J035--Emergency Generators_ATS- Service Contract- Base plus 4 Option Years (VA-26-00057615)

Veterans Affairs · 241-NETWORK CONTRACT OFFICE 01 (36C241)

Stage
Open solicitation
NAICS
811310
Value
Not stated
Solicitation
36C24126Q0410
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
PSC
J035
Place
Manchester, NH, USA
Contact
Shawn Lawrence (Shawn.Lawrence@va.gov)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 36C24126Q0410 in this department, oldest first.

Early notice
None posted
Solicitation
  • Apr 16, 2026
    Combined Synopsis/Solicitation
    Open
  • Apr 16, 2026
    Combined Synopsis/Solicitation
    Open
  • Jun 2, 2026
    Combined Synopsis/Solicitation
    Open
  • Jun 2, 2026
    Combined Synopsis/Solicitation
    Open
  • Aug 10, 2026
    Combined Synopsis/Solicitation
    Open
  • Aug 10, 2026 · this notice
    Combined Synopsis/Solicitation
Award
  • Sep 23, 2026
    Award Notice
    DIVERSIFIED SITE SERVICES LLC · $412K
    Open

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

Solicitation No. 36C24126Q0410 Emergency Generators & ATS Service Contract. RFIs: Could you please provide the amperage size of each Automatic Transfer Switch (ATS)? Varies 100A through 1200A Please confirm whether each ATS is bypass or non-bypass type. We understand that upon PO issuance, the catalog number and serial number� will be required for each ATS; however, any preliminary information available would be very helpful for pricing purposes. Serial numbers and unit identification are posted in the appendix at the bottom of the SOW Could you please provide the applicable rate schedule for … (show all)

Prevailing Wage, or confirm which wage determination should be used for this project? Wage Determination 2015-4019 has been added to this solicitation. Fuel System- Check for leaks and drain water separator (if equipped). Keep fuel tank full. Check fuel filter indicator (if equipped). WE DO NOT PERFORM FUELING OPERATIONS. WE CAN ANNOTATE FUEL LEVELS BUT THE CUSTOMER IS USUALLY RESPONSIBLE TO FUEL THE GENERATORS. Fueling is not the responsibility of the contractor SEMI ANNUAL CHECKS ENGINE NOT RUNNING - Inspect unit for corrosion. Remove any corrosion, prime and paint. SHOULD WE ACCOUNT FOR COSTS IN THE PM, or WOULD THIS BE AN IDNETIFY AND PROVIDE QUOTE SITUATION? THIS WOULD BE AN IDENTIFY AND PROVIDE QUOTE SITUATION ANNUAL CHECK (ENGINE STOPPED AFTER RUNNING)-Hoses and Clamps- Inspect/Replace. SHOULD WE PLAN ON HOSE REPLACEMENTS AS PART OF THE PM? THIS WOULD BE AN IDENTIFY AND PROVIDE QUOTE SITUATION OUT OF YEAR CHECKS Inspect Turbocharger: Change all gasket and seals. ARE WE ACCOUNTING FOR RE-GASKETING / SEALING OF THE TURBOS AS PART OF THE PM? YES Replace Batteries & Replace temperature regulators: ARE WE ACCOUNTING FOR (2) BATTERIES PER GENERATOR AND THERMOSTAT REPLACEMENT AS PART OF THE PM? YES AUTOMATIC TRANSWER SWITCHES - Open and close contacts several times to verify they are working properly. ARE WE GOING TO BE ABLE TO CYCLE THE ATS DURING NORMAL BUSINESS HOURS, OR WILL THIS NEED TO BE A SEPARATE VISIT BASED ON FACILITIES ABILITY TO TRANSFER LOAD? This will be required off of business hours. Facility business hours are Monday Friday 6:00am to 6:00pm Under 3.1 of the contract, it says, "Contractor must be qualified and authorized to work on all equipment listed in Attachment A and must have access to all necessary proprietary software." We do not have access to CAT ET, and CAT will not give us access because we are a competitor. Does that disqualify us from the bid? Contractor is required to do all work required as part of the preventative maintenance and testing of the equipment per the Scope of Work. Under 7. Out Year Checks, it says to change all gaskets and seals in the turbocharger, replace the batteries, and replace the temperature regulators with seals. Since this contract runs� from September 1, 2026,� through August 31, 2027, do we need to include these in the bid pricing? The contract is a one year fixed 4 year option contract. Pricing should be included in the option years. Under 3.4 Item 4, it says, "The contractor shall supply parts and materials ($1000 per equipment) as needed for necessary upgrades, replacement, and repairs." Does this mean we have the green light to perform $1000 worth of repairs without approval and bill separately, or do� we need to work the $1000 into our bid?� Contractor shall carry an allowance of $1000 per piece of equipment listed in the appendix. This funding shall be utilized to do work not stated in the contract. For example where RFI s have been answered that state CONTRACTOR TO IDENTIFY AND PROVIDE QUOTE SITUATION

Who won similar work

6 award notices on SAM.gov in the last 24 months. Matched by: Same office (241-NETWORK CONTRACT OFFICE 01 (36C241)), same NAICS 811310.

Single-winner award sizes (6): middle half $214K to $577K, median $417K; range $33K to $694K.

WinnerAwardsValueLast
NBT CONSTRUCTION AND SUPPLY, LLC1$694KSep 28, 2026
Trane U.S. Inc.1$616KMay 5, 2026
STERIS CORPORATION · $STE · $6.0B1$458KMar 3, 2025
AMERICAN DEFENSE INDUSTRIAL, LLC1$376KAug 19, 2026
CALDAIA CONTROLS LLC1$159KMar 4, 2025
Apex Abatement and Demolition LLC1$33KMay 21, 2025

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.

Investor context
  • $STE reported $6.0B revenue (12 months to Jun 30, 2026). The median single-winner award in these 6 past awards, $417K, is under 0.1% of that. SEC filing

One award's total value against one year of revenue; many awards are paid over several years.

Latest awards

Materiality: one award's value as a share of the winner's revenue over the latest 12 months in its SEC filings (or its last fiscal year, as noted when you point at it). Low under 1%, Medium 1 to 5%, High 5% or more. Many awards are paid over several years, so this overstates a single year's share.

Competitive landscape

For the 6 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
  • 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
  • $17K from their corporate PACs since 2024 to members of House Committee on Appropriations, House Committee on Veterans' Affairs, Senate Committee on Appropriations, Senate Committee on Veterans' Affairs
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 25 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 1 of the past winners are listed companies
  • 0 insider buys and 1 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.