Loading the records…
Loading the records…
Veterans Affairs · 244-NETWORK CONTRACT OFFICE 4 (36C244)
Veterans Affairs wants bids for "542-23-201 | Replace Roofs Building 69 and 139 | NCO 4 Construction East (VA-26-00047303)". The original due date (Jun 9, 2026) has passed; check the latest amendment for the current one. In the last 2 years, similar work went to 4 companies, usually for about $357K per award. An award could come any day: the usual time to award has passed.
Put together from the facts on this page; the details and sources are below.
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Every notice posted under solicitation 36C24426B0010 in this department, oldest first.
Standard steps for the notice type; not advice about this buyer.
ntractor s responsibility for abatement of any asbestos, lead, and other hazardous materials and the replacement and repair of the roof of Building 139 in its entirety including both the pitched asphalt shingle and the flat (low slope) EPDM roofing. This will also include the protection and preservation of the existing facilities. There are skylights on the flat (low slope) EPDM roof that were to be removed. The existing skylights will be removed in their entirety. The remaining voids left by the existing skylights will now be in filled and covered with roofing membrane. The existing lightning protection will be removed and replaced with code compliant protection equipment. This project will provide complete and functional systems in accordance with the Department of Veterans Affairs (VA) requirements, Technical Information Library (https://www.cfm.va.gov/til/spec.asp), industry standards and all applicable code requirements. This applies to each system and every system, which is affected by this project, even if only partially modified. The systems and equipment will maximize energy efficiency to the extent practical. The contractor is to fully demolish the current pitched asphalt shingled roof of Building 139 as well as the flat (low slope) EPDM roof section covering the building space. The contractor is to develop phasing plans with assistance from the CVAMC to phase temporary relocation of refrigerated and frozen goods within the existing kitchen that is utilizing existing walk-in cooler and freezers when the roof curbs for the freezers condensing units are being installed. The contractor is to provide plans for new curb rails for equipment with proper maintenance clearances taken into amount of 12 inches above the EPDM roof and install them. The contractor is to repair damage due to leakage and age as needed and required for Building 139 s roof structure. This includes but is not limited to roof decking, roof supports, or other structural components. The contractor is to replace the pitched asphalt shingle roof as well as the flat (low slope) EPDM roofing of Building 139 with proper adherence to the pitch diagrams in the drawings to ensure proper drainage. The contractor is to remove the current lightning protection on the roof and replace it with code complaint lightning protection equipment for Building 139 as a full replacement. The contractor is to remove the skylights above the dining hall space in Building 139 their entirety. The voids in the roof where the skylights currently are located will be infilled and have added roofing material applied over the substrate matching the roofing deck and supports adjacent to the voids. The contractor is to remove the existing sconce lighting in the skylight lightwell, with remaining surfaces patched and repaired as necessary. New pendant fixtures are to be installed in the existing lightwell utilizing existing circuitry. The drywall areas adjacent are to be repainted as noted in construction documents. The contractor is to install new EPDM protection walking pads to access required equipment upon the roof. The contractor is to remove two trees alongside the building that have their limbs resting on or hanging over the roof of Building 139 as denoted in the construction documents. The contractor is to protect the integrity of the equipment that is to be preserved on the roof that will be removed and reinstalled to replace the roof of Building 139. The contractor is to investigate the space for asbestos, lead, and any other harmful materials. The contractor will create a plan to abate it within Building 139 s construction zone as applicable and intact such plan. Building 69: Physical Medicine and Rehabilitation, KT, OT, PT, Audiology, Speech, Prosthetics For building 69, the contractor will fully encompass the abatement of any asbestos, lead, and other hazardous materials and the replacement and repair of the roof of Building 69 in its entirety but not limited to its flat (low slope) EPDM roofing. This will include the protection and preservation of the existing facilities. There is dunnage on the flat (low slope) EPDM roof that will be removed and the area around it repaired while considering the structural integrity of the roof when performing this task. The lightning protection of the building will be removed and replaced with code required protection equipment. The Coatesville VAMC has identified existing exhaust fans that are no longer in service which will be removed. Any voids remaining will be infilled and covered with roofing material. The glazed natatorium will have targeted repairs identified to further ensure it is watertight. This project will provide complete and functional systems in accordance with the Department of Veterans Affairs (VA) requirements, Technical Information Library (https://www.cfm.va.gov/til/spec.asp), industry standards and all applicable code requirements. This applies to each system and every system, which is affected by this project, even if only partially modified. The systems and equipment will maximize energy efficiency to the extent practical. The contractor is to demolish the current flat (low slope) EPDM roof of Building 69 while preserving the integrity of the building. The contractor then will replace the (low slope) EPDM roofing of Building 69 as well as any damaged equipment or structure damaged during demolition. All new installed roofing by the contractor is to be pitched according to the pitch plan in the construction documents to ensure proper drainage. The contractor is to repair any structural damage due to leakage and age as needed and required for Building 69 s roof structure. This includes but is not limited to the metal roofing decking, roofing supports, and any other structural components. The contractor is to investigate the space for asbestos, lead, and any other harmful materials. The contractor will create a plan to abate it within Building 69 s construction zone as applicable and intact such plan. The contractor is to remove the lightning protection on the roof and replace it with code required lightning protection equipment for Building 69. The contractor is to investigate the structural effect of removing the dunnage on the roof of Building 69 and how it can be efficiently and safely done with minimal impact on the structural integrity of the building. The contractor will then intact the approved plan. The contractor is to install new EPDM protection walking pads to access required equipment upon the roof. The contractor is to provide plans for new curb rails for equipment with proper maintenance clearances taken into amount of 12 inches above the EPDM roof and install them. The contractor is to protect the integrity of the equipment that is to be preserved on the roof that will be removed and reinstalled to replace the roof of Building 69. The glazed natatorium have targeted repairs identified in the construction documents that the contractor is to complete to ensure it is watertight. This includes investigating any potentially additional issues that would cause water penetration in the glass structure and repair them. General Requirements - All work will occur Monday to Friday from 6:30 am to 5 pm. All evidence of work on the project must be cleaned and removed daily to prevent patient tampering. At no time will tools or an active job site be unma
4 award notices on SAM.gov in the last 24 months. Matched by: Same office (244-NETWORK CONTRACT OFFICE 4 (36C244)), same product/service code (PSC) Z2DA and NAICS 236220.
Single-winner award sizes (4): middle half $168K to $1.1M, median $357K; range $60K to $2.8M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| RLS CONSTRUCTION GROUP, LLC | 1 | $2.8M | Aug 25, 2025 |
| GC Joint Venture ESSEX 21221 | 1 | $509K | Jun 17, 2025 |
| Takota Flats-SEG JV LLC | 1 | $204K | Jun 13, 2025 |
| HOME MAINTENANCE GROUP LLC | 1 | $60K | Jul 1, 2025 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
For the 4 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.