Y1JZ--558-23-155 Generator Exhaust Modification GC

Veterans Affairs · 246-NETWORK CONTRACTING OFFICE 6 (36C246)

Stage
Open solicitation
NAICS
238220
Value
Not stated
Solicitation
36C24626B0002
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
PSC
Y1JZ
Place
Durham, NC, USA
Contact
Elaine B Belber (Elaine.Belber@va.gov)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 36C24626B0002 in this department, oldest first.

Early notice
  • Oct 6, 2025
    Sources Sought
    Open
  • Oct 6, 2025
    Sources Sought
    Open
  • Oct 6, 2025
    Sources Sought
    Open
  • Oct 6, 2025
    Sources Sought
    Open
  • Nov 6, 2025
    Pre-solicitation
    Open
  • Nov 6, 2025
    Pre-solicitation
    Open
Solicitation
  • Nov 21, 2025
    Solicitation
    Open
  • Nov 21, 2025 · this notice
    Solicitation
  • Jan 13, 2026
    Solicitation
    Open
  • Jan 13, 2026
    Solicitation
    Open
  • Jan 13, 2026
    Solicitation
    Open
  • Jan 13, 2026
    Solicitation
    Open
  • Feb 10, 2026
    Solicitation
    Open
  • Feb 10, 2026
    Solicitation
    Open
Award
  • Mar 26, 2026
    Award Notice
    RILEY CONTRACTING GROUP, INC. · $1.2M
    Open

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

STATEMENT OF WORK Generator Exhaust Modifications Project Number: 558-23-155 Durham VA Healthcare System GENERAL INFORMATION: The General Contractor shall provide the construction services necessary to provide what is detailed in the Design Drawings and Specifications and all other related information for the Project. The Project corrects a deficiency in the exhaust system for the 3 diesel generators in Building 18, which is located within Building 1 of the facility. Work includes general construction and alterations for generator exhaust modifications, installation of new exhaust fans and all… (show all)

associated facade and roof repairs required to install the work. The intent of this project is to fix the deficiency below: Route the existing exhaust system for the 3 backup generators to a location away from other air handling unit intakes and building windows. PROJECT INFORMATION: Location of Work: This project location is in Building 18, which is within Building 1 of the Durham VA Medical Center, 508 Fulton Street, Durham, North Carolina 27705. Codes and Standards: This project will meet but is not limited to the following most recent codes and standards. All Federal and local codes including: NFPA 101, 92B, 92, 96, 72, 13, 241, and 90a National Electric Code (NEC) Life Safety Codes Other applicable codes VA Numbered Standards for Construction: PG-18-1 Master Construction Specifications PG-18-3 Design and Construction Procedures PG-18-4 Standard Details and CAD Standards PG-18-5 Equipment Guide List H-18-8 Seismic Design Handbook PG-18-9 Space Planning Criteria, and VA-Space & Equipment Planning System (VA-SEPS) PG-18-10 Design Manuals (by discipline) Architectural Asbestos Abatement Electrical HVAC systems Construction Services: Provide as captured in project specifications and as indicated below: Pre-Construction Meeting: Contractor shall participate in and facilitate a Pre-Con in conjunction with the Contracting Officer, COR, A&E, and building stakeholders as needed. Pre-Con shall be scheduled upon acceptance of necessary submittals by the COR and CO. Submittal and Request for Information (RFI) Review and Logs: Contractor shall provide an online submittal and RFI review and comment system at no additional cost to the VA. Submittal Exchange, ProCore, or a platform of similar functionality which allows submittal review by the A&E (first reviewer) and COR (second reviewer/approval), comment, and archiving is required. There shall be no additional cost for adding alternate VA reviewers upon request. VA review shall be no less than 21 working days. As-Built Drawing Submission: Provide Red-line drawings to A/E that include the contractor s mark-ups in PDF formats. Storage: No storage of any material will be allowed on VA property unless approved by the COR. All pay applications will be paid based on completed installations upon inspection and acceptance of work from the VA COR. If storage is not approved, Contractor must consider all cost associated with storage of materials offsite. Payment of materials stored offsite is not permitted. Period of Performance: Contractor shall complete this project no later than 270 days after issuance of the notice to proceed (NTP). Hours of Operation and Phasing: Construction should take place during normal working hours M-F 730am-4pm. Requests outside those normal working hours should be coordinated with the VA COR. Any work that requires utility outage (e.g., generator, electrical, controls, etc.) or interruption of services at the facility (e.g., use of parking lot) must be coordinated and scheduled with the VA COR 4-weeks in advance. Utility and System or Service Outages: No utility service such as water, gas, steam sewers or electricity, parking, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized in accordance with VA Lock-out Tag-out requirements. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director s prior knowledge and written approval. The contractor shall submit a request to interrupt any such services to COR, in writing, 4-weeks in advance of proposed interruption. Warranty: The Contractor agrees to supply parts which are warranted by the manufacturer to be free from defects in materials and workmanship for one year from the date of installation. In certain cases, parts may become obsolete and replacement parts can only be purchased through after-market suppliers that do not provide a year warranty. In certain cases, the Contractor will extend the same warranty to the Durham VA Medical Center as supplied by the after-market supplier to the contractor. Warranty shall be limited to the replacement of the part(s) found to be defective. Safety and Regulations: Contractor shall comply with Durham VA Safety and location specific Infection Control requirements. Contractor shall maintain control of all tools and parts. Contractor will meet all OSHA standards for Employee safety. The contractor shall be allotted one contractor parking passes for onsite parking. This work will require appropriate personal protective equipment and proper infection control measures. General Requirements The contractors employees shall not enter the work site without appropriate badges and identification. They may also be subject to inspection of their personal effects when entering or leaving the project site. Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied jointly by patients or medical personnel, and Contractor s personnel, except as permitted by COR where required by limited working space. Means of Egress: Do not block exits from occupied buildings, including paths from exits to roads per NFPA 101 and VA requirements. Minimize disruptions and coordinate with COR. All buildings will be occupied during performance of work. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the installation period. Competent, experienced, licensed or certified workers shall perform crafts requiring specialized skills. All work shall be performed in full accordance with applicable local and Federal regulations. All equipment and installation shall conform to all applicable requirements of ASHREA, National Fire Protection Association (NFPA), plumbing and mechanical codes, and National Electrical Code (NEC). No departures from specification requirements will be permitted without written approval. The contractor shall use good safety practices while working. All hardware shall be installed in such a manner to minimize damage and maximize patient and employee safety. All equipment and procedures shall conform to OSHA, NEMA, ABA and ANSI Standards and conform to the Standard Building Code and the Standard Mechanical Code. Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Coordinate with COR. Obtain permits from the facility Safety Manager at least 48 hours in advance. New work shall be installed and connected to existing work neatly, safely and professionally. Contractor to coordinate periodic VA inspection to ensure satisfactory workmanship of GC and Subcontractors. Any portion of the VAMC that is disturbed or damaged shal

Who won similar work

8 award notices on SAM.gov in the last 24 months. Matched by: Same office (246-NETWORK CONTRACTING OFFICE 6 (36C246)), same NAICS 238220.

Single-winner award sizes (8): middle half $384K to $2.0M, median $546K; range $38K to $7.2M.

WinnerAwardsValueLast
PHILLIPS C&C LLC1$7.2MJun 11, 2026
DRI, Inc1$5.9MSep 3, 2026
ACRO CONSTRUCTION, LLC1$678KMar 10, 2026
SCHAIBLE, MARK PELHAM 03076 NHB1$592KNov 6, 2025
MGI, INC.1$499KJun 24, 2026
EWA DIRECTION INC.1$408KDec 5, 2024
SCIPACT LLC1$311KApr 8, 2025
CALDAIA CONTROLS LLC1$38KJul 18, 2025

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.

Latest awards

Competitive landscape

For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
  • 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 25 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.