Combined Synopsis/SolicitationPosted Aug 4, 2026·Original deadline passed (Sep 8). See latest amendment for current deadline.

PREVENTIVE MAINTENANCE SERVICE CONTRACT FOR STANDBY DIESEL GENERATORS

State · EMBASSY CONAKRY

Stage
Open solicitation
NAICS
8113
Value
Not stated
Solicitation
19GV1026Q0015
Set-aside
None stated
PSC
R425
Place
CONAKRY, GN-C, GIN
Contact
MARAH FAMA (MarahF@state.gov)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 19GV1026Q0015 in this department, oldest first.

Early notice
None posted
Solicitation
  • Jul 31, 2026
    Combined Synopsis/Solicitation
    Open
  • Aug 4, 2026 · this notice
    Combined Synopsis/Solicitation
Award
Not yet. Expected award: Any day (median passed). Typical range Sep 6, 2026 to Nov 9, 2026; middle Sep 30, 2026.
Measured from 147 past solicitations at State, Department of that later posted an award (middle half of cases, counted from Jul 31, 2026).
Responses are due Sep 8, 2026, so an award before then is unlikely; past cases include short solicitations.

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

Attachment A Performance Work Statement (PWS) STATEMENT OF WORK D5090 - LOW VOLTAGE STANDBY DIESEL GENERATOR PLANNED MAINTENANCE AND INSPECTION SERVICES Table of Contents GENERAL INFORMATION PROJECT REQUIREMENTS DESCRIPTION OF EQUIPMENT GENERAL REQUIREMENTS SCOPE OF WORK - GENERATOR PLANNED MAINTENANCE AND INSPECTION OPTION 1 - LOAD BANK PLANNED MAINTENANCE AND INSPECTION OPTION 2 - AUTOMATIC TRANSFER SWITCH PLANNED MAINTENANCE AND INSPECTION OPTION 3 - DAY TANK PLANNED MAINTENANCE AND INSPECTION DELIVERABLES APPLICABLE PUBLICATIONS 1. GENERAL INFORMATION The United States Embassy in Conakry r… (show all)

equires professional services and contractor cost proposals to perform Planned Maintenance and Inspection services of the facility's Low Voltage Diesel Standby Generator systems. 1.1 CONTRACT SCOPE AND LIMITATIONS A. Standby Service - Standard Application This contract is designed for diesel standby generators in emergency/standby service. The standard maintenance schedule assumes: Infrequent operation (emergency use and regular testing only) Typical annual operating hours are less than 200 hours Calendar-based maintenance intervals (two visits per year) B. Prime Power and High-Utilization Applications While the maintenance tasks in this SOW are applicable to prime power and continuous duty operations, the service visit frequency and scheduling must be modified for these applications. Posts operating generators in the following modes must notify the Contracting Officer prior to solicitation to adjust service intervals and pricing: Prime power or continuous duty operations Peak shaving or co-generation systems High-frequency operation (>200 hours annually) Extended run-time operations For these applications: Maintenance intervals shall follow manufacturer's hour-based schedules rather than calendar-based Service visit frequency shall be increased (typically quarterly or more frequently) Additional monitoring and testing requirements may apply Pricing structure must account for increased service frequency and consumables usage C. Service Visit Frequency - Standby Service For standard standby service, this contract provides TWO (2) scheduled maintenance visits per year: One (1) Semi-Annual service (every 6 months �30 days) One (1) Annual service (every 12 months �30 days) Additional visits, major repairs, or component replacements require separate purchase orders. D. Hour-Based Maintenance Triggers Certain manufacturer-required maintenance is triggered by operating hours regardless of calendar intervals (e.g., valve lash adjustment, oil changes, major services). The Contractor shall: Record operating hours at each service visit Notify the COR when generators approach hour-based maintenance intervals Follow the more frequent calendar-based or hour-based schedules per manufacturer�s recommendations Perform hour-based maintenance at the next scheduled visit if within acceptable range, or coordinate additional service if immediate attention is required 2. PROJECT REQUIREMENTS The Contractor shall perform planned maintenance and inspections as described in this Statement of Work (SOW). The intent of this SOW is to ensure the entire standby generator systems for this facility are maintained according to manufacturer's recommendations and to ensure the readiness and proper operation of the system. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform professional Planned Maintenance and Inspection services for the facility's Low Voltage Diesel Standby Generator systems as defined in this Statement of Work. Objectives: Ensure all standby generator systems are maintained according to Original Equipment Manufacturer (OEM) recommendations Ensure readiness and proper operation of generator systems for emergency power supply Maintain compliance with NFPA standards for generator installation and grounding Prevent equipment failure through regular planned maintenance Extend equipment service life through proper maintenance practices 3. DESCRIPTION OF EQUIPMENT The equipment to be maintained includes: Diesel Standby Generators (See equipment list in attachment) OPTION 1: Load Banks OPTION 2: Automatic Transfer Switches OPTION 3: Day Tanks 4. GENERAL REQUIREMENTS The Contractor shall provide the labor and materials required to carry out regularly planned maintenance and inspections as outlined in this SOW. NOTE: The intent is for the Contractor to supply labor, fluids, filters and items that can be anticipated on a schedule such as coolants and batteries. Repairs or replacement parts should be separately priced. There should be a plan and oversight to avoid unnecessary maintenance/charges or not replacing items such as hoses when necessary. A. Materials and Supplies The Contractor shall inventory, supply and replace maintenance service items (e.g., filters and fluids). Only fluids and parts which meet or exceed manufacturer's specifications shall be used. All fluids shall be delivered in original sealed containers. Contractor shall supply the parts required in performance of maintenance included in this SOW (e.g., rocker cover gaskets when performing valve lash, thermostats when performing coolant change). B. Expendable and Common Parts The Contractor shall maintain a supply of expendable and common parts so that these are readily available for normal maintenance to include: hoses, belts, oil, chemicals, coolant, filters, generator starting batteries, grease, sealant, thermostats, fuses; in addition to the appropriate tools, testing equipment, safety shoes and apparel for technicians, personal protective equipment (hands, hearing, eye protection), MSDS, cleaning material and oil spill containment kits. C. Exclusions This contract does NOT include repair of equipment and replacement of hardware (e.g., bearings, pistons, piston rings, crankshaft, gears, injectors) except as indicated in the maintenance schedules and equipment list. Hardware replacements will be separately priced out by the Contractor for the Government's approval and acceptance. The Government has the option to accept or reject the Contractor's quote for parts and reserves the right to obtain similar spare parts from other competitive sources. If required by the Government, the Contractor shall utilize Government-purchased spare parts, if awarded the work. Such repairs/replacements will be accomplished by a separate purchase order. However, this exclusion does not apply if the repair is to correct damage caused by Contractor negligence. Replacement/repair of any electronic or electrical parts must be approved by the COR prior to installation of the part. If the Contractor proceeds to replace any electronic or electrical parts without COR approval, the Contractor shall de-install the parts at no cost to the Government. D. Checklist Approval The Contractor shall submit to the COR a schedule and description of planned maintenance tasks which the Contractor plans to provide. The Contractor shall prepare this schedule and task description in a checklist format for the COR's approval prior to contract work commencement. E. Manufacturer's Recommended Maintenance It is the responsibility of the Contractor to perform all manufacturers recommended planned maintenance as well as planned maintenance recommended by the manufacturer technical manuals for standby operations of the respective equipment. This does not include major maintenance, planned overhauls, or injector replacements. F. Personnel, Tools, Consumable Materials and Supplies The Contractor shall provide trained technicians with the appropriate tools and testing equipment for scheduled maintenance, safety inspection, and safety testing as required by this Contract. The Contractor shall provide all of the necessary materials and supplies to maintain, service, inspect and test all the systems to be maintained. G. Safety & Special Instru

Who won similar work

3 award notices on SAM.gov in the last 24 months. Matched by: Same agency (State), same industry group (NAICS 8113).

Single-winner award sizes (3): middle half $129K to $283K, median $133K; range $125K to $434K.

WinnerAwardsValueLast
PACIFIC PLACE SERVICES LLC1$434KOct 25, 2024
ENERGOSYSTEMY-LUDZHER KOMPANII Z OBMEZHENOYU VIDPOVIDALNISTYU LUDZHER, DP Kyiv 04050 UKR1$133KAug 18, 2025
FLUID SOLUTIONS LLC1$125KOct 5, 2026

Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.

Latest awards

Competitive landscape

For the 3 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied State, Dept of (DOS) since 2024 (0 filings)
  • 0 of their lobbyists list a past State, Dept of (DOS) job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 33 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.