SolicitationPosted Jan 22, 2026·Responses due Feb 5, 2026

Y1AZ--Renovate SPD Phase IV Project 526-25-100

Veterans Affairs · 242-NETWORK CONTRACT OFFICE 02 (36C242)

Stage
Open solicitation
NAICS
236220
Value
Not stated
Solicitation
36C24226B0013
Set-aside
None stated
PSC
Y1AZ
Place
Not stated
Contact
Akkil A Kurian (Akkil.Kurian@va.gov)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 36C24226B0013 in this department, oldest first.

Early notice
  • Nov 19, 2025
    Pre-solicitation
    Open
Solicitation
  • Dec 29, 2025
    Solicitation
    Open
  • Dec 30, 2025
    Solicitation
    Open
  • Dec 30, 2025
    Solicitation
    Open
  • Dec 30, 2025
    Solicitation
    Open
  • Jan 22, 2026 · this notice
    Solicitation
Award
  • May 21, 2026
    Award Notice
    F & C GROUP JV LLC · $3.5M
    Open

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

Page 2 of 2 AMENDMENT 0002 TO IFB 36C24226B0013 PROJECT NUMBER 526-25-100 RENOVATE SPD PHASE 4 See below RFI s submitted for this solicitation and VA/AE official responses in red, as well as information on Stonhard flooring that will be required for this project. Question: Spec section 09 06 00 lists SECTION 08 51 23, STEEL WINDOW but this spec section is missing from the spec book. VA/AE Response: Steel windows are not in this project and the reference listed in specification section 09 06 00 to 08 51 23 can be removed. Question: Spec section 09 06 00 lists SECTION 08 56 19, PASS WINDOWS but … (show all)

this spec section is missing from the spec book. VA/AE Response: Pass Through Windows are in this project however there is no written specification, instead a basis of design for a powered pass through window is listed on the Return Hatch Detail on drawing AS1.04. Question: Spec section 09 65 16 and legend on room nish schedule drawing AE6.02 indicates WSF/ welded seam sheet ooring but none of the rooms in room nish schedule shows WSF, please specify which room numbers receive WSF. VA/AE Response: Welded Seam Sheet Flooring (WSF) is not in this project and can be removed from specification section 09 65 16 and the room finish schedule on drawing AE6.02. Question: Spec section 09 06 00 lists SECTION 10 13 00 / 10 14 00, INTERIOR SIGNS but this spec section is missing from the spec book. If there is any work of new signage then please provide a proper signage schedule. VA/AE Response: Signage shall be according to VA standards. All rooms shall receive a sign. Final room numbers and names shall be coordinated during shop drawings. Please refer to VA signage standards https://www.cfm.va.gov/til/dManual/dmSignage.pdf. The contractor will be responsible for complying to those standards when submitting signage shop drawings, any deviations will not be accepted, contractors must bid accordingly. Question: Spec section 09 06 00 lists DIVISION 12- FURNISHINGS & SECTION 12 31 00, METAL CASEWORK indicating work of Lockers, Cabinets and Counters. All this Div 12 is missing from the spec book. AE/VA Response: Metal Casework, including cabinets and counters, but not lockers are indicated on drawing AS1.04 with a basis of design. There are no lockers in this project. Question: Drawing PD0.01 demo sheet notes 1 and 2 states to remove existing sanitary piping below grade (unexcavated area) what is the depth of this existing sanitary piping which we assumed is buried in the soil and will probably need excavation. Also please con rm all the dotted line dark and regular is to be considered from removal. It s not clear, See below snap shot. VA/AE Response: The dark dashed line is removal up to the point of termination as shown in the drawings. Contractor must bid accordingly. Question: Drawing PD1.01 indicates only demolition work of existing medical gas piping. Please con rm there is no new work of medical gas piping or accessories. VA/AE Response: All new work is shown on the plans. Question: Demo drawings states to remove quarry oor le, other various oors and states existing oor shall be leveled. Please con rm if a self-leveling product like Ardex K-15 is required for oor leveling? and what should be the thickness? Please clarify as this is an expensive application and may be required before application of the new epoxy resin RES-3 ooring. VA Response: The depth of the quarry tile floor is estimated to be up to 2 . The leveling is intended to make the floor level with adjacent subflooring and make a smooth finish that meets the standard of the epoxy floor manufacturer. We will not comment on specific suitable products, however leveling compounds must be compatible with finish flooring manufacturer requirements. To confirm, complete floor preparation including a self-leveling compound is required by the contractor. Question: Solicitation page 14 of 85 Project Management paragraph states The Project Manager shall be the on-site representative of the Contractor and shall oversee all aspects of day-to-day project operations and shall serve as the Contractor s primary point of contact, including the ability to meet with the Contracting o cer. --- Please con rm if contractor s project manager is required full time on site or part time? VA Response: A full-time dedicated site superintendent is required to be on site when any work is being performed. The project manager is required to be onsite part-time, to ensure quality control of construction work, and to attend necessary meetings and weekly inspections. Question: Drawing AD1.01 indicates to remove the existing concrete slab, please specify the thickness of this slab and con rm this existing slab is on the grade. VA/AE Response: In the areas where concrete is indicated to be removed the slab is on grade. The slab is 5 thick, however it does haunch to 8 thick near foundation walls. All contractors must assume a concrete slab of 6-8 inches for bidding purposes. Question: Drawing AS1.02 shows wall type P6, but we are unable to nd this wall type on oor plan. VA/AE Response: Partition type P6 is not used. Question: All the new walls shown on drawing AS1.02 goes up to the deck. Please inform what is the oor to deck height of the ground oor. VA/AE Response: The floor to deck height of the ground floor is approximately 12 . Question: Drawing AS1.01 has number 1 in a circle see below snap shot of drawing, please clarify what does the number 1 denotes? VA/AE Response: The symbol in question denotes the required hour rating for rated walls. In the instance in the drawing snip included in the RFI would denote a 1 hour rated wall assembly. Question: There are drawings for the work of structural steel but no spec sections are provided for the metal deck and related steel work. There are no written specifications for structural steel. VA/AE Response: There are no written specifications for structural steel. The requirements for steel and metal deck are listed in the notes of drawing S1.01. Question: Drawing AS1.04 has description and basis of design for Monitor Arm . Is this monitor arm to be provided and installed by the contractor? VA/AE Response: The monitor arm and installation shall be by the contractor. Question: Drawing AS1.04 indicates WG/wall guards and CG/corner guards. Please provide details like size/dimensions, elevation and enlarged details for these WG and CG. VA/ AE Response: Thickness, size, and height for the wall and guards are listed in the wall and corner guard details on drawing AS1.04. Question: Drawing AS1.04 Security Camera note states contractor to furnish and install new Motorola Avigilon dome cameras in outside of the doors 29, 43 and 48. What about the interior security cameras marked as SC on the legend and shown on the plan? Are these to be provided by contractor as well? VA/AE Response: All cameras, including interior cameras shall be provided by the contractor. Question: Drawing AE6.02 room no. 034 is missing on the room nish schedule. VA/AE Response: Room 034 shall match all of the finishes of Room 035. Question: Please provide the Crossville ceramic tiles item number which is missing in spec sec 09 06 00. VA/AE Response: The tile basis of design is Crossville, Color Blox 2.0 porcelain, unpolished with cross sheen mosaic tiles. Provide matching trim tiles with bullnose finish at top of wainscotting and cove base at the bottom. Question: Mechanical drawings indicate Access doors and panels and concrete pad for the oor mounted expansion tank. None of these could be found on the oor plans, please identify access door/panel and concrete pad on the oor plan. VA/AE Response: Access doors shown on detail plans are for ductwork and are to be installed at all locations as specified in spec section 23-31 paragraph 2.3. Question: Mech drawing MH6.01 louver schedule states to install louver in the exterior wall above loading dock. Please specify what is the nish of the exterior wall? Are there metal panels? Does the jambs and

Who won similar work

38 award notices on SAM.gov in the last 24 months. Matched by: Same office (242-NETWORK CONTRACT OFFICE 02 (36C242)), same NAICS 236220.

Single-winner award sizes (38): middle half $313K to $2.5M, median $836K; range $39K to $45.6M.

WinnerAwardsValueLast
J & J MECHANICAL AND CONSTRUCTION GROUP LLC4$16.1MSep 22, 2026
TACTICAL CONSTRUCTION, INC4$10.3MMay 21, 2026
SERVIAM CONSTRUCTION LLC3$18.2MMar 18, 2026
IRON SWORD ENTERPRISES, LLC3$8.2MMar 30, 2026
F & C GROUP JV LLC3$7.6MMay 20, 2026
Frontline Group LLC · $FRO2$2.2MJun 16, 2026
JETEX MECHANICAL, LLC2$999KMar 11, 2026
NORTHERN DREAMS CONSTRUCTION, INC2$299KFeb 24, 2026
Amerifield JV LLC1$45.6MAug 28, 2025
CDEEM CO ORLANDO 32825 FLK1$22.9MMay 1, 2025

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.

Latest awards

Competitive landscape

For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
  • 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 25 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 1 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.