SolicitationPosted Sep 10, 2026·Responses due Oct 21, 2026

Basic Ordering Agreement for Steel

Army Contracting Command (ACC) · W6QK ACC-RI

Stage
Open solicitation
NAICS
331110
Value
Not stated
Solicitation
W519TC26BOAS
Set-aside
Small Business Set Aside - Total
PSC
9515
Place
Rock Island, IL, USA
Contact
Andrea Garcia (andrea.garcia63.civ@army.mil)
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation W519TC26BOAS in this department, oldest first.

Early notice
None posted
Solicitation
  • Aug 20, 2026
    Solicitation
    Open
  • Sep 10, 2026 · this notice
    Solicitation
Award
Not yet. Typical award: Sep 15, 2026 to Oct 25, 2026, middle of the range Oct 1, 2026.
Measured from 1578 past solicitations at Dept of the Army that later posted an award (middle half of cases, counted from Aug 20, 2026).
Responses are due Oct 21, 2026, so an award before then is unlikely; past cases include short solicitations.

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

SOLICITATION EXECUTIVE SUMMARY 1. THREE-STEP PROCUREMENT FRAMEWORK The Government will procure raw metal stock and components requirements utilizing a three-step process: Step One (Combined Synopsis/Solicitation): A separate Pre-solicitation Notice will not be issued; this synopsis is combined with the solicitation on SAM.gov in accordance with FAR Subpart 12.6. Individual order-level Request for Quotes (RFQs) under this Basic Ordering Agreement (BOA) will be competed exclusively within the qualified pool and will not be synopsized, ensuring rapid execution. Clauses are in effect through FAC 2… (show all)

026-01. The primary NAICS code is 331110 (Iron and Steel Mills and Ferroalloy Manufacturing; Size Standard: 1,500 employees). Other codes are listed in Attachment 001 - Purchase Description, and the Product Service Code is 9515 (Plate, sheet, strip, foil, and leaf). Step Two (Master BOA Execution): The BOA Request for Proposal (RFP) will be released once for qualifications. The Government will execute no-cost, multi-award BOAs to responsible offerors whose proposals are compliant with Section L and rated "Acceptable" under Section M. BOAs are valid for up to five (5) years. NOTE: This RFP is the only opportunity to obtain a raw metal stock and components BOA. Proposals will not be accepted or executed at any other time. If a contractor wishes to participate in any future raw metal stock and component orders, they must respond to this initial RFP. Step Three (Order-Level Competition): As recurring supply needs arise, the PCO will issue competitive, order-level RFQs to the BOA pool. To participate, contractors must hold an active master BOA as of the RFQ closing date. Orders will result in individual, competitive Firm-Fixed-Price (FFP) contracts (Orders) under FAR 16.703. 2. SCOPE Contractors will provide commercial products supporting the following CONUS sites including but not limited to: Blue Grass Army Depot (BGAD) Pine Bluff Arsenal (PBA) Letterkenny Munitions Center (LEMC) Crane Army Ammunition Activity (CAAA) Tooele Army Depot (TEAD) McAlester Army Ammunition Plant (MCAAP) Joint Manufacturing and Technology Center (JMTC) Tank-Automotive and Armaments Command (TACOM) 3. SUBCONTRACTING FLEXIBILITY Offerors must demonstrate technical capability within the scope of Attachment 001: REV 1 Product Description. Capability may be achieved with or without subcontractors. In Step Three order-level proposals, contractors are not bound to the subcontractors proposed in Step Two but must propose resources necessary to perform each individual order. 4. BASIS FOR AGREEMENT EXECUTION The Government will execute no-cost, multi-award BOAs to responsible offerors with compliant proposals (Section L) rated "Acceptable" (Section M). NOTE: The Government reserves the right to waive the Compliance Review if in its best interest. The Government intends to execute BOAs on initial proposals without discussion. It reserves the right to negotiate if in its best interest but will only do so with offerors whose proposals do not contain significant informational deficiencies. LEGAL NOTICE: This master BOA process is not a competitive acquisition; the source selection procedures of FAR Part 15 do not apply. No pricing is requested or evaluated at this stage. Execution of a BOA does not constitute a contract or guarantee future orders. SECTION B � CONTRACT LINE-ITEM NUMBERS (CLINS) CLINs will be established at the order level for administrative categorization. SECTION C � EXECUTION BUSINESS RULES 1. GENERAL RULES The ordering period shall not exceed five (5) years from initial execution (DFARS 216.703(c)). Each BOA will be formally reviewed by the PCO annually (FAR 16.703(c)(2)) and revised as necessary. BOAs shall be changed only by modifying the agreement itself, not by individual orders. Modifications do not apply retroactively to active orders. Prior to the annual review, the PCO will confirm in writing if the contractor wishes to maintain the agreement. Either party may elect not to renew. The Government may cancel the BOA at any time if in its best interest. Only the Army Contracting Command�Rock Island Arsenal (ACC-RIA) is authorized to execute, modify, or perform annual reviews of these master BOAs. Other DoD activities may place orders under these BOAs with ACC-RIA approval. 2. STEP TWO EXECUTED BOAS (QUALIFICATION PHASE) Offerors must demonstrate technical capability by filling out Attachment 001- REV 1 Purchase Description by answering �Yes� to the items that can be completed and �No� to the items that cannot be completed by offeror. The purchase description at the order level will include but is not limited to the list found in Attachment 001- REV 1 Purchase Description. 3. STEP THREE ORDER REQUESTS (ORDERING PHASE) Order competitions are limited to active master BOA holders. Order performance periods will be established in each order and remain valid through completion, even if they extend beyond the master BOA's 5-year term. Specific evaluation criteria (e.g., Price-Only, LPTA, or Tradeoff) will be identified in each order�s RFQ. Detail purchase descriptions requirements will be provided at the order level. All orders will be Firm-Fixed-Price (FFP). Work shall not begin until the order is awarded. Business size standards and Non-Manufacturer Rule compliance will be certified and monitored at the order level. Offerors are required to provide pricing catalogs at the order level. SECTION H � SPECIAL CONTRACT REQUIREMENTS 1. CYBERSECURITY MATURITY MODEL CERTIFICATION (CMMC) Conditional Self-Assessment: To be eligible for award, and to remain eligible for orders, the contractor must maintain at least a conditional CMMC Level 2 Self-Assessment in the Supplier Performance Risk System (SPRS) at award. Maintenance: Failure to maintain this status will result in immediate restriction from participating in order RFQs, inability to exercise options, and potential removal from the raw metal stock and components BOA. Flow-Down: Subcontractor CMMC requirements (ranging from non-applicable to Level 2) will be defined in individual order solicitations. Primes are solely responsible for subcontractor compliance. 4. SUBCONTRACTING LIMITS AND THE NON-MANUFACTURER RULE (NMR) Limitations on Subcontracting (FAR 52.219-14): Primes must perform at least 50% of the cost of manufacturing (excluding materials) for supply orders. Non-Manufacturer Rule (FAR 52.219-33): Non-manufacturers must supply the product of a domestic small business manufacturer, unless an SBA class or individual waiver applies. The KO will monitor compliance at the order level. 5. DELIVERY PROTOCOLS Multiple Sites: Specific details will be addressed in the delivery order. 6. ANNUAL REVIEWS AND ON/OFF RAMPING The Government reserves the unilateral right to "on-ramp" (add) or "off-ramp" (remove) contractors from the BOA pool at any time based on annual review findings, performance, compliance (CMMC), or market changes. SECTION J � LIST OF ATTACHMENTS Attachment 001: REV 1 Purchase Description Attachment 002: Offeror Points of Contact (POCs) Template Attachment 003: Provisions and Clauses SECTION L � INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS 1. GENERAL PROPOSAL INSTRUCTIONS Review Attachment 001 � REV 1 Purchase Description for insight into requirement details. Proposals must include sufficient information to demonstrate the offeror's understanding of each evaluated area. The Government intends to execute BOAs to responsible offerors with compliant proposals rated "Acceptable" for Technical. Cost/Price will not be evaluated at this stage. The Government intends to execute BOAs based on initial proposals without negotiations; initial proposals should contain complete information. The Government is not obligated to request missing data. It reserves the right to negotiate if in its best interest, but only with offerors whose proposals do not contain significant informational deficiencies. NOTICE: The source selection procedures

Who won similar work

5 award notices on SAM.gov in the last 24 months. Match: Same office, same NAICS 331110.

WinnerAwardsValueLast
INDUSTRIAL METAL SALES LLC2$136KMar 17, 2026
T & T MATERIALS INC1$69KJun 10, 2025
CONSTRUCTORS INTERNATIONAL INCORPORATED1$35KOct 22, 2025
SUPER ROCO STEEL & TUBE, LTD.1$28KFeb 5, 2025

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.

Latest awards

Competitive landscape

For the 4 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
  • 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 32 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.