Building 66017 Repair Restrooms at KAFB
Army Corps of Engineers · W075 ENDIST ALBUQUERQUE
No listed company matched (Materiality N/A)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation W912PP26QA026 in this department, oldest first.
- Sep 18, 2026 · this noticeAward NoticeRYMARC CONSTRUCTION INC · $161K
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Note the winner and the end of the period of performance for the recompete.
- Follow the agency to see the next notice for this work.
What the notice says
This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 66017 Repair Restrooms. Demolition Contractor must remove and dispose of existing ceiling grid, ceiling tiles, gyp ceilings, light fixtures, and mechanical diffusers and grills within scope of work boundary. (Approx. 150 Sq. Ft.) Contractor must remove and dispose of existing restroom plumbing fixtures within SOW boundary. Contractor must remove and d… (show all)
ispose of existing restroom walls within SOW boundary. Contractor must remove and dispose of existing exterior door and frame. Prep opening for wall infill. Contractor must remove and dispose of existing exterior metal steps. Contractor must remove and dispose of existing interior vestibule door and frame. Contractor must remove and dispose of existing flooring and resilient wall base in existing restrooms and vestibule. All receptacles located within demolished walls must be removed and conduit and wiring must be removed back to nearest J-box. Contractor must remove and set aside existing drinking fountain for reuse in new work. All utility lines not reutilized in new work must be capped under floor or in nearest wall not being removed. Contractor must remove and dispose of existing fire alarm pull station � wiring back to nearest J-box. Contractor must remove existing fire extinguisher and bracket and set aside for reuse in new work. Construction Contractor must construct new ceiling with metal studs and moisture resistant gypsum wall board in each restroom. Ceiling to be taped, textured, and painted (P-1). Contractor must provide and install new exhaust fan (EF-1) in each restroom as indicated on drawings. Contractor must configure existing exhaust system to new fan locations. Exhaust fans must be connected to restroom light switch. Contractor must provide and install new LED light fixtures (LF-1) utilizing existing circuitry. Contractor must provide and install light switches with stainless steel cover plates for each restroom. Contractor must provide and install mechanical diffusers as indicated on plans, connect back to existing HVAC system. Contractor must provide and construct new restroom partition walls as indicated on plans � wall construction to be moisture resistant gypsum wall board on metal studs. Studs to be metal 3-5/8� or 6� if required to facilitate plumbing. Contractor must tape, texture, and paint walls (P-2). Contractor must provide and install Fiberglass Reinforced Paneling wall covering up to 60� AFF around interior of restroom walls. Contractor must provide and install new water closets (WC-1, WC-2) in each restroom, each water closet must be tied into existing utilities (supply water, sanitary drain) as required for proper functioning. Contractor must provide and wall mounted lavatories (LV-1) and faucet (FC-1) in each restroom, each lavatory must be tied into existing utilities (supply hot and cold water, sanitary drain) as required for proper functioning. Contractor must provide and install grab bars as indicated on drawings. Installation must meet requirements of ANSI 117.1 and the Americans with Disabilities Act (ADA), current version. Contractor must provide and install shower surround, shower curtain rod, shower head with detachable wand. Shower pan and head must be connected to existing utilities (hot and cold supply water, sanitary drain) as required for proper functioning. Shower must meet requirements of ASNI 117.1 & ADA. Contractor must provide and install mirrors (M-1) at each lavatory. Contractor must install government provided restroom accessories, including toilet paper dispensers, soap dispensers, paper towel dispensers, and sanitary napkin waste cans. Contractor must provide and install new wood doors, hardware, and frames where indicated on drawings. Doors hardware must include privacy lock with occupancy indicator. Contractor must provide and install exterior infill wall at location of previous door. Wall must be weatherproof, insulated and finished flush to match on both interior and exterior faces. Contractor must provide and install opaque privacy film at existing window. Contractor must install drinking fountain with bottle filler set aside during demolition at location indicated on drawing. Drinking fountain must be tied into existing utilities (supply water, sanitary drain) as required for proper functioning. Relocate existing light switch as required. Contractor must reinstall existing fire extinguisher and bracket. Contractor must provide and install coat hooks in each restroom. Contractor must provide and install signage on restrooms complying with KAFB and ADA standards. Contractor must provide and install floor drain (FD-1). Contractor must install government furnished vinyl flooring (FL-1) and resilient wall base (WB-1) in SOW area.
Who won similar work
11 award notices on SAM.gov in the last 24 months. Matched by: Same office (W075 ENDIST ALBUQUERQUE), same product/service code (PSC) Y1AZ and NAICS 236220.
Single-winner award sizes (11): middle half $163K to $271K, median $212K; range $145K to $25.8M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| COLT BUILDERS INC | 4 | $945K | Sep 29, 2026 |
| EVERGREEN CONTRACTORS LLC | 3 | $561K | Sep 18, 2026 |
| SGS LLC | 1 | $25.8M | May 15, 2025 |
| QA ENGINEERING LLC | 1 | $229K | Jul 24, 2026 |
| L & R COMM & CONSTRUCTION INC | 1 | $212K | Jun 9, 2025 |
| RYMARC CONSTRUCTION INC | 1 | $173K | Sep 18, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Sep 29, 2026COLT BUILDERS INC$313KW912PP26PA041No listed company matched (Materiality N/A)
- Sep 21, 2026COLT BUILDERS INC$154KW912PP26PA037 BLDG 753 8(a) Sole Source Award NoticeNo listed company matched (Materiality N/A)
- Sep 18, 2026EVERGREEN CONTRACTORS LLC$189KBuilding 37000 Plant 1 Repair RestroomsNo listed company matched (Materiality N/A)
- Sep 18, 2026RYMARC CONSTRUCTION INC$173KKirtland AFB Building 428 and 429 Repair RestroomsNo listed company matched (Materiality N/A)
- Sep 18, 2026EVERGREEN CONTRACTORS LLC$221KFY26 Building 405 Repair Rooms 36 and 37, Kirtland Air Force Base, NMNo listed company matched (Materiality N/A)
- Sep 14, 2026COLT BUILDERS INC$332KRenovate NW Collaboration Bldg. 570 KAFBNo listed company matched (Materiality N/A)
- Sep 10, 2026COLT BUILDERS INC$145KBuilding 463 Breakroom Renovation at Kirtland AFBNo listed company matched (Materiality N/A)
- Sep 10, 2026EVERGREEN CONTRACTORS LLC$152KAFRL Building 570/577 Security Upgrades, Kirtland Air Force Base (KAFB), Bernalillo County, New MexicoNo listed company matched (Materiality N/A)
- Jul 24, 2026QA ENGINEERING LLC$229KKirtland AFB B497 Repair Suites; B277, B419 Power and CommunicationNo listed company matched (Materiality N/A)
- Jun 9, 2025L & R COMM & CONSTRUCTION INC$212KBuilding 419 Repair Restrooms & BreakroomNo listed company matched (Materiality N/A)
Competitive landscape
For the 6 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.