Z1DA--Correct Martinez and Mare Island Generator Fuel Lines
Veterans Affairs · 261-NETWORK CONTRACT OFFICE 21 (36C261)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C26126R0048 in this department, oldest first.
- Aug 28, 2026Award NoticeBEXAR-ADVANCED SOLUTIONS GROUP, LLC · $3.2MOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
Amendment 0005 - The prupose of this amendment is to remove Clauses 52.232-5, 52.249-2, 52.249-10 from the solicitation and clauses 52.212-4, 52.246.21, and VA Specific Special Contract Clause, Payments under Fixed-Price Construction Contracts. Amendment 0004 - The prupose of this amendment is to extend the proposal due date. Amendment 0003 - The prupose of this amendment is to extend the proposal due date. Amendment 0002 - The purpose of this amendment is to provide the RFI responses. Amendment 0001 - The purpose of this amendment is to provide the sign-in sheet from the Site Visit held on We… (show all)
dnesday, May 27th, 2026 and to extend the submission date for the Receipt of Offers to Wednesday, June 24th, 2026, at 12:00 PM PT. VA Northern California Health Care System April 17, 2026 STATEMENT OF WORK Correct Martinez and Mare Island Generator Fuel Lines 612 24 005 General Information This Statement of Work covers the furnishing of labor, material, supervision and necessary engineering for upgrading the Martinez and Mare Island Generator Fuel Lines and delivery systems. Martinez Location - VA Martinez Medical Center 150 Muir Rd. Martinez, CA 94553 Mare Island Location - VA Clinic 201 Walnut Avenue, Building 201 Mare Island, CA 94592-1107 Contractor shall completely prepare sites for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the replacement of fuel oil piping at both the Martinez and Mare Island VA Medical center campuses as required by drawings and specifications. The Martinez campus fuel oil piping replacement shall occur for fuel oil piping at buildings 19 and 20. The required work located at building 19 of the Martinez campus shall include but is not limited to the following: Fuel oil piping replacement (including excavation, backfill and site restoration for existing underground piping replacement) Seismic restraint of aboveground piping and equipment, Traffic control during trenching operations near parking lot at Building 19 Fuel oil transfer pump replacement Replacement of the leak detection system (including re-use of existing leak detection as noted) Integration of new fuel management system with existing facility building automation system Implementation of ICRA requirements Replacement of valving, pipe supports controls, and associated electrical wiring Commissioning of new systems as required by drawings and specifications The required work located at building 20 of the Martinez campus shall include but is not limited to the following: Fuel oil piping replacement (including excavation, backfill and site restoration for underground piping replacement). Incidental architectural work involving removal and replacement of existing indoor ceilings for piping replacement). Seismic restraint of aboveground piping and equipment, pump replacement, replacement of the leak detection system (including re-use of existing leak detection sensors and wiring as noted). Integration of new fuel management system with existing facility building automation system. Implementation of ICRA requirements. The addition of a fuel polisher into the fuel oil system. Commissioning of all of the new systems. The replacement of valving, pipe supports, controls, commissioning of new systems, and associated electrical wiring as required by drawings and specifications. The required work located at building 201 on the Mare Island campus shall include but is not limited to the following: Replacement of fuel oil piping. Fuel oil transfer pumps. Seismic restraint of aboveground piping and equipment Replacement of the leak detection systems (including re-use of existing leak detection sensors and wiring as noted) Integration of new fuel management system with existing facility building automation system, valving, pipe supports, controls, commissioning of new systems and associated electrical wiring as required by drawings and specifications Contractor will be responsible for returning any damaged landscape/hardscape/roads/curbs to its existing conditions prior to the closing out of the project. Background: The purpose of this project is to upgrade the generator fuel lines and delivery systems at both the Martinez and Mare Island campuses. This includes the following areas: Martinez campus Building 19 fuel delivery system, Martinez campus Building 20 fuel delivery system, and Building 201 Mare Island campus fuel line replacement. Scope of Work A site visit and/or survey is highly recommended for all bidders prior to submitting a bid for project 612-24-005. Complete work as detailed in the attached Specifications and Drawings for project. Project Specifications include requirements for all products, materials, equipment, installation methods, testing and verification of systems shown on the construction Drawings. Contractor is advised to review all contract documents (Specifications, Drawings, Narrative, etc.) carefully. Upon issuance of the NTP for Construction, it will be the expectation of VA that the Contractor knows the contract requirements in detail. If there are any discrepancies between the Specifications and Drawings, the Contractor shall bring that to the attention of the Contracting Officer immediately. Hierarchy of VA provided documentation is (1) Specifications; (2) Drawings; (3) Project Narrative. All notes on the Drawings are in place to support the Specifications of the project and assist the General Contractor in build out of the intended design. Project Specifications shall be strictly adhered to. Upon project award, General Contractor is affirming that they have read and understand the project Specifications. 1. Notice to Proceed for Construction shall be issued to the Contractor no more than 90 days from the date of award. Once NTP is issued, Contractor shall obtain VA approval on all submittals prior to breaking ground for construction work. Submitted project schedule shall show expected submittal period. General Contractor shall note that it will generally take 14 days for an AE submittal review, followed by an additional 14 to 21 days for VA to review and approve submittals, depending on the content. Below is a summary of the work that will be required in this project: (For detailed instructions and guidance, Contractor is to reference the project Specifications and Drawings) Martinez Campus Building 19 work summary: Required work to remediate existing shortcomings: Remove and replace appropriate portions of the fuel leak detection system related to replacement equipment ensure leak detection system is tied into existing building management system (BMS) system. Ensure pump controls are integrated with existing BMS system and day tank/fuel tank level controls to remain. Excavate and replace underground fuel piping. Remove and replace pump assembly and controller for 6,000-gallon fuel tank. Remove sump basin and leak detection float switch. Remove capped piping which previously lead to a boiler. Ensure all materials and fuel are properly disposed of as required. Provided replacement fuel piping shall be double wall containment with line leak detection. Remove and replace above grade fuel piping. Remove and replace all systems valving, ensuring a fully operational system is installed. Martinez Campus Building 20 work summary: Required work to remediate existing shortcomings: Remove and replace appropriate portions of the fuel leak detection system related to replacement equipment ensure leak detection system is tied into existing BMS system. Ensure pump controls are integrated with existing BMS system and day tank/fuel tank level controls to remain. Excavate and replace underground fuel piping. Remove and replace pump assembly and controller for 6,000-gallon fuel tank. Remove and replace the leak detection system. Dispose of all materials and waste fuel in accordance with all VA, local, state, and federal guidelines. Provided replacement fuel piping shall be double wall containm
Who won similar work
18 award notices on SAM.gov in the last 24 months. Matched by: Same office (261-NETWORK CONTRACT OFFICE 21 (36C261)), same product/service code (PSC) Z1DA and NAICS 236220.
Single-winner award sizes (18): middle half $276K to $2.3M, median $726K; range $7K to $19.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| OVERWATCH AMOROSO LLC | 2 | $22.2M | Apr 17, 2026 |
| V. LOPEZ JR. & SONS GENERAL ENGINEERING CONTRACTORS, INC | 2 | $14.3M | Aug 28, 2026 |
| BEXAR-ADVANCED SOLUTIONS GROUP, LLC | 2 | $566K | Aug 11, 2025 |
| FEDVET CONSTRUCTION TEMECULA 92590 | 1 | $4.3M | Sep 12, 2025 |
| ROCK CONSTRUCTION MANAGEMENT LLC | 1 | $1.9M | Apr 17, 2026 |
| HAWK CONTRACTING GROUP LLC | 1 | $1.6M | Nov 20, 2024 |
| UTILITY SYSTEMS SOLUTIONS, INC. | 1 | $901K | Jul 16, 2026 |
| PHILLIPS C&C LLC | 1 | $821K | Jul 24, 2025 |
| SAPPER WEST, INC. | 1 | $630K | May 13, 2026 |
| NEIL HONOLULU 96819 | 1 | $495K | Mar 27, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Aug 28, 2026V. LOPEZ JR. & SONS GENERAL ENGINEERING CONTRACTORS, INC$2.4MZ1DA--FY26 NRM | 570-23-223 | Renovate Building 1, First Floor for Acute Respiratory Clinic
- Aug 13, 2026MOONLITE CONSTRUCTION ONTARIO 91761$113KZ1DA--Install ID Concrete Pad Project 593-26-104 VAMC Las Vegas, NV
- Jul 16, 2026UTILITY SYSTEMS SOLUTIONS, INC.$901KZ1DA--640-26-900 | Replace Air Handling Unit, Bldg. 7, PAD
- May 13, 2026SAPPER WEST, INC.$630KZ1DA-- Award Notice | DB Construction | Project No. 570-26-611 Install Tieback Roof Anchors, Building 1 - Fresno
- Apr 17, 2026OVERWATCH AMOROSO LLC$3.2MZ1DA--NRM - 640-23-102 | Microbiology Lab Renovation
- Apr 17, 2026ROCK CONSTRUCTION MANAGEMENT LLC$1.9MZ1DA--Replace Equipment in Mechanical Rooms | 593-23-306 | RFP 36C26126R0010
- Apr 14, 2026OVERWATCH AMOROSO LLC$19.0MZ1DA--Renovate OR for Hybrid Installation 612A4-25-004
- Apr 10, 2026AVIATE ENTERPRISES, INC.$475KZ1DA--Replace Martinez DI system to RO Equipment Emergency
- Mar 27, 2026NEIL HONOLULU 96819$495KZ1DA--CFA Fuel Tank Replacement 459-25-002 VAPIHCS
- Sep 12, 2025FEDVET CONSTRUCTION TEMECULA 92590$4.3MZ1DA--Replace Roof Bldg. 1 LV | 593-24-302 | 36C261-25-AP-2849
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.