sep 10, 2026EVERGREEN CONTRACTORS LLC$152KAFRL Building 570/577 Security Upgrades, Kirtland Air Force Base (KAFB), Bernalillo County, New MexicoNo listed company matched (Materiality N/A)
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 2 of the past winners are listed companies
- 0 insider buys and 3 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.