Y1AZ--Renovate SPD Phase IV Project 526-25-100
Veterans Affairs · 242-NETWORK CONTRACT OFFICE 02 (36C242)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C24226B0013 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
Page 4 of 4 THIS IS A PRE-SOLICITATION NOTICE ONLY Project No. 526-25-100; Renovate SPD Phase IV at the James J. Peters VA Medical Center, Bronx, New York. CONSTRUCTION SERVICES GENERAL SCOPE/Statement of Work. This is a construction contract for the James J. Peters Veterans Affairs Medical Center, 130 West Kingsbridge Road, Bronx, New York 10468 to furnish all supervision, labor, equipment, and material necessary to renovate our Sterile Processing Department� logistic area and its surrounding spaces in building 100 of the James J. Peters VA Medical Center. All work shall be completed in accor… (show all)
dance with all published applicable local/state/federal/national codes, ordinances, and regulations, along with all related VA directives, design guides and manuals, specifications, and standards plus all VA requirements (federal or local) that are project specific to the documented scope of work on this site. Contractors are required to visit the site and meet with the Contracting Officer s Representative (COR) prior to bidding. The goal is to enhance patient care by improving workflow efficiency, sterilization processes, and infection control within the SPD Department. The work will also include design and system upgrades to support mechanical and HVAC requirements in alignment with current VA standards. All work shall be executed in accordance with the architectural drawings, design narratives, and specifications prepared by the architectural firm. All trade work must be done by a certified master plumber, master electrician, etc. and work must be completed in 8-hour increments to ensure fire safety standards. FDNY fire safety protocols must be followed. Work is not considered complete unless a sanitation ticket is provided for the construction debris. No wiring, pipes, equipment or construction debris is to be left abandoned. Contractor will be responsible to remove any wiring, pipes, and equipment causing an obstruction to the area and/or project. Scope of Work: SPD Logistics Consolidation and Workflow Improvements Develop a consolidated layout of the SPD Logistics area and adjacent spaces in accordance with AE firm 100% stamped drawings. Create mechanical modifications to improve processing flow of sterile medical instruments as per design guide/TIL. Enhance environmental controls to maintain a sterile environment and high-level infection control. Mechanical and Architectural Renovations Redesign room configurations as needed to accommodate new equipment and functions. Follow the AE drawings and specs for guidance. Perform wall demolition, install new doors, windows, louvers, and equipment support pads as required. Bulk Supply, clean supply, bulk receiving, OR Clean storage, clean equipment and Anteroom Spaces will receive new Stonhard flooring. Contractor will prep the floor, grind/sand it down, level and repair the floor as needed to receive the new flooring. Walls for the same spaces will receive diamond stainless steel plates to protect the walls from damage. Install ventilation systems, grated walkway installation, and restoration painting of all affected walls, ceilings, and floors. Provide electrical upgrades necessary to support new mechanical and medical equipment as per drawings. HVAC System Adjustments and Upgrades Modify the existing HVAC system serving the SPD to support the new room layout and equipment. Provide new exhaust ventilation per equipment manufacturer specifications and the VA HVAC Design Manual and TIL. Provide two new air handling units York brand custom made. These units should be mounted in the interstitial as high in the beam pocket as possible using new steel supports and hanger rods as required per manufacture installation recommendations. Ensure proper room pressurization to meet VA infection control requirements. Install room temperature controls, humidification systems, and alarm integration in accordance with VA HVAC Design Manual standards. All control shall to be done by ITC to ensure full compatibility Electrical All equipment shall be provided with a disconnect switch as per NEC requirements, and the disconnect shall be installed in an accessible location. 7 cameras in total should be installed as directed by the VA COR. Provide a new Network Video Recorder (NVR) in the Security Equipment Room of the existing facility. The new NVR shall be connected to the existing security system network. NVR shall have 90-day recording capacity. The SSTV shall be monitored/controlled by the centralized SCC in Building 16. Ensure the NVR is connected to the main security control center. All wiring should be in conduits as per NEC and VA design guides. SSTV shall be able to be fully integrated with the PACS. Cameras should be Avigilon; SSTV system should be Avigilon control center 7 software to be compatible with our system. PACS should be HID. Equipment provided as part of this project will be compatible with the VA Security Project.� The VA Security Project will utilize C-Cure 9000 for the PACS software which will require iSTAR Access Controllers. The Contractor shall furnish, install, configure, test, and commission a complete Avigilon video surveillance system for Building 100. The system shall be comprised of Avigilon-manufactured components and fully compliant with: VA Master Specifications Division 28 23 00 Video Surveillance VA IT Design Manual (latest edition) ANSI/TIA-568-D (Structured Cabling Standards) ANSI/TIA-606-B (Administration and Labeling Standards) NFPA 70 (NEC) and applicable NFPA codes System Requirements The CCTV system shall include, but not be limited to, the following components and services: Head-End Equipment Avigilon HD NVR4 Premium network video recorder, configured with RAID storage and redundant power. Dedicated Rack. Storage sized to provide a minimum of 30 days continuous recording at full resolution for all installed cameras. Uninterruptible Power Supply (UPS) sized to support all CCTV head-end components for a minimum of 30 minutes under full load. Network switches, PoE media converters, patch panels, and all related accessories should be installed in the nearest telecom room. Cabling Infrastructure CAT6A copper cabling for all camera drops, tested and certified per TIA-568-D. Fiber optic cabling (singlemode or multimode as required) with LC terminations, tested per TIA-568.3-D. Complete labeling and administration per TIA-606-B and VA standards. Cameras & Software Avigilon IP cameras as shown on contract drawings, including lenses, mounts, housings, and environmental enclosures. Avigilon Control Center (ACC) software licensing, configured for VA Police user access and system administration. Location of Head-End The CCTV head-end, including NVR, UPS, switches, and all related components, shall be installed in the Police Station, Building 100, First Floor, in a dedicated secure, rack-mounted configuration. Submittals & Approvals The Contractor shall prepare and submit shop drawings for approval by the VA prior to procurement or installation. Shop drawings shall include: Camera locations and schedules Cable routing and riser diagrams One-line diagrams and rack elevations Storage calculations and system architecture Written VA approval is required before work may proceed. Testing, Commissioning & Training The Contractor shall test and certify all cabling. Perform full functional testing of all cameras, recording, playback, failover, and UPS backup. Provide final as-built drawings and test documentation. Conduct training for VA Police personnel on system operation, user administration, and maintenance. Deliverable The Contractor shall provide a fully operational, VA-approved Avigilon CCTV system meeting all performance, reliability, and compliance requirements, and shall deliver all required documentation and training prior to project closeout. Phasing and Continuity of Operations Develop and provide a phasing plan for construction activities, if necessary. The plan must minimize disruption to ongoin
Who won similar work
38 award notices on SAM.gov in the last 24 months. Match: Same office, same NAICS 236220.
| Winner | Awards | Value | Last |
|---|---|---|---|
| J & J MECHANICAL AND CONSTRUCTION GROUP LLC | 4 | $16.1M | Sep 22, 2026 |
| TACTICAL CONSTRUCTION, INC | 4 | $10.3M | May 21, 2026 |
| SERVIAM CONSTRUCTION LLC | 3 | $18.2M | Mar 18, 2026 |
| IRON SWORD ENTERPRISES, LLC | 3 | $8.2M | Mar 30, 2026 |
| F & C GROUP JV LLC | 3 | $7.6M | May 20, 2026 |
| Frontline Group LLC · $FRO | 2 | $2.2M | Jun 16, 2026 |
| JETEX MECHANICAL, LLC | 2 | $999K | Mar 11, 2026 |
| NORTHERN DREAMS CONSTRUCTION, INC | 2 | $299K | Feb 24, 2026 |
| Amerifield JV LLC | 1 | $45.6M | Aug 28, 2025 |
| CDEEM CO ORLANDO 32825 FLK | 1 | $22.9M | May 1, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Sep 30, 2026HANICHI ENTERPRISE INC.$150KY1DZ--STATION - CONST - 630A4-26-415 UPGRADE HEALING GARDEN - FY26 STATION
- Sep 23, 2026VETERANS HOPE ASSOCIATES INC$890KZ1DA--NRM - CONST - 630A4-26-411 CORRECT DEFICIENCY OF 14 WEST AND 15 WEST - FY27 NRM
- Sep 22, 2026J & J MECHANICAL AND CONSTRUCTION GROUP LLC$550KY1DA--NRM-CONST 630-26-101 CONSTRUCTION ONCOLOGY PHARMACY CHILLER USP 800
- Jun 30, 2026WAINSCHAF ASSOCIATES, INC.$13.3MZ1DA--NRM CONSTRUCTION -528A8-18-801 Renovate for Cardiac Cath & IR
- Jun 16, 2026Frontline Group LLC$1.5MY1DA--NRM-CONST 630A4-26-409 Replacement AC Package Units
- May 21, 2026TACTICAL CONSTRUCTION, INC$397KY1AB--PROJECT # 528A4-26-202 Clinics Renovation Batavia VAMC
- May 21, 2026J & J MECHANICAL AND CONSTRUCTION GROUP LLC$14.7MY1AZ--Renovate 6B for Outpatient Mental Health Project 526-19-122
- May 20, 2026F & C GROUP JV LLC$1.9MY1DA--NRM-CONST 630A4-22-413 Upgrade Station Chilled Water for P&ID
- May 19, 2026BINARY EXCHANGE TECHNOLOGIES LLC$412K561A4-22-104 Upgrade HVAC & Bathroom B-12
- May 18, 2026TACTICAL CONSTRUCTION, INC$6.7MY1DA--528A6-19-604 Renovate B76 6th floor
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 1 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.