Sources Sought/Market Intelligence Notice: Selfridge KC-46 Dual Bay Hangar Complex � Use of Construction Management at Risk using Other Transaction Authority (OTA)
Army Corps of Engineers · W072 ENDIST LOUISVILLE
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation W912QR-CMRISK-SELFRIDGE in this department, oldest first.
- Sep 9, 2026Sources SoughtOpen
- Sep 9, 2026 · this noticeSources Sought
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm�s ability to … (show all)
submit a proposal should formal solicitation be issued in the future. NAICS Code: 236220 � Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Louisville District, has a requirement for the design and construction of Dual Bay (Fuel Cell and General Maintenance) Hangar for the KC-46 Pegasus aircraft at Selfridge ANG, MI. The scope of work consists of furnishing all necessary equipment, materials, labor, supervision, quality control, and supplies to deliver a fully functional maintenance hangar including required shops as indicated below: General Purpose Shop Corrosion Control Shop Fuel Cell Shop: Weapons System Maintenance Engine Shop Avionics Shop Non-Destructive Inspection (NDI) Estimated Acquisition Magnitude: $188,700,000 PLANNED ACQUISITION STRATEGIES UNDER EVALUATION: Construction Management at Risk (CM@Risk) via Other Transaction Authority (OTA). The Louisville District is evaluating a Construction Management at Risk (CM@Risk) strategy utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. � 2808a. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. Currently, the Government has advanced the design to 35% and has the capability to progress to a full design. Therefore, the Government is utilizing this RFI to assess industry capability, interest, and the advantages of utilizing Construction Management at Risk (CM@Risk) utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. � 2808a. The CM@Risk Course of Action (10 U.S.C. � 2808a): This path allows USACE to execute a construction project where the design is brought at near 65% completion. Phase 1 Preconstruction: The builder is hired during Phase 1 to act as an expert consultant, helping the Designer of Record (DOR) push the design from 65% to 100% using real-time market data and MII (MCACES 2nd Generation) cost comparisons. Phase 2 Construction: Once the design hits 100% and the MII estimate validates the open-book pricing, the agreement transitions to Phase 2, where the builder goes "At-Risk" to construct the facility under a Guaranteed Maximum Price (GMP). The DOR retains design liability, but the contractor drives constructability and assumes responsibility for layout, schedule, and trade coordination. The CM@Risk Pricing Structure: Preconstruction Services Fee: A small, fixed-price or time-and-materials amount paid to the contractor strictly to fund their time spent helping the Architect Engineer (A/E) finalize the 65% design into a 100% design. The Target Fee: The contractor�s transparent profit margin for managing the actual construction, bid competitively upfront. The GMP: The absolute ceiling for the construction phase (Validated Direct Costs + Target Fee + Shared Contingency). PHASED EXECUTION PLAN Phase 1: Preconstruction Services Agreement (CM@Risk Advisory) Solicitation (White Papers): The Solicitation would likely include the 35% design. The Deliverable is anticipated to be a concise 5-10 page White Paper. Evaluation Criteria will likely include Corporate capability and experience with collaborative project delivery methods ( including CM@Risk, Progressive Design-Build (PDB) and/or Design-Build to Budget (DBtB)) under an OT framework; preconstruction approach (how the firm plans to collaborate with the Government's A/E to close the remaining 65% design gap, identify value-engineering opportunities, and mitigate supply-chain risks); proposed Target Fee (for construction) and Preconstruction Services Fee. The Pitch Meeting (Oral Presentations): A 90-minute pitch where the contractor must bring their Project Manager, Site Superintendent, and their Preconstruction Manager. The Government team assesses how well the contractor's team will integrate with the A/E during the critical final design push. The OT is initially awarded and funded only for the Preconstruction Services Fee. Design Finalization (Bridging the 35% Gap): The contractor�s Preconstruction team sits with the Government and the DOR. Because the design is not locked, they can actively change it. They perform value engineering, finalize equipment selections, and ensure the drawings are 100% constructible. Open Book Pricing vs. MII: As the design reaches 100%, the contractor conducts open-book market outreach. The Government and contractor review actual sub-bids together. USACE cost estimators finalize the Independent Government Estimate (IGE) using the MII software to validate costs and establish the GMP base. Phase 2: Construction Execution Agreement (Going "At-Risk") Execution: The Agreements Officer (AO) executes a bilateral modification to the OT Agreement, incorporating the GMP and funding the physical construction. Risk Allocation: Under CM@Risk, the contractor is now "At-Risk." While the DOR retains design liability, the contractor collaborates to identify constructability conflicts during Phase 1. During Phase 2, while the DOR still owns fundamental engineering failures, the contractor loses the ability to claim "defective design" for constructability issues, material delays, or coordination errors, because they were explicitly paid to help finalize those exact decisions using market and MII data during Phase 1. INFORMATION REQUESTED Interested parties are requested to respond to the following questions to help shape the final acquisition strategy: Company Profile: Q1. Firm Name Q2. Address Q3. Point of Contact (Name, Title) Q4. Phone Number Q5. Email Address Q6. Unique Entity ID Q7. CAGE code Q8. Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.) Q9. Participating Role (Prime Contractor, Subcontractor, Design Firm, Other) Other Transaction Authority (OTA) & Statutory Compliance: Q10. Innovative Technologies: The authority for this OTA (10 U.S.C. � 2808a) is focused on prototyping with new or emergent construction technologies. Describe any innovative materials, methods, or technologies your firm could propose for a project of this scale that could lead to cost savings, schedule acceleration, or enhanced facility performance and resilience. Q11. OTA Experience: Describe your firm's previous experience (if any) executing prototype projects under an OTA. Q12. Barriers to Innovation: What commercial or Government-imposed barriers currently make it difficult to propose or implement innovative construction technologies on traditional military construction projects? How could the flexibility of an OTA help overcome these barriers? Q13. Custom Commercial Terms & Dispute Resolution: To optimize the flexibilities of the Other Transaction Authority (OTA) framework, what specific commercial terms (e.g., tailored dispute resolution/rapid escalation mechanisms, commercial milestone payment structures, or shared intellectual property rights for innovative methods) would your firm recommend the Government adopt
Who won similar work
46 award notices on SAM.gov in the last 24 months. Matched by: Same office (W072 ENDIST LOUISVILLE), same NAICS 236220.
Single-winner award sizes (46): middle half $6.6M to $22.1M, median $13.0M; range $95K to $134.4M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| Howard W. Pence, Inc. | 4 | $30.4M | Sep 30, 2026 |
| Butt Construction Company | 4 | $23.9M | Sep 24, 2025 |
| BENAKA, INC. | 2 | $42.8M | Jan 15, 2026 |
| Gideon Contracting, Limited | 2 | $12.7M | Sep 18, 2025 |
| T & T CONSTRUCTION ENTERPRISES, LLC | 2 | $502K | Oct 1, 2026 |
| Harper Construction Company | 1 | $134.4M | Sep 18, 2025 |
| MESSER CONSTRUCTION CO Cincinnati OH 45203 USA | 1 | $82.5M | Sep 21, 2026 |
| J. E. DUNN CONSTRUCTION COMPANY | 1 | $54.8M | Sep 19, 2025 |
| BL HARBERT INTERNATIONAL LLC | 1 | $46.0M | Nov 19, 2025 |
| COX CONSTRUCTION CO Vista CA 92081 USA | 1 | $36.6M | Mar 19, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Oct 1, 2026T & T CONSTRUCTION ENTERPRISES, LLC$233KNolin River Lake Tailwater Restroom Construction
- Sep 30, 2026Howard W. Pence, Inc.$13.5MFTC CDC Renovate B3069
- Sep 29, 2026T & T CONSTRUCTION ENTERPRISES, LLC$269KBaileys Point A-Area Shower House Rehab and Remodel
- Sep 28, 2026L.S. BLACK CONSTRUCTORS, LLC$28.2MRepair AMSA/ECS- Arden Hills Army Reserve Center, Minnesota
- Sep 22, 2026GRANITE CONSTRUCTION COMPANY$10.9MSolicitation for Homestead ARB BAK 12/14 Aircraft Arresting System
- Sep 21, 2026Bristol Group, LLC$35.4MAward Notice - W912QR26CA037; Construction of Small Arms Ammunition Magazine, Blue Grass Army Depot
- Sep 21, 2026MESSER CONSTRUCTION CO Cincinnati OH 45203 USA$82.5MNotice of Award - W912QR26CA035; DBB Construction of USDA FAPRU in Lexington, KY
- Sep 17, 20269-12 LLC$10.4MVIRTUALIZED ELECTROMAGNETIC WARFARE AND MISSION ENGINEERING CENTER (VEWMEC)
- Sep 11, 2026J & J Contractors, Inc.$33.1MDesign-Bid-Build Construction of a Collective Enlisted Training Barracks at Devens Reserve Forces Training Area (DRFTA), MA
- Aug 27, 2026KREMPP CONSTRUCTION INC$9.8MUnmanned Fusion Warfare Laboratory at NSWC Crane IN
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.