Z2DA--589A5-23-199, AJP FCA - Replace existing roofing, window, Security Cameras
Veterans Affairs · 255-NETWORK CONTRACT OFFICE 15 (36C255)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C25526R0091 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
How many buildings are included for roof replacement? Solicitation is for the replacement of the roofs on buildings 2 and 6 per contract document drawings. In addition, lightning protection will be provided on buildings 2 and 6 per contract document drawings. Please confirm the building numbers and total roof square footage for each. Buildings 2 and Building 6, see plans for total roof square footage What is the total number of windows to be replaced? There are no windows. Are there different window types and sizes? If so, please provide a window schedule. There are no windows in this project.… (show all)
What is the total number of security cameras to be installed or replaced? There are no security cameras in this project. Please provide locations and any available specifications or layouts. There are no security cameras in this project. Kindly provide any detailed plans, schedules, or drawings related to the roofing, window replacement, and security camera systems. All plans applicable have been provided. Is this project tax exempt? Yes Sheets 2-AD201 and 6-AD201 Note 14 references an existing Equipment screen to be saved for Reinstallation. I did not locate this note on the plan or see it at the site visit. Can you identify the location or confirm it is not a requirement? This is not a requirement for this project. Sheet 2 AD201 Note 5 references demolition of the cooling tower. Please clarify the following as it relates to the cooling tower. The cooling tower appeared to be drained. Can we assume the VA will have the tower shutdown and drained. Cooling tower is non-functional. To what point will piping, electrical, controls, ect be demolished back to? Cap piping above the roof and remove electrical to disconnect. Will there be any requirement for roof patching at pipe penetrations? Roof patching should follow infill details on sheet S-301. Is there a requirement to remove the cooling tower from the BAS? No Sheet 2-SS101 coded note 2, remove existing cooling tower steel frame down to top of concrete slab prior to reroofing. Is this an abandoned cooling tower or do we need to have a mechanical and electrical contractor shut it down, cap it and drain it before demo? Cooling tower is abandoned. Section 2.4.2 in 07 54 23 states for the color to be as selected by Architect from manufacturer s full range. Can this be changed to manufacturer s standard color selection? Yes, standard color selection is acceptable. Section 1.3 of spec 01 00 00 denotes there are 3 CLINs but the Statement of Proposal Items in the solicitation denotes only 1 CLIN. Please advise how many CLINs there are. See updated bid sheet. A. ITEM I, GENERAL CONSTRUCTION: BASE BID: Work includes general construction, alterations, roads, walks, grading, drainage, necessary removal of existing structures and construction of BUILDING 2 & 6 ROOF & LIGHTNING PROTECTION. B. ITEM 2: Work includes all work in base bid less LIGHTNING PROTECTION C. ITEM 3: Work includes all work in base bid less LIGHTNING PROTECTION and BUILDING 2 ROOF On 2/S-301, can the hole be backfilled with polyisocyanurate insulation in lieu of concrete? Yes, that is acceptable. Please confirm that asbestos abatement, glazing/window replacement, and security cameras are not included in the scope of the project. These are not included in the scope of this project. Have cores of the roofs been taken? If so, can the results be provided? All roofing information has been provided. Can the TPO be glued in lieu of mechanically fastened? Glued would provide a quieter installation. Refer to TPO installation specifications. From the site walk there is a mixture of 24 ga. sheet metal and stainless-steel flashing on the roofs. Please advise if the 24 ga. sheet metal or stainless-steel flashings are to be used. Refer to flashing specifications The drawings provided with the solicitation are not to scale. Please provide drawings with the correct scale. Bid plans have been provided. Contractors were allowed to verify dimensions at the pre-bid walk. Please confirm the full scope included in this solicitation for Buildings 2 and 6, specifically whether the roofing, windows/glazing, lightning protection, and security camera / low-voltage work are all part of the same award package. Solicitation is for the replacement of the roofs on buildings 2 and 6 per contract document drawings. In addition, lightning protection will be provided on buildings 2 and 6 per contract document drawings. Please confirm whether the security camera scope includes only device replacement, or also associated cabling, head-end work, programming, commissioning, and integration. There are no security cameras in this project. Please confirm whether the lightning protection scope is fully included in this solicitation and whether it is intended to be performed as a dedicated trade package or incidental to the roofing / electrical work. Solicitation is for the replacement of the roofs on buildings 2 and 6 per contract document drawings. In addition, lightning protection will be provided on buildings 2 and 6 per contract document drawings. Please confirm the expected phasing and access limitations for work on Buildings 2 and 6, including whether both buildings may be worked concurrently. There are no expected phasing or access limitations, both buildings may be worked concurrently. Please confirm whether there are any required shutdown coordination windows, after-hours work requirements, infection control restrictions, or occupied-facility limitations that should be priced into the work. Any contractor required utility outages will be after-hours. Please confirm whether all plans and specifications currently posted constitute the full and final bid package, or whether any amendments are anticipated following the site visit. All plans and specifications are posted. Please confirm whether proposals must be physically delivered as a single package to the address in the SF 1442, with one original and one electronic copy on CD, or whether any alternate delivery method is acceptable. Please contact CO directly for delivery questions. Please confirm whether there are any bonding, insurance, or subcontracting-plan requirements beyond those already stated in the solicitation that should be addressed in the proposal. Yes. All proposal submittal instructions are in the solicitation. During the pre-bid it was noted that there are specifications from other phases, not related to this project, within the contract documents. Contractors were told to verbally bid the plans, but per FAR 52.236-21, Specifications and Drawings for Construction states: Precedence: "In case of difference between drawings and specifications, the specifications shall govern". Due to this regulation the VA will need to identify which spec sections shall apply, and which spec sections shall not apply to enable the contractor to provide a proposal in compliance with the contract documents.� Will the VA be providing project specific specifications? All plans and specifications are posted. This project requires past performance projects to have been completed within the past four (4) years. Given the VA s emphasis on increasing competition and encouraging participation from qualified SDVOSB contractors, would the Government consider accepting past performance projects completed within the last five (5) years, provided the projects are of similar scope, size, and complexity to this requirement? Provide the requested information as best you can. I see that the cover sheet on the plans talks about Buildings 1, 2, 3, 5 & 6, but the specs and plans that are given only have Buildings 2 & 6 information. Am I following along correctly? Will this only be Roof replacement for Buildings 2 & 6 as of right now? Solicitation is for the replacement of the roofs on buildings 2 and 6 per contract document drawings. In addition, lightning protection will be provided on buildings 2 and 6 per contract document drawings. All existing operating mechan
Who won similar work
26 award notices on SAM.gov in the last 24 months. Matched by: Same office (255-NETWORK CONTRACT OFFICE 15 (36C255)), same product/service code (PSC) Z2DA and NAICS 236220.
Single-winner award sizes (26): middle half $655K to $5.5M, median $1.5M; range $31K to $22.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| GUARANTEE INTERIORS, INC. | 7 | $20.1M | Oct 6, 2026 |
| ONSITE CONSTRUCTION GROUP LLC | 5 | $30.5M | Sep 11, 2026 |
| FLOYD CONSTRUCTION CORP | 4 | $2.6M | Sep 16, 2026 |
| SMITH HAFELI INC | 2 | $27.5M | Sep 18, 2026 |
| FOX-ESA JV LLC | 1 | $18.6M | Sep 18, 2025 |
| ADBC-FSC Joint Venture LLC | 1 | $6.7M | Sep 15, 2026 |
| UTILITY MAINTENANCE CONTRACTORS LLC | 1 | $5.9M | Jun 30, 2026 |
| SIGO VALIANT JV LLC | 1 | $3.7M | Dec 10, 2024 |
| DOMINGUEZ & PERSONS, LLC | 1 | $3.4M | Jul 23, 2026 |
| 4GKB, LLC | 1 | $552K | Apr 22, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Oct 6, 2026GUARANTEE INTERIORS, INC.$4.1MZ2DA--589A4-25-102, Install Dedicated Pharmacy Air HandlerNo listed company matched (Materiality N/A)
- Sep 18, 2026SMITH HAFELI INC$22.0MZ2DA--657A5-21-401, Construct New Campus Chiller Plant| MC| NRM FY26No listed company matched (Materiality N/A)
- Sep 16, 2026FLOYD CONSTRUCTION CORP$1.2MZ2DA--589A7-25-503 Prepare Site for Cath Lab Equipment FY26 NRMNo listed company matched (Materiality N/A)
- Sep 15, 2026ADBC-FSC Joint Venture LLC$6.7MZ2DA--589-21-211, Renovate Building 26 for Pharmacy, Phlebotomy, and Police DepartmentNo listed company matched (Materiality N/A)
- Sep 11, 2026ONSITE CONSTRUCTION GROUP LLC$5.4MZ2DA--589-22-465 FCA Correct Grounds DeficienciesNo listed company matched (Materiality N/A)
- Sep 11, 2026GUARANTEE INTERIORS, INC.$1.5M657-23-104JC- Prepare Site for New Computed Tomography, Unit Room A259No listed company matched (Materiality N/A)
- Jul 23, 2026DOMINGUEZ & PERSONS, LLC$3.4M657-26-105, Upgrade Interior Physical SecurityNo listed company matched (Materiality N/A)
- Jul 9, 2026GUARANTEE INTERIORS, INC.$874KZ2DA-- 657-22-112JC, Phase1: Prepare Site For New Cath Labs, Rooms B510 and B516No listed company matched (Materiality N/A)
- Jun 30, 2026UTILITY MAINTENANCE CONTRACTORS LLC$5.9MZ2DA--589A5-23-188, AJP FCA REPAIR ROADS, PARKING, AND SIDEWALKSNo listed company matched (Materiality N/A)
- Mar 3, 2026ONSITE CONSTRUCTION GROUP LLC$1.4MZ2DA--589A4-24-103, Construct Women's ClinicNo listed company matched (Materiality N/A)
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.