Combined Synopsis/SolicitationPosted Sep 30, 2026·Responses due Oct 7, 2026

52000QR260028760- CGC Vigilant Refrigeration Plant Inspection and Repair

Coast Guard · SFLC PROCUREMENT BRANCH 1(00080)

Stage
Open solicitation
NAICS
336611
Value
Not stated
Solicitation
52000QR260028760
Set-aside
Small Business Set Aside - Total
PSC
J041
Place
Cape Canaveral, FL, USA
Contact
Karla P. Balint (karla.p.balint@uscg.mil)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 52000QR260028760 in this department, oldest first.

Early notice
None posted
Solicitation
  • Sep 18, 2026
    Combined Synopsis/Solicitation
    Open
  • Sep 30, 2026 · this notice
    Combined Synopsis/Solicitation
Award
Not yet. Typical award: Oct 8, 2026 to Nov 21, 2026, middle of the range Oct 23, 2026.
Measured from 19 past solicitations at Us Coast Guard with NAICS 336611 that later posted an award (middle half of cases, counted from Sep 18, 2026).

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

Solicitation Amendment #1 The purpose of this amendment is to incorporate and distribute the Government's responses to questions submitted by interested parties regarding the solicitation requirements, correct administrative discrepancies, remove the FAR Clause Matrix attachment, and extend the solicitation closing window. This ensures all potential offerors have access to the same clarifying information prior to submitting their proposals. The Government has: Provided responses to vendor Questions (Q&A) Clarified the best-value evaluation factors under simplified acquisition procedures. Corre… (show all)

cted the ship�s physical address and clarified drawing/spec access requirement. Extended the solicitation closing window. To ensure all offerors have a clear understanding of the technical and administrative requirements, the Government is providing the following responses to questions received during the open solicitation period: Question 1: Sections 3.2.6.1 and 3.2.6.2 require inspecting receivers, accumulators, oil separators, filter-driers, refrigeration piping, strainers, and all crossover/isolation valves, and replacing components "as required based on inspection findings" or where there is "significant degradation" � with no quantities given and no known condition data provided. Since this scope can only be determined after the plant is opened up post-award, please clarify which pricing mechanism the Government intends for this element: (a) these items are priced and authorized as a contract modification once a CFR is submitted and approved after award, (b) offerors should include a fixed allowance in the total FFP price to cover this contingent scope, or (c) some other structure. We are able to provide a firm unit price for each affected component (e.g., per crossover/isolation valve replaced, per filter-drier replaced), but cannot provide an extended price for these items without the Government furnishing a quantity, whether firm or estimated. Because these replacements are conditional ("if necessary" / "if not available in military stock"), they cannot be definitively priced into a firm-fixed-price baseline without assuming a 100% failure rate. By requiring a CFR for each subparagraph of 3.2.5 and 3.2.6, the SOW anticipates that the contractor will inspect, document whether the military stock system can supply the parts, and use the CFR process to authorize contractor procurement if stock is unavailable. Government Response 1: These items are conditional and will be determined post-award based on the contractor's inspection findings. The contractor shall inspect, document whether the military stock system can supply the parts, and use the Condition Found Report (CFR) process to document the findings. If military stock is unavailable, contractor procurement of these parts will be authorized and priced post-award via a contract modification once the CFR is submitted and officially approved by the Contracting Officer. Question 2: The same question applies to Section 3.2.5.2 (TXV replacement "if necessary") and Section 3.2.6.1 ("provide necessary replacement parts... if not available in military stock system") � please clarify whether these are priced up front or handled post-award via CFR/modification. Because these replacements are conditional ("if necessary" / "if not available in military stock"), they cannot be definitively priced into a firm-fixed-price baseline without assuming a 100% failure rate. By requiring a CFR for each subparagraph of 3.2.5 and 3.2.6, the SOW anticipates that the contractor will inspect, document whether the military stock system can supply the parts, and use the CFR process to authorize contractor procurement if stock is unavailable. Government Response 2: These replacements are conditional. As stated in Government Response 1, the contractor will inspect and document part availability via the CFR process. If military stock is unavailable to support the requirement, contractor procurement of the necessary parts will be handled and priced post-award via a CFR-driven contract modification. Question 3: Given the severity of contamination described in the Section 3.2.4 note (thick metallic sludge and debris clogging the oil separators and filter drier housings), the condition of the systems is the primary variable in pricing the flushing and piping repair scope. Please provide all available documentation of the current condition of the NR1 and NR2 systems, including but not limited to inspection reports, casualty reports (CASREPs), photographs of the opened components, maintenance or repair history, and any oil or debris analyses. Of particular importance is any information establishing the extent of debris migration beyond the oil separators and filter drier housings into the piping runs, condensers, evaporators, receivers, and accumulators. If no such documentation exists, please confirm that in writing so that offerors may price this element on a common basis. Without either condition documentation or a Government-furnished quantity estimate for the Section 3.2.6 inspection-driven work, offerors are left to price the same requirement against materially different assumptions, which we expect would produce a wide and non-comparable spread of quotes. Government Response 3: The known discrepancy report (DISCREP) and available system photos are attached to this amendment package. A pre-quote site visit is highly recommended for all interested offerors to verify current conditions. Question 4: Coast Guard Drawings 618-WMEC 516-004 (Rev B) and 618-WMEC 516-006 (Rev A) are referenced as guidance in Section 3.2 but were not included in the RFQ package. Can these be provided prior to quote submission? Government Response 4: Yes. Please provide your firm's Joint Certification Program (JCP) number to the Contracting Officer in order for the Government to authorize and release these restricted technical drawings. Question 5: SFLC Std Spec 0000, 0740, and 5000 are referenced (Sections 2, 3.1.1, 3.1.2) but not included. Can these be provided prior to quote submission? Government Response 5: Yes. Please provide your firm's Joint Certification Program (JCP) number to the Contracting Officer to request the release of these standard specification documents. Question 6: NSTM 516 is noted as available "upon request" � we are requesting it. Can it be provided with enough lead time before the October 1 due date? Government Response 6: Yes. Please provide your firm�s JCP number to the Contracting Officer so we may verify eligibility and release this document. Question 7: Section 3.2.7.1 requires restoring insulation to removed interferences and applying it to all condensing piping. Given the age of the vessel, has an asbestos or other hazardous-material survey been performed on the existing insulation, and if hazardous material is present, which party is responsible for abatement? Government Response 7: The Coast Guard has already removed all legacy insulation material containing asbestos from these areas. There is no remaining insulation with asbestos exposure risk onboard Coast Guard Cutters for this scope of work. Question 8: Sections 3.2.5, 3.2.6, and 3.3 each require the contractor to submit a "CFR." We are interpreting this to mean a Condition Found Report, consistent with standard Navy/Coast Guard ship-repair practice, but the SOW does not define the acronym. Please confirm this interpretation is correct, specify the required format, and clarify the Government's expected review/approval turnaround time. Government Response 8: Your interpretation is correct. "CFR" stands for Condition Found Report. The standard CFR template is attached to this amendment. The Government's expected review and approval turnaround time is 3 to 5 business days upon receipt of a completed CFR. Question 9: Section 1.2 lists GFP for only four item types (compressor, condenser, chill box evaporator, freeze box evaporator). Section 3.2.3 lists additional components to

Who won similar work

107 award notices on SAM.gov in the last 24 months. Matched by: Same office (SFLC PROCUREMENT BRANCH 1(00080)), same NAICS 336611.

Single-winner award sizes (107): middle half $487K to $1.4M, median $947K; range $10K to $6.6M.

WinnerAwardsValueLast
JANCO ENTERPRISES INC11$10.3MSep 14, 2026
NORTH POINT MARINE & INDUSTRIAL INC11$5.7MSep 14, 2026
PHOENIX MARINE LLC9$8.6MAug 10, 2026
JAG INDUSTRIAL SERVICES, INC9$7.6MJun 11, 2026
PLATYPUS MARINE INC8$9.0MSep 24, 2026
THOMA-SEA MARINE CONSTRUCTORS, L.L.C.7$10.5MSep 24, 2026
J. Goodison Company7$8.2MSep 21, 2026
Colonna's Ship Yard, Incorporated4$11.5MMay 15, 2026
BAY SHIP & YACHT CO Alameda CA 94501 USA4$10.7MJun 26, 2026
ST. JOHNS BOAT COMPANY3$3.2MMar 25, 2026

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.

Latest awards

Competitive landscape

For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied U.S. Coast Guard (USCG) since 2024 (0 filings)
  • 0 of their lobbyists list a past U.S. Coast Guard (USCG) job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 433 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.