Sources Sought/Market Intelligence: Fort Carson Equipment Concentration Site - Potential Use of Progressive Design Build using Other Transaction Authority (OTA)
Army Corps of Engineers · W072 ENDIST LOUISVILLE
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation W912QR-PDB-FortCarsonECS in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE Notice: This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm�s abi… (show all)
lity to submit a proposal should a formal solicitation be issued in the future. NAICS Code: 236220 � Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Louisville District, has a requirement for the design and construction of an Equipment Concentration Site (ECS) complex of facilities on Fort Carson. The scope of work consists of furnishing all necessary equipment, materials, labor, supervision, quality control, and supplies to deliver a fully functional Area Maintenance Support Activity (AMSA) shop, General Purpose Warehouse (GPW), and Organizational Storage Building. Key features of the project may include: Vehicle maintenance shop required features including but not limited to concrete shop aprons, vehicle wash rack/platform, bi-level equipment loading ramps. Specialized Systems: special building foundations, extensive pavements, improved surfaces, and the related site clearing, and excavation costs associated with developing the 48-acre parcel of land. Administrative & Support: Adjoining maintenance shops, tool rooms, administrative offices, and personnel support spaces. Military Equipment Parking lot & Site Work: Construction of paving areas for heavy equipment, POVs, security fencing, and utility tie-ins. Estimated Acquisition Magnitude: $75,000,000.00 Planned Acquisition Strategy: Progressive Design-Build (PDB) via Other Transaction Authority (OTA) The Louisville District is conducting market intelligence to assess industry capability and interest in supporting this effort utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. � 2808a, Facility Construction or Repair: Transactions Other Than Contracts and Grants. This authority is distinct from the Department of Defense protptype OT authorities commonly associated with 10 U.S.C. � 4021 and 4022. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. The anticipated delivery method is Progressive Design-Build (PDB). Phase 1 (Design & Pre-Construction): The Government and the OT Awardee will work collaboratively to advance the design, perform constructability reviews, conduct open-book cost estimating, and mitigate project risks. Phase 2 (Construction): Upon reaching an agreed-upon level of design (e.g., 60% to 90%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise Phase 2 for construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the design and construct the facility via alternative methods. INFORMATION REQUESTED 1. Company Profile: Firm Name, Address, and Point of Contact (Name, Title). Phone Number, Email Address, and Unique Entity ID (UEI). Socioeconomic Status (Large, Small, 8(a), SDVOSB, etc.). 2. Other Transaction Authority (OTA) & Statutory Compliance: Innovative Technologies: The authority for this OTA (10 U.S.C. � 2808a) is focused pecifically designed to bring the fast-paced, iterative, and flexible principles of Other Transaction Authority (OTA), which traditionally governs research and technology prototyping, into the physical infrastructure and military construction (MILCON) domain. Describe any innovative materials, methods, or technologies your firm could propose for a project of this scale that could lead to cost savings, schedule acceleration, or enhanced facility performance and resilience. OTA Experience: Describe your firm's previous experience (if any) executing prototype projects under an OTA. Barriers to Innovation: What commercial or Government-imposed barriers currently make it difficult to propose or implement innovative construction technologies on traditional military construction projects? How could the flexibility of an OTA help overcome these barriers? What project characteristics make PDB-OTA particularly advantageous or disadvantageous for this requirement? 3. Progressive Design-Build (PDB) / Early Contractor Involvement: Baseline Definition: What minimum level of detail (e.g., Statement of Need, conceptual site plans, target budget) does your firm require prior to entering Phase 1 (Design/Pre-construction) to feel confident in the project's viability? Collaborative Framework: What collaborative mechanisms (such as joint design charrettes, target-value design workshops, or phased scoping approvals) do you recommend the Government implement in the first 30-90 days to rapidly transition from a "blank page" to a mutually agreed-upon baseline? Describe your experience executing Progressive Design-Build, Construction Manager at Risk (CMAR), or other highly collaborative delivery methods. How do you approach "open-book" pricing and transparency during Phase 1 (Pre-Construction) to build trust and ensure the Government is receiving fair market value? 4. Guaranteed Maximum Price (GMP), Risk Allocation & Compensation: Phase 1 Off-Ramp Risk: If the Government and the contractor cannot reach an agreement on the GMP or final design (the "off-ramp"), what specific compensation structures (e.g., stipends, time-and-materials for design effort) would adequately compensate your firm for pre-construction efforts? Payment Milestones: Because an OTA allows for flexible payment structures, what milestone payment arrangement during Phase 1 (e.g., monthly progress, completion of design percentages, deliverable-based) best supports your firm's cash flow and resource allocation? Data Rights: Under an OTA, data rights and intellectual property can be negotiated. What data rights structure for the final design deliverables (if an off-ramp is taken) would provide a fair balance between the Government's need to construct the facility and your firm's proprietary design methods? In your experience with PDB, at what design milestone (e.g., 35%, 65%, 90%) is it most advantageous to lock in the GMP for a complex aviation facility, and why? How do you handle the procurement of long-lead items (e.g., switchgear, specialized fire pumps, large span steel) prior to establishing the final GMP? What level of cost growth would you typically expect between conceptual planning and GMP establishment? 5. Industrial Maintenance & Storage Facility Construction Expertise: Describe your specific experience with large-scale heavy tactical maintenance facilities, specialized systems like tactical vehicle wash platforms, and highly specialized fire suppression systems. What are the greatest supply chain, scheduling, or technical risks you foresee for a project of this type at Fort Carson, and how would the PDB delivery method help mitigate them? Are there specific trades, materials, equipment, or subcontractor resources in the Fort Carson/Colorado Springs market that are currently constrained? Would early contractor involvement through Progressive Design-Build materially improve the Government�s ability to manage these ma
Who won similar work
46 award notices on SAM.gov in the last 24 months. Matched by: Same office (W072 ENDIST LOUISVILLE), same NAICS 236220.
Single-winner award sizes (46): middle half $6.6M to $22.1M, median $13.0M; range $95K to $134.4M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| Howard W. Pence, Inc. | 4 | $30.4M | Sep 30, 2026 |
| Butt Construction Company | 4 | $23.9M | Sep 24, 2025 |
| BENAKA, INC. | 2 | $42.8M | Jan 15, 2026 |
| Gideon Contracting, Limited | 2 | $12.7M | Sep 18, 2025 |
| T & T CONSTRUCTION ENTERPRISES, LLC | 2 | $502K | Oct 1, 2026 |
| Harper Construction Company | 1 | $134.4M | Sep 18, 2025 |
| MESSER CONSTRUCTION CO Cincinnati OH 45203 USA | 1 | $82.5M | Sep 21, 2026 |
| J. E. DUNN CONSTRUCTION COMPANY | 1 | $54.8M | Sep 19, 2025 |
| BL HARBERT INTERNATIONAL LLC | 1 | $46.0M | Nov 19, 2025 |
| COX CONSTRUCTION CO Vista CA 92081 USA | 1 | $36.6M | Mar 19, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Oct 1, 2026T & T CONSTRUCTION ENTERPRISES, LLC$233KNolin River Lake Tailwater Restroom Construction
- Sep 30, 2026Howard W. Pence, Inc.$13.5MFTC CDC Renovate B3069
- Sep 29, 2026T & T CONSTRUCTION ENTERPRISES, LLC$269KBaileys Point A-Area Shower House Rehab and Remodel
- Sep 28, 2026L.S. BLACK CONSTRUCTORS, LLC$28.2MRepair AMSA/ECS- Arden Hills Army Reserve Center, Minnesota
- Sep 22, 2026GRANITE CONSTRUCTION COMPANY$10.9MSolicitation for Homestead ARB BAK 12/14 Aircraft Arresting System
- Sep 21, 2026Bristol Group, LLC$35.4MAward Notice - W912QR26CA037; Construction of Small Arms Ammunition Magazine, Blue Grass Army Depot
- Sep 21, 2026MESSER CONSTRUCTION CO Cincinnati OH 45203 USA$82.5MNotice of Award - W912QR26CA035; DBB Construction of USDA FAPRU in Lexington, KY
- Sep 17, 20269-12 LLC$10.4MVIRTUALIZED ELECTROMAGNETIC WARFARE AND MISSION ENGINEERING CENTER (VEWMEC)
- Sep 11, 2026J & J Contractors, Inc.$33.1MDesign-Bid-Build Construction of a Collective Enlisted Training Barracks at Devens Reserve Forces Training Area (DRFTA), MA
- Aug 27, 2026KREMPP CONSTRUCTION INC$9.8MUnmanned Fusion Warfare Laboratory at NSWC Crane IN
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.