Z1DA--554-26-106 Replace DW Valves.
Veterans Affairs · NETWORK CONTRACT OFFICE 19 (36C259)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C25926R0057 in this department, oldest first.
- Jul 20, 2026Pre-solicitationOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
N AMENDMENT TO SOLICITATION 36C25926R0057 POSTED ON SEPTEMBER 15, 2026. The purpose of this amendment is to : To extend due date for proposals from September 16, 2026, to September 30, 2026, at 10 AM. MT. RFI�s will be responded in a second amendment at later date before proposals due date. To post site visit documents : All offers please email them to Elia L Ruiz Manzo at Elia-Laritza.Ruiz-Manzo@va.gov. All other items and conditions remain the same. List of Attachments See attached document: Site Visit Meeting Doc. See attached document: Site Visit Attendance_FE. ----------------------------… (show all)
------------------------------------------------------------------------------------------------------------------------------ OBJECTIVE The Department of Veterans Affairs has a requirement to install valves on water supply lines to enable individual building isolation from the campus water supply at the Rocky Mountain Regional VA Medical Center. Facility Management Services has identified approximately 30 valves on domestic cold water, domestic hot water, and domestic hot water return that require valve installation or valve replacement. The intent of this contract is to install isolation shutoff valves on the domestic cold water (DCW), domestic hot water (DHW), and domestic hot water recirculation (DHWR) pipes at key points to allow facilities maintenance to control water flow to individual buildings. STATEMENT OF WORK In phase 1, the contractor shall: For Building A: Coordinate an 8 hour water shutoff with the COR. This shutdown will likely be scheduled weekday-overnight or weekend-daytime. The DCW/DHW/DHWR shutoffs shall be accomplished using dual ice plugs on each pipeline. The contractor shall position the ice plugs such that a mid-section of pipe can be removed and replaced with a pre-built pipe section that includes a shutoff valve. Ensure the pre-built section and installation effort are conducted at an appropriate cleanliness level for domestic water supply. Install the pre-built pipe section and utilize pipe connections that are grooved coupling or flange as appropriate for the use-case and installation scenario. Re-insulate installed pipe sections. Pipe, valve, and connection/coupler material and sizes shall be appropriate for the use-case and installation scenario. For Building E: Coordinate an 8 hour water shutoff with the COR. This shutdown will likely be scheduled weekday-overnight or weekend-daytime. The DCW/DHW/DHWR shutoffs shall be accomplished using dual ice plugs on each pipeline. The contractor shall position the ice plugs such that a mid-section of pipe can be removed and replaced with a pre-built pipe section that includes a shutoff valve. Ensure the pre-built section and installation effort are conducted at an appropriate cleanliness level for domestic water supply. Install the pre-built pipe section and utilize pipe connections that are grooved coupling or flange as appropriate for the use-case and installation scenario. Re-insulate installed pipe sections. Pipe, valve, and connection/coupler material and sizes shall be appropriate for the use-case and installation scenario. For Building G: Coordinate an 8 hour water shutoff with the COR. This shutdown will likely be scheduled on a Sunday. The DCW/DHW/DHWR shutoffs shall be accomplished using dual ice plugs on each pipeline. The contractor shall position the ice plugs such that a mid-section of pipe can be removed and replaced with a pre-built pipe section that includes a shutoff valve. Ensure the pre-built section and installation effort are conducted at an appropriate cleanliness level for domestic water supply. Install the pre-built pipe section and utilize pipe connections that are grooved coupling or flange as appropriate for the use-case and installation scenario. Re-insulate installed pipe sections. Pipe, valve, and connection/coupler material and sizes shall be appropriate for the use-case and installation scenario. For Building D+F: Coordinate an 8 hour water shutoff with the COR. This shutdown shall be a double install with two crews to accomplish a shutdown and valve install happening simultaneously and will likely be scheduled weekday-overnight or weekend-daytime. The DCW/DHW/DHWR shutoffs shall be accomplished using dual ice plugs on each pipeline. The contractor shall position the ice plugs such that a mid-section of pipe can be removed and replaced with a pre-built pipe section that includes a shutoff valve. Ensure the pre-built section and installation effort are conducted at an appropriate cleanliness level for domestic water supply. Install the pre-built pipe section and utilize pipe connections that are grooved coupling or flange as appropriate for the use-case and installation scenario. Re-insulate installed pipe sections. Pipe, valve, and connection/coupler material and sizes shall be appropriate for the use-case and installation scenario. For Building B: Coordinate an 8 hour water shutoff with the COR. This shutdown will likely be scheduled overnight. The DCW/DHW/DHWR shutoffs shall be accomplished using dual ice plugs on each pipeline. The contractor shall position the ice plugs such that a mid-section of pipe can be removed and replaced with a pre-built pipe section that includes a shutoff valve. Ensure the pre-built section and installation effort are conducted at an appropriate cleanliness level for domestic water supply. Install the pre-built pipe section and utilize pipe connections that are grooved coupling or flange as appropriate for the use-case and installation scenario. Re-insulate installed pipe sections. Pipe, valve, and connection/coupler material and sizes shall be appropriate for the use-case and installation scenario. For Building H: Coordinate an 8 hour water shutoff with the COR. This shutdown will likely be scheduled overnight. The DCW/DHW/DHWR shutoffs shall be accomplished using dual ice plugs on each pipeline. The contractor shall position the ice plugs such that a mid-section of pipe can be removed and replaced with a pre-built pipe section that includes a shutoff valve. Ensure the pre-built section and installation effort are conducted at an appropriate cleanliness level for domestic water supply. Install the pre-built pipe section and utilize pipe connections that are grooved coupling or flange as appropriate for the use-case and installation scenario. Re-insulate installed pipe sections. Pipe, valve, and connection/coupler material and sizes shall be appropriate for the use-case and installation scenario. For Building K: Coordinate an 8 hour water shutoff with the COR. This shutdown will likely be scheduled overnight. The DCW/DHW/DHWR shutoffs shall be accomplished using dual ice plugs on each pipeline. The contractor shall position the ice plugs such that a mid-section of pipe can be removed and replaced with a pre-built pipe section that includes a shutoff valve. Ensure the pre-built section and installation effort are conducted at an appropriate cleanliness level for domestic water supply. Install the pre-built pipe section and utilize pipe connections that are grooved coupling or flange as appropriate for the use-case and installation scenario. Re-insulate installed pipe sections. Pipe, valve, and connection/coupler material and sizes shall be appropriate for the use-case and installation scenario. For Canteen: Coordinate an 8 hour water shutoff with the COR. This shutdown will likely be scheduled overnight. The DCW/DHW/DHWR shutoffs shall be accomplished using dual ice plugs on each pipeline. The contractor shall position the ice plugs such that a mid-section of pipe can be removed and replaced with a pre-built pipe section that includes a shutoff valve. Ensure the pre-built section and installation effort are conducted at an appropriate cleanliness level for domestic water supply. Install the pre-built pipe section and utilize pipe connections that are grooved coupling or flange as appropriate for the use-case and installation s
Who won similar work
344 award notices on SAM.gov in the last 24 months. Match: Same agency (Veterans Affairs), same NAICS 238220.
| Winner | Awards | Value | Last |
|---|---|---|---|
| BRAND CONSTRUCTION LLC | 9 | $6.7M | Aug 17, 2026 |
| MARK-VII ENTERPRISES, INC. | 9 | $4.1M | Oct 1, 2026 |
| AmeriTech Contracting LLC | 8 | $26.8M | Aug 11, 2026 |
| RECON CONSTRUCTION SPECIALTIES LLC | 8 | $20.6M | Aug 20, 2026 |
| STERILECO LLC | 7 | $1.2M | Apr 27, 2026 |
| SKYTEK LLC | 6 | $11.2M | Aug 5, 2026 |
| VENERGY GROUP LLC | 6 | $8.5M | Aug 6, 2025 |
| CALDAIA CONTROLS LLC | 6 | $1.5M | Aug 4, 2026 |
| WARRIOR DYNAMICS LLC | 6 | $696K | Sep 1, 2026 |
| JETT'S SPECIALTY CONTRACTING, LLC | 5 | $49.2M | Sep 24, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Oct 15, 2026CAPEX CONSTRUCTION LLC$11.2MY1DA--CON-NRM-668-21-100 Upgrade AHUs 18-20-22 Mechanical Systems
- Oct 6, 2026IONIC CONTRACTORS LLC$87KFire Suppression Survey at the Cleveland VA Medical Center
- Oct 6, 2026Trane U.S. Inc.$3.4MJ041--FY26: Building Automation System
- Oct 1, 2026MARK-VII ENTERPRISES, INC.$165KW041--Rental Chiller
- Sep 29, 2026JOHNSONDANFORTH, INC$36KRepair Pump Bldg. 200
- Sep 29, 2026TROY BOILER WORKS, INC$1.6MJ045--36C24226P1049 - BOILER REPAIR HUDSON VALLEY VAHCS - MONTROSE CAMPUS (1X) -
- Sep 29, 2026EMPOWER EXCELLENCE, LLC$76KSpokane VA 5 Yr Backflow Testing RFQ
- Sep 28, 2026GRAY MATTER MECHANICAL, INC.$20KMiramar National Cemetery HVAC Maintenance Services
- Sep 24, 2026JETT'S SPECIALTY CONTRACTING, LLC$4.8MZ2NB--657A5-22-103, Replace Air Handlers in Building 1, MRN
- Sep 23, 2026BOILER CHILLER SYSTEMS, LLC$32KJ041--EMERGENCY AHU Bearing Replacement & Duct Repair
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.