Combined Synopsis/SolicitationPosted Mar 25, 2026·Responses due Mar 13, 2026

H142--Fire Protections System ITM

Veterans Affairs · 242-NETWORK CONTRACT OFFICE 02 (36C242)

Stage
Open solicitation
NAICS
238220
Value
Not stated
Solicitation
36C24226Q0339
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
PSC
H142
Place
Lyons, NJ, USA
Contact
Yasmin Moses (Yasmin.Moses@va.gov)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 36C24226Q0339 in this department, oldest first.

Early notice
  • Feb 10, 2026
    Sources Sought
    Open
Solicitation
  • Mar 25, 2026 · this notice
    Combined Synopsis/Solicitation
  • Mar 25, 2026
    Combined Synopsis/Solicitation
    Open
  • Mar 27, 2026
    Combined Synopsis/Solicitation
    Open
  • Mar 27, 2026
    Combined Synopsis/Solicitation
    Open
  • Mar 31, 2026
    Combined Synopsis/Solicitation
    Open
Award
  • May 12, 2026
    Award Notice
    HurtVet Subcontracting, Inc. · $434K
    Open

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

Description This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Revolutionary FAR Overhaul (RFO) in Federal Acquisition Regulation (FAR) subpart 12.202, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as an RFQ. The solicitation do… (show all)

cument and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-06. This solicitation is set aside for SDVOSBs. The associated North American Industrial Classification System (NAICS) code for this procurement is 238220, with a small business size standard of $19.0 million. The FSC/PSC is H142. The New Jersey Healthcare System at Lyons Campus (151 Knollcroft Road Lyons, New Jersey 07939) has a requirement for quarterly, semi-annual and annual inspections, testing, and maintenance for their fire protection systems. These systems include portable fire extinguishers, monitored fire alarm system components (water flow switches, tamper switches, etc.) , kitchen hood suppression systems, and fire sprinkler systems to include fire pumps and backflow preventers. All interested companies shall provide quotations for the following: Supplies/Services Line Item Description Quantity Unit of Measure Unit Price Total Price BASE PERIOD- April 13, 2026 April 12, 2027 0001 Annual ITM on Fire Extinguishers 349 YR 0002 Annual Inspection on Fire Hydrants 40 EA 0003 Annual Flow Test on Fire Pumps 2 EA 0004 Annual Inspections on Sprinkler Backflow Preventers 10 EA 0005 Annual Recycling and Replacement of Extinguishers 50 EA 0006 Quarterly Main Drain Testing at all Backflow Preventer Locations 1 YR 0007 Semi-Annual Inspection of 25 Wet and Dry Sprinkler Systems 2 JB 0008 Semi-Annual Inspection of 1 Anti-Freeze Sprinkler System 2 JB 0009 Semi-Annual Testing of Kitchen Hood Suppression Systems 1 YR NSP Price SLINs Below 0009AA Semi-Annual Testing of Ansul Kitchen Hood Suppression Systems (Current Quantity 4, Quantity may change during the life of the contract) 2 JB 0009AB Semi-Annual Testing of Kidde Kitchen Hood Suppression Systems (Current Quantity 7- Quantity may change during the life of the contract) 2 JB 0009AC Semi-Annual Testing of Buckeye system Kitchen Hood Suppression Systems (Current Quantity 1- Quantity may change during the life of the contract) 2 JB 0009AD Semi-Annual Testing of Denlar system Kitchen Hood Suppression Systems (Current Quantity 1- Quantity may change during the life of the contract) 2 JB 0010 Semi-Annual Inspection of 197 Tamer Switches 2 JB 0011 Semi-Annual Inspection of 124 Waterflow Switches 2 JB 0012 Replace Expired Sprinkler Heads (not to exceed quantity listed) 500 EA 0013 Labor Rate for Repairs (see SOW, section F5) 1 HR 0014 Provide Parts/Material 1 LT Refer to FAR 52.212-1 0015 Fire Hydrants, Five Year Full Flow Testing IAW NFPA 291 40 EA OPTION 1 - April 13, 2027 April 12, 2028 1001 Annual ITM on Fire Extinguishers 349 YR 1002 Annual Inspection on Fire Hydrants 40 EA 1003 Annual Flow Test on Fire Pumps 2 EA 1004 Annual Inspections on Sprinkler Backflow Preventers 10 EA 1005 Annual Recycling and Replacement of Extinguishers 50 EA 1006 Quarterly Main Drain Testing at all Backflow Preventer Locations 1 YR 1007 Semi-Annual Inspection of 25 Wet and Dry Sprinkler Systems 2 JB 1008 Semi-Annual Inspection of 1 Anti-Freeze Sprinkler System 2 JB 1009 Semi-Annual Testing of Kitchen Hood Suppression Systems 1 YR NSP Price SLINs Below 1009AA Semi-Annual Testing of Ansul Kitchen Hood Suppression Systems (Current Quantity 4, Quantity may change during the life of the contract) 2 JB 1009AB Semi-Annual Testing of Kidde Kitchen Hood Suppression Systems (Current Quantity 7- Quantity may change during the life of the contract) 2 JB 1009AC Semi-Annual Testing of Buckeye system Kitchen Hood Suppression Systems (Current Quantity 1- Quantity may change during the life of the contract) 2 JB 1009AD Semi-Annual Testing of Denlar system Kitchen Hood Suppression Systems (Current Quantity 1- Quantity may change during the life of the contract) 2 JB 1010 Semi-Annual Inspection of 197 Tamer Switches 2 JB 1011 Semi-Annual Inspection of 124 Waterflow Switches 2 JB 1012 Replace Expired Sprinkler Heads (not to exceed quantity listed) 500 EA 1013 Labor Rate for Repairs (see SOW, section F5) 1 HR 1014 Provide Parts/Material 1 LT Refer to FAR 52.212-1 1015 Fire Hydrants, Five Year Full Flow Testing IAW NFPA 291 40 EA OPTION 2- April 13, 2028 April 12, 2029 2001 Annual ITM on Fire Extinguishers 349 YR 2002 Annual Inspection on Fire Hydrants 40 EA 2003 Annual Flow Test on Fire Pumps 2 EA 2004 Annual Inspections on Sprinkler Backflow Preventers 10 EA 2005 Annual Recycling and Replacement of Extinguishers 50 EA 2006 Quarterly Main Drain Testing at all Backflow Preventer Locations 1 YR 2007 Semi-Annual Inspection of 25 Wet and Dry Sprinkler Systems 2 JB 2008 Semi-Annual Inspection of 1 Anti-Freeze Sprinkler System 2 JB 2009 Semi-Annual Testing of Kitchen Hood Suppression Systems 1 YR NSP Price SLINs Below 2009AA Semi-Annual Testing of Ansul Kitchen Hood Suppression Systems (Current Quantity 4, Quantity may change during the life of the contract) 2 JB 2009AB Semi-Annual Testing of Kidde Kitchen Hood Suppression Systems (Current Quantity 7- Quantity may change during the life of the contract) 2 JB 2009AC Semi-Annual Testing of Buckeye system Kitchen Hood Suppression Systems (Current Quantity 1- Quantity may change during the life of the contract) 2 JB 2009AD Semi-Annual Testing of Denlar system Kitchen Hood Suppression Systems (Current Quantity 1- Quantity may change during the life of the contract) 2 JB 2010 Semi-Annual Inspection of 197 Tamer Switches 2 JB 2011 Semi-Annual Inspection of 124 Waterflow Switches 2 JB 2012 Replace Expired Sprinkler Heads (not to exceed quantity listed) 500 EA 2013 Service Labor Rate for Repairs (see SOW, section F5) 1 HR 2014 Provide Parts/Material 1 LT Refer to FAR 52.212-1 2015 Fire Hydrants, Five Year Full Flow Testing IAW NFPA 291 40 EA OPTION 3- April 13, 2029 April 12, 2030 3001 Annual ITM on Fire Extinguishers 349 YR 3002 Annual Inspection on Fire Hydrants 40 EA 3003 Annual Flow Test on Fire Pumps 2 EA 3004 Annual Inspections on Sprinkler Backflow Preventers 10 EA 3005 Annual Recycling and Replacement of Extinguishers 50 EA 3006 Quarterly Main Drain Testing at all Backflow Preventer Locations 1 YR 3007 Semi-Annual Inspection of 25 Wet and Dry Sprinkler Systems 2 JB 3008 Semi-Annual Inspection of 1 Anti-Freeze Sprinkler System 2 JB 3009 Semi-Annual Testing of Kitchen Hood Suppression Systems 1 YR NSP Price SLINs Below 3009AA Semi-Annual Testing of Ansul Kitchen Hood Suppression Systems (Current Quantity 4, Quantity may change during the life of the contract) 2 JB 3009AB Semi-Annual Testing of Kidde Kitchen Hood Suppression Systems (Current Quantity 7- Quantity may change during the life of the contract) 2 JB 3009AC Semi-Annual Testing of Buckeye system Kitchen Hood Suppression Systems (Current Quantity 1- Quantity may change during the life of the contract) 2 JB 3009AD Semi-Annual Testing of Denlar system Kitchen Hood Suppression Systems (Current Quantity 1- Quantity may change during the life of the contract) 2 JB 3010 Semi-Annual Inspection of 197 Tamer Switches 2 JB 3011 Semi-Annual Inspection of 124 Waterflow Switches 2 JB 3012 Replace Expired Sprinkler Heads (not to exceed quantity listed) 500 EA 3013 Labor Rate for Repairs (see SOW, section F5) 1 HR 3014 Provide Parts/Material 1 LT Refer to FAR 52.212-1 3015 Fire Hydrants, Five Year Full Flow Testing IAW NFPA 291 40 EA OPTION 4 - April 13, 2030 April 12, 2031 4001 Annual ITM on Fire Extinguishers 349 YR 4002 Annual Inspection on Fire Hydrants 40 EA 4003 A

Who won similar work

19 award notices on SAM.gov in the last 24 months. Matched by: Same office (242-NETWORK CONTRACT OFFICE 02 (36C242)), same NAICS 238220.

Single-winner award sizes (19): middle half $594K to $3.3M, median $1.1M; range $361K to $51.9M.

WinnerAwardsValueLast
MICHAEL KOST BRONX 104543$2.7MJun 24, 2026
WELCH CONSTRUCTION INC.2$8.0MFeb 17, 2026
AEONRG LLC1$51.9MMay 14, 2026
T.C.I. CONSTRUCTION & MANAGEMENT CO., INC.1$7.9MSep 3, 2025
VETERANS CONTRACTING GROUP, INC.1$6.3MMar 2, 2026
J & J MECHANICAL AND CONSTRUCTION GROUP LLC1$3.4MFeb 11, 2026
TACTICAL CONSTRUCTION, INC1$3.3MMay 22, 2026
TROY BOILER WORKS, INC1$1.6MSep 29, 2026
MARTIN ENERGY GROUP SERVICES LLC1$1.1MJun 17, 2025
TRUHEAT LLC1$1.1MSep 29, 2025

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.

Latest awards

Competitive landscape

For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
  • 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 25 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.