C1DA--614-26-1-5641-0001 - Project 614-26-101 - Correct SPS Deficiencies
Veterans Affairs · 249-NETWORK CONTRACT OFFICE 9 (36C249)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C24925R0064 in this department, oldest first.
- Aug 21, 2025 · this noticePre-solicitation
- Jan 7, 2026Award NoticeTRIPLE C-THE A & E GROUP LLC · $707KOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
DESCRIPTION: This is a Pre-Solicitation Notice for project number 614-26-101 that requires Architect/Engineering (A/E) Design Services to Correct SPS Deficiencies at the Memphis VA Medical Center, located in Memphis TN. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSALS. ONLY THE A/E FIRMS RESPONDING TO THIS ANNOUNCEMENT BY SUBMITTING AN SF330 PACKAGE ON TIME WILL BE CONSIDERED FOR INITIAL EVALUATION. FOLLOWING INITIAL EVALUATION OF THE A/E FIRMS AND THEIR SF330S, A SOLICITATION FOR A PRICE PROPOSAL WILL BE SENT TO THE HIGHEST TECHNICALLY RATED A/E FIRM TO PROVIDE THE TYPE OF SERVICE(S) REQUIRED… (show all)
. The A/E Services contract that is anticipated to be awarded will be procured in accordance with the Brooks Act (Public Law 92- 582), Federal Acquisition Regulation Part 36.6 and VA Acquisition Regulation 836.6. In accordance with FAR 36.209 Construction Contracts With Architect-Engineer Firms , no contract for the construction of a project shall be awarded to the firm that designed the project or its subsidiaries or affiliates, except with the approval of the head of the agency or authorized representative. A/E DESIGN SERVICES SCOPE SYNOPSIS: Located at the Memphis VA Medical Center, in Memphis TN, to renovate approximately 12,100 sq. ft. to correct architectural deficiencies within the SPS areas. This project will replace the ceilings and flooring to ensure tight seals, repair damaged walls and other features. The existing ceiling within SPS sterile storage is acoustic tiles and needs to be changed to a solid seamless ceiling. The flooring in many areas is quarry tiles that shall be replaced with seamless flooring to maintain standards within sterile areas for Project No. 614-26-101 - Correct SPS Deficiencies. A-E is to provide in-depth investigation of all existing space and utility systems listed above. The A-E shall also evaluate and provide design services for upgrading existing Correct SPS Deficiencies to meet future demands. Work will include but is not limited to the following major scope matters or deficiencies: The A-E shall provide design period services to include drawings and specifications reflecting specific tasks identified in this statement of work document and as identified during project discussion meetings. A-E shall provide competent design period services using staff and consultants adequately knowledgeable of the various subordinate design disciplines including but not limited to life safety and other building/utility systems as required for the project. The A-E shall develop plans and system schematics for actual in-place components from VA-provided drawings and from field verification on site. Verify existing conditions affecting design. Information provided by VA on record drawings shall be verified for critical dimensions and critical components that may affect the design. A-E shall consider adjacent systems and components (architectural as well as utility systems) to avoid unforeseen site condition change orders to the construction contract. The A-E shall verify necessary building architectural and utility system components to provide for a full and complete design of replacement architectural elements and utility system components. During the project the A-E shall be required to attend project meetings. The A-E shall record meeting minutes and furnish meeting minutes and sketches as required to reach concurrence and approval by the design team members. Minutes shall be forwarded to all attendees within 36 hours of the meeting for review and comment. The A-E shall incorporate appropriate comments, finalize the meeting minutes and send out the final meeting minutes within one week of the meeting. VA is contracting design period services to include Schematic Design (SD) Development, Design Development (DD), Construction Documents (CD), and Bid Documents. All submissions and related work for each design phase shall conform to the requirements in this document and Program Guide (PG)-18-15, Volume C A-E Submission Instructions as modified in this document. See the Access to VA Standards section of Part 3 for webpage to obtain PG-18-15. Basics: Project design shall clearly show the work required, phasing of work required, and instructions to the construction contractor regarding how to accomplish the necessary renovations in a 24/7 medical environment taking into consideration demolition, infection control, and specialized facility requirements as discussed with VA staff. Also included will be limitations, e.g. work required to be completed outside of standard administrative hours, work limited to periods shorter than a single shift, etc., for specific locations in the project. END OF DESIGN SCOPE SYNOPSIS Digital copies of the as-builts are limited. The consultant will be expected to fully investigate and confirm the validity of hard copy as-builts and other drawings. This will include independent investigation of the VAMC s flat files by the consultant to determine and procure the information required for the complete design. All offerors are advised that in accordance with VAAR 836.606-73 the total cost of the architect or engineer services contracted for must not exceed 6 percent of the estimated cost of the construction project plus any fees for related services and activities. Additionally, FAR Clause 52.236-2 (c) - Design Within Funding Limitation, will be applicable to this procurement action. Design limitation costs will be provided to the most highly rated AE firm selected to complete the design. Interested firms should submit their current SF-330 to Robert.Glenn2@va.gov. The SF-330s are due by October 6, 2025, at 2:00 PM (EST). Security Issues, Late Bids, Unreadable Offers Late submission of offers are outlined at FAR Parts 52.212-1(f), 52.214-7, and 52.215-1(c) (3).� Particular attention is warranted to the portion of the provision that relates to the timing of submission. Please see FAR 15.207(c) for a description of the steps the Government shall take with regard to unreadable offers. To avoid rejection of an offer, vendors must make every effort to ensure their electronic submission is virus-free.� Submissions or portions thereof submitted and which the automatic system detects the presence of a virus or which are otherwise unreadable will be treated as unreadable pursuant to FAR Parts 14.406 and FAR 15.207(c ). The virus scanning software used by our e-mail systems cannot always distinguish a macro from a virus. Therefore, sending a macro embedded in an e-mail message or an e-mail attachment may cause the e-mail offer to be quarantined. You may send both the spreadsheet and the spreadsheet saved in PDF format to ensure that your proposal is readable. Password protecting your offer is not permitted. The Contracting Officer will file the offer electronically which will allow access only by designated individuals. Important Notice: Apparent successful offerors must be registered in the U.S. Small Business Administration (SBA) site at the time of submission of proposal. Failure to be both VERIFIED by the SBA and VISIBLE at the time of proposal submission, time of interview, and at time of award will result in the offeror s proposal being deemed non-responsive. All offerors are urged to contact the SBA DSBS (https://dsbs.sba.gov/search/dsp_dsbs.cfm) and submit the required documents to obtain verification of their SDVOSB status if they have not already done so. Response Time: The successful A-E shall abide by a four (4) hour response time for Memphis VA Medical Center, during the design phase and the construction period services (CPS) phase, as appropriate. The VA has no preference on the method utilized by contractors on achieving the four (4) hour response time. The response time will be determined from the moment the request to the A-E to be on site is submitted. The individual or individuals responding can be either the prime contractor or a subcontractor that s part of the design team. The selection process will follow t
Who won similar work
4 award notices on SAM.gov in the last 24 months. Matched by: Same office (249-NETWORK CONTRACT OFFICE 9 (36C249)), same product/service code (PSC) C1DA and NAICS 541330.
Single-winner award sizes (4): middle half $683K to $1.5M, median $996K; range $650K to $2.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| HEALTH FACILITY SOLUTIONS COMPANY | 1 | $2.0M | Feb 5, 2026 |
| FFE ENVIRONMENTAL SERVICES INC | 1 | $1.3M | Nov 13, 2025 |
| DAV ENERGY SOLUTIONS, INC. | 1 | $694K | Apr 9, 2026 |
| RDC JPA ARCHITECTURE, L.L.L.P. | 1 | $650K | Apr 27, 2026 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
- Apr 27, 2026RDC JPA ARCHITECTURE, L.L.L.P.$650KC1DA--596-26-106 Renovate & Repair B-28 Ground for SPSNo listed company matched (Materiality N/A)
- Apr 9, 2026DAV ENERGY SOLUTIONS, INC.$694KC1DA--614-25-103 Correct Nutrition and Food Service DeficienciesNo listed company matched (Materiality N/A)
- Feb 5, 2026HEALTH FACILITY SOLUTIONS COMPANY$2.0MC1DA--626-26-101 - AE Upgrade Nashville Generator SystemsNo listed company matched (Materiality N/A)
- Nov 13, 2025FFE ENVIRONMENTAL SERVICES INC$1.3MC1DA--621-24-112- A/E Renovate B34 Clock Tower for Physical TherapyNo listed company matched (Materiality N/A)
Competitive landscape
For the 4 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.