Progressive Design Build (PDB) - Cyber Maintenance Hangar Modernization
Army Corps of Engineers · W072 ENDIST LOUISVILLE
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation W912QR-PDB-MANSFIELD-OH in this department, oldest first.
- Aug 27, 2026 · this noticeSources Sought
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE Cyber Maintenance Hangar Modernization � Mansfield, OH Notice: This is a Request for Information (RFI) for market research and informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitt… (show all)
ing a response will not affect a firm�s ability to submit a proposal should a formal solicitation be issued in the future. NAICS Code: 236220 � Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million 1. PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE) Louisville District plans to issue a solicitation for either the new construction of an ICD-705 compliant endo-skeleton structure within an existing hangar OR new ICD-705 compliant prefabricated panelized facility to house Cyber Warfare Operations within an existing hangar. The project will provide cyber operations space within the existing bay. The awardee will construct all spaces to the appropriate security levels, install communications room to accommodate servers and equipment, provide all supporting electrical, mechanical, security, life safety, fire alarm and sprinkler systems, and communications supporting infrastructure, and provide emergency power systems and standby generator connection. High-Security Spaces (ICD 705): Renovation and construction of Special Access Program (SAP) spaces and Secure Compartmentalized Information Facilities (SCIFs) built to stringent ICD 705 standards along with potential deconstruction of existing Hangar Door to achieve and maintain ICD-705 compliant perimeter. Estimated Acquisition Magnitude: $50,000,000 (Phase 2) Funding Source: Operations & Maintenance (O&M) 2. PLANNED ACQUISITION STRATEGY The Government is considering utilizing an Other Transaction (OT) Agreement for a prototype project under the authority of 10 U.S.C. � 2808a. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies or delivery methodologies to achieve benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. The baseline delivery method under consideration is Progressive Design-Build (PDB). Phase 1 (Design & Pre-Construction): The Government and the OT Awardee will work collaboratively to advance the design, perform constructability reviews, conduct open-book cost estimating, and mitigate project risks. Phase 2 (Construction): Upon reaching an agreed-upon level of design (e.g., 60% to 90%), the Awardee will propose a Guaranteed Maximum Price (GMP). If accepted, the Government will exercise Phase 2 for construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the design and construct the facility via alternative methods. Alternative Under Consideration: The Government is also evaluating a Construction Manager at Risk (CMAR) delivery method under the OTA framework, particularly in scenarios where the Government-appointed Architect-Engineer (A-E) / Designer of Record (DOR) is pre-selected and dictated to the constructor. 3. INFORMATION REQUESTED Section 1: Company Profile Firm Name, Address, and Point of Contact (Name, Title, Phone, Email). Unique Entity ID (UEI). Socioeconomic Status (Other than Small, Small, 8(a), SDVOSB, WOSB, HUBZone, etc.). Section 2: Other Transaction Authority (OTA) & Statutory Compliance Innovative Technologies & Practices: 10 U.S.C. � 2808a focuses on prototyping with emergent construction technologies or innovative processes. Describe any innovative materials, sustainable building technologies, or modern construction processes (e.g., prefabrication, modular MEP systems, etc.) your firm could utilize to accelerate the schedule, reduce costs, and increase the building's life expectancy. Please provide a brief (no more than 1 page) description of your general approach to and the cost/pricing implications of the following: 1) new construction of an endo skeleton structure within an existing hangar to house Cyber Warfare Operations; and 2) providing new ICD-705 compliant �prefabricated trailers� to house Cyber Warfare Operations within an existing hangar. The information you provide regarding these various approaches will help the Government determine an appropriate path forward to successful execution of the project within funding limitations. OTA Experience: Describe your firm�s experience (if any) executing projects under an Other Transaction Agreement (OTA). Overcoming Traditional Barriers: What commercial or Government-imposed barriers (e.g., traditional FAR-based procurement limitations) make it difficult to implement innovative methods on complex military renovations? How can the flexibility of an OTA help overcome these barriers? Section 3: Progressive Design-Build (PDB) / Early Contractor Involvement Information Baseline: What minimum level of detail (e.g., DD Form 1391, conceptual design, spatial programming documents) does your firm require prior to entering Phase 1 (Design & Pre-construction) to feel confident in the project's baseline viability and target budget? Collaborative Framework: What collaborative mechanisms (such as joint design charrettes, target-value design workshops, or phased scoping approvals) do you recommend the Government implement in the first 30-90 days of Phase 1 to rapidly transition from a planning document to an agreed-upon technical baseline? Open-Book Pricing: Describe your experience with and internal processes involved in "open-book" pricing and transparency during pre-construction. How will you assure the Government that subcontractor and material pricing represent fair market value? Section 4: DESIGN PARTNER (A-E/DOR) TEAMING & DELIVERY METHOD ALTERNATIVES The Government is seeking targeted feedback on the structuring of design teams and alternative delivery methods (PDB vs. CMAR) for this complex headquarters renovation. Dictated A-E / Designer of Record (DOR): If the Government dictates the A-E firm / DOR for this project (e.g., a pre-selected firm already familiar with the facility's design/planning documents), rather than allowing your firm to team with an A-E of your own choosing, would your firm still be interested in bidding as the Prime Contractor? Please explain your reasoning. What major risks, operational friction, or coordination challenges do you foresee with a government-dictated A-E model? How would your firm mitigate those risks? PDB vs. CMAR Strategy: If the A-E/DOR is dictated by the Government, does this change your perspective on the viability of the Progressive Design-Build (PDB) w/ OTA strategy? Would a Construction Manager at Risk (CMAR) w/ OTA strategy be a better, more appropriate fit for this project if the designer is pre-selected? Please contrast the advantages and disadvantages of PDB vs. CMAR under a government-dictated design team structure. Section 5: Guaranteed Maximum Price (GMP), Risk Allocation & Compensation Off-Ramp Risk & Design Rights: If the Government and the contractor cannot reach an agreement on the Guaranteed Maximum Price (GMP), and the decision is made to �off ramp�, what specific compensation structures (e.g., design fees, stipends, time-and-materials) would adequately compensate your firm for Phase 1 efforts? Who should retain ownership of the design deliverables in this scenario? GMP Lock-In Milestone: In yo
Who won similar work
46 award notices on SAM.gov in the last 24 months. Match: Same office, same NAICS 236220.
| Winner | Awards | Value | Last |
|---|---|---|---|
| Howard W. Pence, Inc. | 4 | $30.4M | Sep 30, 2026 |
| Butt Construction Company | 4 | $23.9M | Sep 24, 2025 |
| BENAKA, INC. | 2 | $42.8M | Jan 15, 2026 |
| Gideon Contracting, Limited | 2 | $12.7M | Sep 18, 2025 |
| T & T CONSTRUCTION ENTERPRISES, LLC | 2 | $502K | Oct 1, 2026 |
| Harper Construction Company | 1 | $134.4M | Sep 18, 2025 |
| MESSER CONSTRUCTION CO Cincinnati OH 45203 USA | 1 | $82.5M | Sep 21, 2026 |
| J. E. DUNN CONSTRUCTION COMPANY | 1 | $54.8M | Sep 19, 2025 |
| BL HARBERT INTERNATIONAL LLC | 1 | $46.0M | Nov 19, 2025 |
| COX CONSTRUCTION CO Vista CA 92081 USA | 1 | $36.6M | Mar 19, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Oct 1, 2026T & T CONSTRUCTION ENTERPRISES, LLC$233KNolin River Lake Tailwater Restroom Construction
- Sep 30, 2026Howard W. Pence, Inc.$13.5MFTC CDC Renovate B3069
- Sep 29, 2026T & T CONSTRUCTION ENTERPRISES, LLC$269KBaileys Point A-Area Shower House Rehab and Remodel
- Sep 28, 2026L.S. BLACK CONSTRUCTORS, LLC$28.2MRepair AMSA/ECS- Arden Hills Army Reserve Center, Minnesota
- Sep 22, 2026GRANITE CONSTRUCTION COMPANY$10.9MSolicitation for Homestead ARB BAK 12/14 Aircraft Arresting System
- Sep 21, 2026Bristol Group, LLC$35.4MAward Notice - W912QR26CA037; Construction of Small Arms Ammunition Magazine, Blue Grass Army Depot
- Sep 21, 2026MESSER CONSTRUCTION CO Cincinnati OH 45203 USA$82.5MNotice of Award - W912QR26CA035; DBB Construction of USDA FAPRU in Lexington, KY
- Sep 17, 20269-12 LLC$10.4MVIRTUALIZED ELECTROMAGNETIC WARFARE AND MISSION ENGINEERING CENTER (VEWMEC)
- Sep 11, 2026J & J Contractors, Inc.$33.1MDesign-Bid-Build Construction of a Collective Enlisted Training Barracks at Devens Reserve Forces Training Area (DRFTA), MA
- Aug 27, 2026KREMPP CONSTRUCTION INC$9.8MUnmanned Fusion Warfare Laboratory at NSWC Crane IN
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.