Award NoticePosted Jun 9, 2025

Building 419 Repair Restrooms & Breakroom

Army Corps of Engineers · W075 ENDIST ALBUQUERQUE

Stage
Awarded
NAICS
236220
Value
$212K
Solicitation
W912PP25Q0017
Set-aside
8(a) Sole Source (FAR 19.8)
PSC
Y1AZ
Place
Kirtland AFB, NM, USA
Contact
GLENDA KOHLIEBER (Glenda.D.Kohlieber@usace.army.mil)

No listed company matched (Materiality N/A)

Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation W912PP25Q0017 in this department, oldest first.

Early notice
None posted
Solicitation
None posted
Award
  • Jun 9, 2025 · this notice
    Award Notice
    L & R COMM & CONSTRUCTION INC · $212K

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Note the winner and the end of the period of performance for the recompete.
  • Follow the agency to see the next notice for this work.

What the notice says

This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 419 Repair Restrooms and Breakroom- Demolition Contractor shall demo existing flooring and sawcut existing slab as indicated on the not for construction drawings. Contractor shall remove existing doors, frames, and hardware as indicated on the not for construction drawings. Contractor shall remove existing walls, electrical and comm. as indicated on t… (show all)

he not for construction drawings. Contractor shall remove existing ceiling tiles, grid, light fixtures and HVAC register as indicated on the not for construction drawings. Contractor shall remove existing countertop and bracing in the existing space. Contractor shall not address the drain and water connection located on the Northwestern location of the space. Existing fire strobe to be left in place on the Eastern wall. Contractor to protect the sprinkler heads and heat detectors in the space during the demolition process. Contractor shall reinstall the detectors in the new suspended ceiling. Construction Contractor must provide & install new wastewater drain line and connect to existing sanitary sewer line located on the South exterior of the facility. Contractor will be required to verify the location of the exterior gas line, that may be in line with sanitary sewer line location. Contractor must provide & install new concrete infill at Sawcut. Contractor must provide & install new metal stud walls (3-5/8�) with sound batt insulation and 5/8� gyp. board. on both sides, tape, texture and paint. Contractor must provide & install new breakroom casework � upper & lower cabinets & hardware. Contractor must provide & install new solid surface countertops & backsplash. Contractor must provide & install new breakroom sink & faucet. Contractor must provide & install new water line and electrical for Government furnished refrigerator. Contractor must provide & install new bar height solid surface counter & bracing at south & west perimeter wall as shown on the not for construction drawings. Height to be finalized during construction. Include holes & gromets in counter near existing wall power outlets. Contractor must provide & install new restroom doors, frames, privacy hardware and restroom door signage. Contractor must provide & install new tile flooring & rubber wall base. Contractor must provide & install new tile backsplash. Contractor must provide & install new restroom plumbing fixtures to include toilet and urinal and backing in the wall. Contractor must provide & install new restroom mirrors and grab bars and backing in the wall. Contractor must install gov�t provided restroom accessories: tissue dispensers, soap dispensers, and towel dispensers and backing in the wall. Contractor shall install a bottle filler water fountain with backing in the wall to include electrical and water. Contractor must provide & install new hard lid gyp. Board ceiling in the restrooms. Contractor must provide & install new acoustic ceiling tile & grid as shown on the not for construction drawings. Contractor must provide & install new lay-in light fixtures, & wiring. Connect to existing switch Contractor must provide & install new surface mount light fixtures, wiring & switch with stainless steel cover plate. Contractor must provide & install new restroom vent fans. Contractor will need to core drill the roof as well as coordinate with the roof warranty contractor prior to the penetration. Contractor must provide and install new receptacles with stainless steel cover plates in the restroom as shown on the not for construction drawings. Contractor must provide & install new horn & strobe devices in restrooms. Contractor must provide & install new HVAC supply & return register. Connect to existing HVAC and perform balancing of the existing system. Contractor must provide & install new undercounter hot water heater. Refer to the not for construction drawings. Contractor will need to place the comm wires on the south side of the room in wire mold.

Who won similar work

11 award notices on SAM.gov in the last 24 months. Matched by: Same office (W075 ENDIST ALBUQUERQUE), same product/service code (PSC) Y1AZ and NAICS 236220.

Single-winner award sizes (11): middle half $158K to $271K, median $189K; range $145K to $25.8M.

WinnerAwardsValueLast
COLT BUILDERS INC4$945KSep 29, 2026
EVERGREEN CONTRACTORS LLC3$561KSep 18, 2026
RYMARC CONSTRUCTION INC2$334KSep 18, 2026
SGS LLC1$25.8MMay 15, 2025
QA ENGINEERING LLC1$229KJul 24, 2026

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.

Latest awards

Competitive landscape

For the 5 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
  • 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 32 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.