Y1DA--NRM-CONST Proj#632-22-900 Upgrade Boiler Plant
Veterans Affairs · 242-NETWORK CONTRACT OFFICE 02 (36C242)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C24225R0045 in this department, oldest first.
- Aug 28, 2025Award NoticeAmerifield JV LLC · $45.6MOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
Project #632-22-900 Upgrade Boiler Plant Page 1 of Page 6 of 87 Page 1 of This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only announcement; proposals are being requested and a written solicitation will not be issued. The Government reserves the right to award without discussion or make no award from this solicitation. This is a Request for Proposal (RFP). The government anticipates awarding a firm-fixed price contract … (show all)
resulting from this announcement. The North American Industrial Classification System (NAICS) code for this procurement is 236220 with a small business size standard of $45M. This solicitation is a 100% set-aside for Service- Disabled Veteran Owned Small Businesses. Project Magnitude: between $20,000,000 and $50,000,000. Completion time is 1092 calendar days from the issuance of the Notice to Proceed. Department of Veterans Affairs, Network Contracting Office 02, is soliciting proposals from Service-Disabled Veteran Owned Small Businesses (SDVOSBs) to upgrade the existing boiler plant. Respondents to this announcement must fully demonstrate their capability by supplying detailed information along with any other documents necessary to support the requirements below. All prospective bidders must be registered in SAM (www.sam.gov) under NAICS 236220 and verified/visible/certified in SBA at https://veterans.certify.sba.gov at the time of offer submission and before award of this procurement. Failure to be verified by SBA prior to contract award will result in the offerors proposal being deemed non-compliant. All offerors are urged to contact SBA and submit documents to obtain verification of the Small Business status if they have not already done so. In accordance with FAR 52.204-7, prospective contractors shall be registered in the SAM database prior to award of a federal contract. All offerors must submit their VETS-4212 report. All offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the offeror's insurance company and be furnished on the insurance carrier's letterhead. The Architect-Engineer that designed this project cannot be awarded the construction contract. One site visit is schedule at 11:00am EST on Monday, June 16, 2025. Participates will meet at the Northport VAMC, building 200 main lobby. The deadline for all questions is 2:00 pm EST, Monday, June 23, 2025. Offers are to be provided to lester.griffith@va.gov no later than11:00am EST Wednesday, July 09, 2025. CLIN DESCRIPTION PRODUCT # QUANTITY UNIT UNIT PRICE AMOUNT 0001 Upgrade Boiler Plant See Below 1 JB Construction Scope of Work Upgrade Existing Boiler Plant Project 632-22-900 1 General Information 1.1 Location Work performed under this scope will be for and conducted at the Northport VA Medical Center (VAMC) located at 79 Middleville Road, Northport, NY 14215 under VA Project Number 632-22-900. 1.2 Purpose The Northport VA Medical Center currently utilizes boiler plant equipment installed in 1968 which is significantly beyond its recommended service life. The boiler plant provides high pressure steam and heating hot water for heating and other functions to the Main Hospital and multiple other buildings on the campus through an underground distribution system. This steam distribution system is currently undergoing replacement under a separate project. The scope of this project includes constructing an equivalent capacity temporary steam generating capability outside the existing boiler plant, removal of existing steam generation systems, construction of a replacement steam generation system including new boilers, pumps, piping and ancillary equipment and renovation of the existing boiler plant building interior and exterior. The construction of this new system will assume that the replacement of the steam distribution system will be complete by the time the new boiler plant equipment is in operation. There is also a 2-megawatt Combined Heat and Power Plant (CHP) adjacent to the boiler plant which has recently been started up. The new steam systems for this project will incorporate tie-ins and modifications to the CHP systems. The scope also includes improvements to the boiler plant employee service areas including the addition of a women s locker room, a break room, and a supervisor office. This will improve working conditions for the operations and maintenance personnel who work in the plant. Scope The scope of construction work is fully described in the construction documents (drawings and specifications). Additional administrative and management related requirements are described in this construction scope of work document Section 3: Requirements. A complete phasing plan and overview of work is listed below and exists on the drawings. A brief overview of the construction phases, (estimated duration), and scope of work summary are included below: PHASE 1 (21 weeks) Critical submittals with review/approval cycles, including development of baseline schedule, equipment / material ordering, badge requests, site safety and security training. Note: All critical submittals shall be submitted and approved before the contractor is allowed to mobilize on-site. Critical submittals are identified in Specification Section Page 1 of Page 9 of 87 Page 1 of 01 33 23.1 Submittal Register and as Attachment 1. PHASE 2 (42 weeks) Receipt and Installation of temporary Boilers including site preparation, steam / condensate tie-ins, Natural Gas / Fuel Oil tie-ins, Plumbing tie-ins, Electrical tie-ins, lighting / security camera and VA LAN data systems/ security fencing and concrete barrier installations / system commissioning / boiler operations, including boiler operators. PHASE 3 (4 weeks) Proof of Performance Phase. The temporary Boiler system shall be continuously operational producing high-pressure steam to meet the medical center campus requirements for a period of twenty-three (23) continuous days to demonstrate proper functioning of all systems and controls prior to the start of the demolition of equipment, systems and utilities within the existing Boiler Plant. During this proof of performance period, the contractor will be responsible for all operation, maintenance and repairs for the temporary Boilers / controls / utilities systems. Fuel will be supplied by the VA. Upon successful proof of performance demonstration period with VA COR acceptance, the VA will take operational control of the temporary boiler plant. The contractor will continue to be responsible for the temporary boiler plant equipment maintenance, safety device testing, repairs and equipment replacements, as necessary, thru the entire operational period until the Upgraded Boiler Plant has been fully commissioned and has been fully operational for a period of thirty (30) continuous days and accepted for operation by the VA COR. The temporary boiler plant equipment and systems must be maintained to always provide an N+1 system redundancy. The contractor will maintain vegetation below two and one halve inches in height in the construction areas, including the temporary boiler plant area and will provide prompt snow and ice removal services to maintain safe personnel and vehicle access to the temporary boiler plant equipment, including platforms and stairs, and general construction area, including adjacent roadways. PHASES 4 (17 weeks) Start of demolition of existing Boilers and all utility systems within the existing boiler building. Exterior façade work, such as brick / lintel repairs and replacement of man doors and windows can start at this time. PHASES 5 (51 weeks) - Boiler plant new civil, architectural, mechanical, electrical, plumbing, security systems, data communication system, utility work and site work can start at this time. PHASE 6 (21 weeks) System tes
Who won similar work
15 award notices on SAM.gov in the last 24 months. Matched by: Same office (242-NETWORK CONTRACT OFFICE 02 (36C242)), same product/service code (PSC) Y1DA and NAICS 236220.
Single-winner award sizes (15): middle half $348K to $907K, median $695K; range $94K to $6.7M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| TACTICAL CONSTRUCTION, INC | 2 | $7.4M | May 18, 2026 |
| Frontline Group LLC · $FRO | 2 | $2.2M | Jun 16, 2026 |
| J & J MECHANICAL AND CONSTRUCTION GROUP LLC | 2 | $822K | Sep 22, 2026 |
| F & C GROUP JV LLC | 1 | $1.9M | May 20, 2026 |
| JETEX MECHANICAL, LLC | 1 | $950K | Mar 11, 2026 |
| BLACKHORSE LLC | 1 | $864K | May 13, 2026 |
| SERVIAM CONSTRUCTION LLC | 1 | $807K | Mar 18, 2026 |
| DRILLCO INC | 1 | $441K | Oct 30, 2024 |
| BINARY EXCHANGE TECHNOLOGIES LLC | 1 | $412K | May 19, 2026 |
| VETERAN BUILDERS CORP | 1 | $285K | May 6, 2026 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
- Sep 22, 2026J & J MECHANICAL AND CONSTRUCTION GROUP LLC$550KY1DA--NRM-CONST 630-26-101 CONSTRUCTION ONCOLOGY PHARMACY CHILLER USP 800No listed company matched (Materiality N/A)
- Jun 16, 2026Frontline Group LLC$1.5MY1DA--NRM-CONST 630A4-26-409 Replacement AC Package Units$FRO: no recent revenue figure in SEC filings (Materiality N/A)
- May 20, 2026F & C GROUP JV LLC$1.9MY1DA--NRM-CONST 630A4-22-413 Upgrade Station Chilled Water for P&IDNo listed company matched (Materiality N/A)
- May 19, 2026BINARY EXCHANGE TECHNOLOGIES LLC$412K561A4-22-104 Upgrade HVAC & Bathroom B-12No listed company matched (Materiality N/A)
- May 18, 2026TACTICAL CONSTRUCTION, INC$6.7MY1DA--528A6-19-604 Renovate B76 6th floorNo listed company matched (Materiality N/A)
- May 13, 2026BLACKHORSE LLC$864KY1DA--630-26-800 Repair Tunnel and Crawler Space Utilities at Margaret Cochran Corbin VA Medical CenterNo listed company matched (Materiality N/A)
- May 6, 2026VETERAN BUILDERS CORP$285KY1DA--NRM-CONST- 630A4-26-408 Fire Hydrants ReplacementNo listed company matched (Materiality N/A)
- Apr 24, 2026Frontline Group LLC$695KY1DA--NRM - CONST 630-23-108 CONSTRUCTION RENOVATE 12W CARDIAC STRESS LAB$FRO: no recent revenue figure in SEC filings (Materiality N/A)
- Mar 27, 2026J & J MECHANICAL AND CONSTRUCTION GROUP LLC$272KY1DA--632-24-129 Replace Kitchen Exhaust Fans Building 200 at Northport VA Medical CenterNo listed company matched (Materiality N/A)
- Mar 25, 2026TACTICAL CONSTRUCTION, INC$745KY1DA--PROJECT 528A5-25-509 HFC and Whole Health in OPCNo listed company matched (Materiality N/A)
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 1 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.