J045--RFQ - BOILER REPAIR HUDSON VALLEY VAHCS - MONTROSE CAMPUS
Veterans Affairs · 242-NETWORK CONTRACT OFFICE 02 (36C242)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C24226Q0816 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
The purpose of this amendment to the solicitation is to: Extend response due date to 8/26/2026 Respond to questions. First set of questions: 1. Project Sequencing RFI 1 - Hydrostatic Test Sequence The Statement of Work requires hydrostatic testing of Boiler No. 2; however, the required timing of the test is not clearly defined. Establishing the condition of the boiler pressure boundary before burner work begins will reduce the risk of performing substantial work on a boiler that has not yet passed the required pressure test. Requested VA Response: Please confirm whether the hydrostatic test mu… (show all)
st be completed, witnessed, and accepted before burner replacement work or other irreversible modifications begin. If a different sequence is intended, please identify the required sequence. VA Response: The hydrostatic test must be completed, witnessed, and accepted before burner replacement work or other irreversible modifications begin. 2. Existing Safety and Equipment Conditions RFI 2 - Boiler No. 2 Main Steam Safety Valves The inspection information and field observations indicate that the two Boiler No. 2 main steam safety valves are leaking. Existing valve data also indicates that the valves are not properly sized under the VHA Boiler and Associated Plant Safety Device Testing Manual, 8th Edition (BEI) capacity criteria and are iron-bodied. The BEI 8th Edition calls for approximately 80% of boiler steam capacity at the lower set pressure and at least 100% at the higher set pressure; the proposed replacement valves are to have carbon-steel bodies. Requested VA Response: Please confirm whether the base contract is to include removal and replacement of both Boiler No. 2 main steam safety valves with properly sized carbon-steel, ASME-stamped and National Board-certified valves, including required installation and testing. If the work will be completed separately by the VA, please identify the required completion sequence. Please also confirm whether separate additive prices are requested for the same work on Boilers No. 1 and No. 3. Supporting Information: See Attachment A - Boiler No. 2 Main Steam Safety Valve Replacement. VA Response: The base contract does NOT include removal and replacement of both existing Boiler No. 2 main steam safety valves. This will be addressed on a separate contract. RFI 3 - Economizer Safety Relief Valves and Tube Leakage The available inspection information identifies deficiencies with the Boiler No. 2 economizer safety relief valves and leakage from the existing economizer tubes. These conditions may affect safe operation and final acceptance of the repaired boiler. Requested VA Response: Please confirm whether replacement of the economizer safety relief valves and repair of the leaking economizer tubes are included in the base contract or will be completed separately by the VA before Boiler No. 2 startup and acceptance testing. Supporting Information: See Attachment B - Boiler No. 2 Economizer Repair. VA Response: The base contract does NOT include the replacement of the economizer safety relief valves and repair of the leaking economizer tubes are included in the base contract. This will be addressed on a separate contract. The timeline of this repair is unknown at this time. If, by chance, the economizer repairs are NOT completed before Boiler No. 2 startup and acceptance testing, the required safety testing for the economizer in the VHA Boiler and Associated Plant Safety Device Testing Manual will be waived. RFI 4 - Forced Draft Motor Interlock Switches The existing Forced Draft Motor Interlock Switch (FDMIS) arrangement does not appear to satisfy the BEI 8th Edition testing requirements for independent current proving on all three motor phases and safe access for required functional testing. Requested VA Response: Please confirm whether correction of the Boiler No. 2 FDMIS deficiency is included in the base contract or will be completed separately by the VA before startup, commissioning, and BEI testing. Supporting Information: See Attachment C - Boiler No. 2 FDMIS Deficiency Correction VA Response: The base contract does NOT include the correction of the Boiler No. 2 FDMIS deficiency. 3. Propane and Controls Integration RFI 5 - Emergency Stop System Integration The new propane header must interface with the facility Emergency Stop system. The existing point of connection and E-stop controls cabinet could not be verified during the site visits, and the available drawings do not clearly identify the required interface. Requested VA Response: Please identify the existing E-stop system point of connection and provide any available control drawings. If no suitable point of connection exists, please confirm whether the contract is to include a new VA-compliant E-stop panel and all required system integration. Supporting Information: See Attachment D - Emergency Fuel Shutdown System. VA Response: There is no new E-Stop to be required to be installed on this contract. There are existing E-Stop buttons located in the plant (one in the control room, one on the Boiler Plant Master, and one on each boiler control panel) which will operate the propane valve. RFI 6 - Master Control Panel and SCADA Integration The propane header must interface with the existing Master Control Panel and SCADA system. During the walkthrough, MicroMod advised that the existing Master Control Panel has insufficient available I/O for the propane-system interface. MicroMod further advised that an upgraded Red Lion platform could be configured with the additional I/O and communications capability required for this integration. Requested VA Response: Please confirm whether the contract scope includes all required I/O hardware, Red Lion HMI or communications-platform upgrades, programming, graphics, and Master Control Panel/SCADA modifications necessary to provide a complete and operational propane-system interface. VA Response: Contractor shall furnish and install an electro mechanical gas shut off valve (Maxon or approved equal) upstream of the fuel pressure regulator and downstream of the gas filter/strainer to protect the downstream safety shut off valves. RFI 7 - Boiler No. 2 Human-Machine Interface During the recent walkthrough, it was observed that the Boiler No. 2 control cabinet no longer has a functional Human-Machine Interface (HMI). A working HMI is required to interface with the existing MicroMod loop controllers and to configure, monitor, start up, test, and commission the Boiler No. 2 combustion-control system. A direct hardware swap is not adequate because current Red Lion models do not duplicate the obsolete unit's side-button arrangement; the existing screens and graphics must be re-engineered and converted for the new display. Requested VA Response: Please confirm whether the contract scope will be revised to include furnishing, engineering, programming, graphics conversion, installation, integration, testing, and commissioning of a new Red Lion HMI compatible with the existing MicroMod loop controllers and associated boiler-control equipment. Supporting Information: See Attachment E - Boiler No. 2 HMI Replacement. VA Response: The VA will need more time to provide response 4. OEM Responsibilities RFI 8 - Victory Energy Scope Our interpretation is that Victory Energy's role is limited to OEM engineering support, interface review, refractory recommendations, and commissioning assistance, and does not include furnishing additional equipment or performing redesign services. Requested VA Response: Please confirm this interpretation or identify any additional equipment, engineering, onsite services, commissioning activities, or redesign responsibilities required from Victory Energy. VA Response: The Interpretation of Victory Energy s role is correct with the following clarifications (in bold). Victory Energy s role is limited to OEM engineering support, interface review and recommendations, refractory recommendations to include demolition and ins
Who won similar work
19 award notices on SAM.gov in the last 24 months. Match: Same office, same NAICS 238220.
| Winner | Awards | Value | Last |
|---|---|---|---|
| MICHAEL KOST BRONX 10454 | 3 | $2.7M | Jun 24, 2026 |
| WELCH CONSTRUCTION INC. | 2 | $8.0M | Feb 17, 2026 |
| AEONRG LLC | 1 | $51.9M | May 14, 2026 |
| T.C.I. CONSTRUCTION & MANAGEMENT CO., INC. | 1 | $7.9M | Sep 3, 2025 |
| VETERANS CONTRACTING GROUP, INC. | 1 | $6.3M | Mar 2, 2026 |
| J & J MECHANICAL AND CONSTRUCTION GROUP LLC | 1 | $3.4M | Feb 11, 2026 |
| TACTICAL CONSTRUCTION, INC | 1 | $3.3M | May 22, 2026 |
| MARTIN ENERGY GROUP SERVICES LLC | 1 | $1.1M | Jun 17, 2025 |
| TRUHEAT LLC | 1 | $1.1M | Sep 29, 2025 |
| KF GROUP LLC | 1 | $988K | Jun 16, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Jul 6, 2026CALDAIA CONTROLS LLC$361KVAHVHCS Boiler Plant Cleaning
- Jun 24, 2026MICHAEL KOST BRONX 10454$1.4MJ041--Liebert Air Conditioning Maintenance
- Jun 16, 2026KF GROUP LLC$988KY1DA--561A4-26-503 Replacement Coils for Buildings 4,53,54,57,135,143
- May 29, 2026MILLER & CHITTY CO KENILWORTH 07033 JIB$667KJ045--FY26- NJHS Annual Boiler Cleaning and Maintenance Services
- May 22, 2026TACTICAL CONSTRUCTION, INC$3.3MY1DA--528A5-22-506-Replace Building 118 FCUs
- May 14, 2026AEONRG LLC$51.9MCorrect FCA D & F Deficiencies Boiler Plant.
- May 12, 2026HurtVet Subcontracting, Inc.$434KH142--Lyons Fire Protections Systems ITM/Repair
- Mar 2, 2026VETERANS CONTRACTING GROUP, INC.$6.3MZ1DA--526-23-133 - IMPROVE OR AND SPD HVAC
- Feb 17, 2026WELCH CONSTRUCTION INC.$1.3MZ1DA--NRM-CONST- 528A7-23-103 REPLACE FAN COILS
- Feb 11, 2026J & J MECHANICAL AND CONSTRUCTION GROUP LLC$3.4MY1DZ--620A4-22-101 Replace Fan Coils in Building 18
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.