Loading the records…
Loading the records…
Defense Logistics Agency · SPRMM1 DLA MECHANICSBURG
Defense Logistics Agency wants bids for "CCA, TRANSITION". The original due date (May 22, 2026) has passed; check the latest amendment for the current one. In the last 2 years, similar work went to 3 companies, usually for about $1.1M per award. An award could come any day: the usual time to award has passed.
Put together from the facts on this page; the details and sources are below.
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Every notice posted under solicitation SPRMM126QHB40 in this department, oldest first.
Standard steps for the notice type; not advice about this buyer.
ers, Delivery orders, and modifications) related to the instantprocurement are considered to be "issued" by the government when copies areeither deposited in the mail, transmitted by facsimile, or sent by otherelectronic commerce methods, such as email. The government's acceptance of thecontractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 2. Drawings or technical data are not available for this item. 3. Delivery days_________aro. 4. Offer valid for _____ days. 5. When submitting quotes via EDI, make sure you specify any exceptions (i.e. Mil specs/standards, packaging, I&A, packaging houses etc) or follow up with a hardcopy of the exceptions. If nothing is indicated orreceived, award will be based upon solicitation requirements. Changes or requests for changes after award will have consideration costs deducted on modifications. 6. If you are not the manufacturer of the material you are offering, you must state who the OEM is (cage code) and the part number you are offering. 7. Please provide an email address for follow up communications. ____________________________________________________________ 8. It is recommended that vendors provide contact information to NAVSUP WSS Mechanicsburg in order to receive automated notifications fromNavy Electronic Commerce Online (NECO) when contracts/modifications are issuedby DLA Maritime Mechanicsburg and posted on EDA. To receive thesenotifications, contact: NAVSUPWSS code 025, procurement systems design and contract support division Via email at NAVSUPWSSITIMPHelpdesk@navy.mil. Please includethe following information with your request: CAGE code, company name, address and POC with phone number and email address. 9. Contractors can view their orders, contracts and modifications at the Electronic Document Access (EDA) web tool. This web tool is located at the Procurement Integrated Enterprise Environment (PIEE) website. It is recommended that the contractor register for EDA at https://piee.eb.mil/. Any order resulting from this Request for Quotation will require electronic submittal of Receiving Report and Invoices through PIEE-WAWF. 10. The following DLA Procurement Notes are applicable to this requirement: E06 Inspection and Acceptance at Source (JUN 2018) INSPECTION OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ INSPECTION OF PACKAGING AND FINAL ACCEPTANCE OF MATERIAL WILL BEAT (CAGE & ADDRESS): ______________________________________________________________ \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CCA, TRANSITION . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The CCA, TRANSITION furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;16331 63E917131G1; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscri
3 award notices on SAM.gov in the last 24 months. Matched by: Same office (SPRMM1 DLA MECHANICSBURG), same product/service code (PSC) 5998.
Single-winner award sizes (3): middle half $563K to $1.1M, median $1.1M; range $4K to $1.2M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| KAMPI COMPONENTS CO INC | 1 | $1.2M | Sep 29, 2026 |
| TRIMAN INDUSTRIES INC | 1 | $1.1M | Sep 22, 2026 |
| Dynalec Corp | 1 | $4K | May 4, 2026 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
For the 3 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.