SolicitationPosted Sep 10, 2026·Responses due Jan 10, 2027

A Study on Vessel Design Challenge

Transportation (all) · 693JF7 DOT MARITIME ADMINISTRATION

Stage
Open solicitation
NAICS
541720
Value
Not stated
Solicitation
693JF726R000016
Set-aside
None stated
PSC
R405
Place
Not stated
Contact
Christian Onwudiegwu (christian.onwudiegwu@dot.gov)
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 693JF726R000016 in this department, oldest first.

Early notice
None posted
Solicitation
  • Sep 10, 2026 · this notice
    Solicitation
  • Sep 11, 2026
    Solicitation
    Open
  • Sep 14, 2026
    Solicitation
    Open
  • Sep 25, 2026
    Solicitation
    Open
  • Sep 25, 2026
    Solicitation
    Open
  • Oct 5, 2026
    Solicitation
    Open
  • Oct 16, 2026
    Solicitation
    Open
Award
Not yet. Typical award: Oct 5, 2026 to Nov 3, 2026, middle of the range Oct 10, 2026.
Measured from 15 past solicitations at Maritime Administration that later posted an award (middle half of cases, counted from Sep 10, 2026).
Responses are due Jan 10, 2027, so an award before then is unlikely; past cases include short solicitations.

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

U.S. Maritime Administration (MARAD) A Study on Vessel Design Challenge RFP No. 693JF726R000016 REQUEST FOR PROPOSALS (RFP): The Maritime Administration�s (MARAD) Maritime Environmental and Technical Assistance (META) program is issuing a request for proposals (RFP) for a Vessel Design Challenge (Challenge). This Challenge intends to fund multiple design teams willing to undertake integrated design work to improve fuel efficiency and reduce vessel underwater radiated noise (URN) to create the next generation of U.S. vessels. Individual awards depend on number of designs proposed for the packag… (show all)

e. Awards are intended to be for not less than $150k and likely not more than $450k. Project completion timeline is 12-18 months. Total funding available is up to $1.25 million. PROGRAM DESCRIPTION: The META program (46 U.S.C. � 50307) is investigating the interconnections between broader fuel efficiency, reducing URN from vessels, and exploring potential co-benefits. It is the policy of the United States to revitalize and rebuild domestic maritime industries and workforce to promote national security and economic prosperity. Accomplishing this requires making United States-flagged and built vessels commercially competitive in international commerce, rebuilding America�s maritime manufacturing capabilities, and expanding and strengthening the recruitment, training, and retention of the relevant workforce. The most promising opportunities for optimizing fuel efficiency gains and achieving URN reductions are in the early ship design stage, using a systems approach. This requires intentional and integrated ship designs that prioritize fuel efficiency while simultaneously reducing URN. Advanced fluid dynamic modeling enables comparison among hull, engine, and propeller design and arrangement, providing valuable information to the industry about the return on investment (ROI) for various technology and design optimizations at the design phase. Individual technologies claim to provide efficiency and noise reduction benefits, but the additive cost-savings have not been quantified for applying technologies in series and demonstrating increased efficiencies across multiple areas. Recently published studies summarized the state of knowledge and availability of technologies that can be applied to vessels to improve energy efficiency while reducing vessel generated URN. Those reports crosswalk not only the interoperability of technologies and design elements, but the potential reductions, costs, and return on investment. The next phase is to demonstrate, through modeling, the benefits that can be realized through a systematic design approach integrating technologies with input from naval architects, shipyards, and technology suppliers on the efficacy of these approaches. By using this approach, Teams will begin at the drawing table to quantify the benefits of innovative technology integration into the design phase for application on new vessels. The Vessel Design Challenge is intended to facilitate the demonstration of novel vessel designs that meet or exceed international benchmarks for fuel efficiency and URN source levels. This Challenge is intended to fund multiple Design Teams willing to undertake this kind of integrated design work to create the next generation of U.S. vessels. PROPOSAL CONTENT Proposed Vessel Design: Design proposals can include: Existing projects that would be redesigned, Forthcoming projects that are just beginning the design specification phase, and Designs that are theoretical or more experimental which aim to create a new approach or design. There are no restrictions on eligible vessels, however, given the mission of the Maritime Administration, vessels should be commercially useful and generally would not include small watercraft, recreational vessels, or fisheries vessels. Eligible designs include vessels operating in coastal or inland waterways as well as the Great Lakes. Ideal proposals will be for new design approaches or design modifications that couple hull-machinery-propulsion approaches to maximize fuel efficiency, URN reduction, and ROI. Technologies should be centered around performance and demonstrating the feasibility and economic achievability of these combined approaches and should be dictated by capacity needs set by industry requirements (tug capacity, crew capacity, operations support, range, TEU, cargo etc.). Designs should note specifically the technology readiness level and the commercial availability of any technologies used. Design Team: The approach to the Challenge will include a design team. Teams should include description of partnerships, collaborations, and/or processes that will ensure success of the proposal. Further, proposals should identify the Team�s capabilities, related experience, techniques, or unique combinations of these that are integral factors for achieving the Challenge objectives to include experience that supports ability to successfully manage and achieve project goals and objectives of similar type and scope. Development of an ideal team should represent the concept of a design-build approach and include: Naval architect(s) Marine Engineer(s) Shipyard(s) Owner/operator/buyer (can be more than one) Technology provider(s) (including fuel supplier, as needed) May include operator/charter party, BCO, logistics partners, port/city/public entity, private financing partner. Teams may submit one or more vessel designs to the Challenge. Funding amounts will be based on: the number of vessel designs proposed their technology innovation, or a combination thereof One or all proposed designs may be funded depending on proposals. There is no limit to number of teams an organization can participate in, however, an organization may only �lead� one team/proposal. No identical teams with rotating �leads� will be permitted. Preference will be given to proposals with team leads represented by U.S. companies, those with U.S. headquarters, and those operating under the U.S. flag Methods: Proposals must include a detailed description of the design and modeling approaches that will be used to meet the Design Challenge Parameters as noted below, including those for fuel burn estimates and URN source level as well as modeling for return on investment and similar economic estimates and valuations. Timeline: The proposed plan should include the expected timeline (not to exceed 18 months) inclusive of kick off meetings with MARAD, design and technology integration and assessment, interim progress report detailing vessel design and technology application progress, data collection and analysis, and final report deliverables. Budget: All proposals must include a compete, detailed, and justifiable budget with general line items for various design components and stages including fuel, URN, and ROI evaluation and calculations. Budgets should demonstrate market conditions or similar that support these budget estimates. Description of key personnel, qualifications, and expected level of effort should also be included. Proposals may also include any additional considerations, outreach, or analysis recommended to achieve the goals of the project. Design Challenge Parameters Design specifications: The objective is for designs to meet or exceed these specifications for fuel efficiency improvement and noise reduction. Recognizing that this is a demonstration of technical feasibility and economic achievability, if these design specifications are not achievable, alternative efficiency and noise improvements should be documented demonstrating the current limits of technologies. These specifications should be considered aspirational to test the limits of the possible within the bounds of the practical. Energy Efficiency: 30% efficiency improvement over a typical vessel design with conventional hull and machinery arrangements and fuels. Underwater Radiated Noise Source Level: Underwater radiated noise source level is defined using the radiat

Who won similar work

11 award notices on SAM.gov in the last 24 months. Match: Same agency (Transportation (all)), same industry group (NAICS 5417).

WinnerAwardsValueLast
THE MITRE CORPORATION2$4.4MMar 23, 2026
Various Washington KY USA1$60.0MAug 4, 2026
GEORGE MASON UNIVERSITY Fairfax VA 22030 USA1$18.0MMay 7, 2026
AECOM TECHNICAL SERVICES, INC.1$6.2MJul 1, 2026
REGENTS OF THE UNIVERSITY OF MICHIGAN Ann Arbor MI 48109 USA1$5.7MOct 7, 2026
University Of California, Los Angeles Los Angeles CA 90024 USA1$5.7MOct 7, 2026
DERQ USA INC1$5.7MOct 7, 2026
Dunlap and Associates, Inc.1$2.2MNov 7, 2024
TEXAS A&M TRANSPORTATION INSTITUTE College Station TX 77843 USA1$663KJan 15, 2025
The Center for American Interests and Policy Incorporated1$280KSep 14, 2026

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.

Latest awards

Competitive landscape

For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Transportation, Dept of (DOT) since 2024 (0 filings)
  • 0 of their lobbyists list a past Transportation, Dept of (DOT) job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 1218 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.