Z1DA--Repair Exterior Sidewalks 583-26-505
Veterans Affairs · 250-NETWORK CONTRACT OFFICE 10 (36C250)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C25026B0029 in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
STATEMENT OF WORK GENERAL SCOPE: The project involves sealing and striping the asphalt parking lots and replacing damaged sidewalks and ramps at the Richard L. Roudebush VA Medical Center (VAMC). All work will be performed at the Richard L. Roudebush VA Medical Center (VAMC), located at 1481 West 10th Street, Indianapolis, IN 46202. The Contractor shall complete all work within 90 days following Notice to Proceed. The concrete repair work shall be completed during normal hours and on the weekend. All parking lots and roadways should be fully operational during business hours. The Contractor sh… (show all)
all provide all necessary services (i.e., labor, materials, tools, equipment, and competent supervision) to perform all work as noted below to meet the scope objectives and requirements, and to provide the required outcome in terms of overall quality, timeliness, and documentation. The Contractor shall be responsible for obtaining and coordinating the services of all third-party subcontractors performing services on site as part of the contract to accomplish the following: Remove and replace concrete ramps, sidewalk, curbs, and detectable warning strips as shown on the drawings. All pedestrian ramps and sidewalks shall be VA compliant. https://www.cfm.va.gov/til/etc/dsBarrFree.pdf Prior to start of work, the Contractor is responsible for verifying existing conditions and maintaining current conditions of the VAMC during and following completion of the installation. Contractor shall mobilize equipment and materials without interfering with the normal flow of vehicles, pedestrian traffic, and medical center operations. It shall be the responsibility of the Contractor to keep the construction areas clean and the surrounding areas free from damage. If during work, surrounding areas are damaged, the Contractor will be responsible for any repairs/replacements that are required. It is the responsibility of the Contractor to understand and comply with all applicable city, county, state, and federal codes, laws, ordinances, standards, rules, and regulations. The contractor is responsible for materials storage until the materials are installed. The VA will not allow storage in the medical facility except for inside the construction area. The contractor shall notify the COR daily when their crew is on site working. WORK HOURS Maintaining the operational capability of the medical center is of paramount importance. The contractor shall coordinate all activities with VA COR. The concrete work can be completed during normal business hours, but weekend work will be necessary for certain areas. All after-hours work or weekend work shall be approved by the COR. Normal business hours for the medical center are defined as Monday through Friday, 0730 1630, excluding Saturday and Sunday. Designated off-shift hours are defined as 1630 0700, Monday through Friday, excluding federal holidays. The following construction activities shall be considered after-hours work. Work that is loud or disruptive that causes impacts to patients or patient care. Work that impacts employee and patient parking or traffic flow. HEALTH & SAFETY The Contractor shall be thoroughly familiar will all rules and regulations governing safety. A 30-hour OSHA Competent Person shall be present for all work and all additional workers shall have a minimum of a 10-hour OSHA Certification. All welders, pipefitters, carpenters, electricians, etc. performing work must present a valid certification for their respectable trade. The contractor shall ensure all OSHA requirements are followed specifically related to controlling silica dust. The contractor shall implement controls to eliminate dust. All work associated with this project shall be in compliance with all VA regulations concerning Safety, Infection Control Requirements, Interim Life Safety Measure Requirements, Parking, Personnel Access, and proper removal/safe disposal of construction waste and debris as listed in the specifications and drawings. The Contractor shall abide by all Infection Control Risk Assessment (ICRA) requirements that are put into place by the VA infections prevention team. The COR shall provide requirements and forms to Contractor. All work will be performed in accordance with ICRA, but it will still be the responsibility of the Contractor to keep the construction areas clean and to not damage the existing equipment. If during the work, equipment is damaged, the Contractor will be responsible for any repairs/replacements that are required. Starting October 1, 2019, the VAMC campus has become a Smoke-free zone. No smoking is allowed on the grounds of any VA-related health care facilities by patients, visitors, volunteers, contractors, vendors and employees. The new smoke-free policy applies to cigarettes, cigars, pipes, any other combustion of tobacco, and e-cigarettes, vape pens and e-cigars. A safety plan shall be approved by the VA before any work is started. Once the safety plan is submitted, a meeting will be setup with VA safety, the COR, and the Contractor to review and discuss the safety plan. Chemicals shall be properly stored and approved by the VA. The contractor shall provide all barricades, signage, and fencing required to protect and secure the construction site. The concrete related work shall require fencing, and signage during demolition and installation. The asphalt related work shall require signage, barricades or danger tape to keep people from entering the work area. REQUIREMENTS Contractor shall conduct a weekly progress meeting with the COR. The Contractor shall provide the COR with an updated two-week schedule, review submittals and RFIs with the COR, provide documentation for any outages or closures and discuss project progress. The Contractor shall provide the COR with a daily log of any work that was included that day. The daily log shall include who was on site, their trade, how many hours were worked and what work they were performing. The contractor will be authorized for 1 vehicle on-site. Additional space if needed will need to be at the Cold Spring Roads facility. A dumpster may be authorized onsite if required. A dumpster will be authorized if there is space on site available and if approved by the COR. The Contractor shall be responsible for all signage Wayfinding signage shall clearly indicate areas that are closed off to the public. Temporary means of egress, vehicle paths and parking signage shall be clear and abundant to ensure patients and employees are minimally impacted by the work. The contractor shall secure all materials, equipment, and tools before, during and after service. The government assumes no liability for loss or damage of contractor s owned property held on government premises. The contractor is responsible for the physical security of the job site, materials, tools, and equipment as well as daily inspections for organization and cleanliness prior to exiting the job site. The contractor shall secure all materials, equipment, and tools before, during and after service. The government assumes no liability for loss or damage of contractor s owned property held on government premises. The Contractor shall comply with all aspects of contract specifications and submit a Request for Information (RFI) for clarification or additional information if the project documents are not clear. All submittals shall be submitted to the COR and comply with the project specifications. The Contractor shall submit an ICRA plan, a safety plan, construction schedule, site logistic plan, submittals, OSHA certificates, traffic Control plan within 10 calendar days from the NTP. The plans shall be approved by the VA COR. Contractor shall submit a traffic control and phasing plan showing how patient and staff access will be maintained during each phase of work. The plan must be approved by the COR prior to mobilization The contractor shall make every effort to prevent the spread of dust, smoke, fumes, etc., throughout
Who won similar work
44 award notices on SAM.gov in the last 24 months. Matched by: Same office (250-NETWORK CONTRACT OFFICE 10 (36C250)), same product/service code (PSC) Z1DA.
Single-winner award sizes (44): middle half $175K to $2.7M, median $510K; range $18K to $30.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| CALVARY CONTRACTING INC | 6 | $5.3M | Jun 25, 2026 |
| ARMCORP CONSTRUCTION INC | 4 | $32.4M | Sep 16, 2026 |
| CAVU CONSULTING LLC | 3 | $10.0M | Sep 16, 2026 |
| JAB GENERAL CONTRACTOR LLC | 3 | $525K | Apr 4, 2025 |
| VETERANS CONTRACTING, INC. | 2 | $12.7M | Aug 14, 2026 |
| MGI, INC. | 2 | $10.4M | Sep 24, 2025 |
| AmeriTech Contracting LLC | 2 | $2.2M | Jan 7, 2025 |
| N-OVATION TECHNOLOGY GROUP LLC | 2 | $870K | Sep 10, 2026 |
| J & G SOLUTIONS LLC | 2 | $479K | Apr 3, 2026 |
| VETERAN BUILDERS CORP | 2 | $442K | Sep 9, 2026 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
- Oct 9, 2026DANIELS BUILDING CO INC$571KZ1DA--Replace Roofing B-1W 506-26-201No listed company matched (Materiality N/A)
- Oct 7, 2026ELEVEN BRAVO GROUP, LLC$38KRepair CARES Tower 6th Floor Cleveland VA Medical Center, Cleveland, OHNo listed company matched (Materiality N/A)
- Oct 6, 2026IONIC CONTRACTORS LLC$87KFire Suppression Survey at the Cleveland VA Medical CenterNo listed company matched (Materiality N/A)
- Sep 16, 2026ARMCORP CONSTRUCTION INC$30.0MZ1DA--Project No. 610A4-26-500 - Fort Wayne Job Order Contract (JOC).No listed company matched (Materiality N/A)
- Sep 16, 2026CAVU CONSULTING LLC$4.3MZ1DA--Upgrade Elevators 506-24-102No listed company matched (Materiality N/A)
- Sep 10, 2026N-OVATION TECHNOLOGY GROUP LLC$684KProject No. 552-26-202 - Replace Overhead Paging SystemNo listed company matched (Materiality N/A)
- Sep 9, 2026VETERAN BUILDERS CORP$83KConstruct Concrete Pads for HVAC Maintenance 610A4-26-506No listed company matched (Materiality N/A)
- Sep 9, 2026KOALA ROOFING LLC$385K655-26-201 Repaint Water TowerNo listed company matched (Materiality N/A)
- Aug 20, 2026VALIANT CONSTRUCTION LLC$30.0MZ1DA--Project No. 610-25-500 - Marion Job Order Contract (JOC)No listed company matched (Materiality N/A)
- Aug 14, 2026VETERANS CONTRACTING, INC.$9.0MZ1DA--Improve Sub-Basement Plumbing and Air Quality - 541-24-103No listed company matched (Materiality N/A)
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.