OK FW TSM 10(1) NFH Entrance Road and Parking Improvements
Federal Highway Administration · 6982AF CENTRAL FEDERAL LANDS DIVISI
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 6982AF27B000003 in this department, oldest first.
- Aug 24, 2026 · this noticePre-solicitation
- Oct 6, 2026SolicitationOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: OK FW TSM 10(1) PROJECT NAME: NFH Entrance Road and Parking Improvements PROJECT DESCRIPTION: The Tishomingo National Fish Hatchery (NFH) is in south-central Oklahoma off SH 7 on a 220-acre U.S. Fish and Wildlife Service (FWS) facility approximately 8 miles northwest of the Town of Tishomingo. The project will address deteriorated pavement for the entrance loop, adding a small parking area at the northeast corner of the entrance loop, and pavement of the entrance road and parki… (show all)
ng area south of HWY 7. The 3R project will provide new driving surface, entrance gates, culverts, Architectural Barriers Act (ABA) compliant parking spot, and ABA compliant curb ramp. SCOPE OF THE WORK: The project will consist of full depth reclamation of the existing roads asphalt to a depth of 6-in, paving 3-in of asphalt, super elevation correction, and culvert replacement. New parking areas will be constructed with new aggregate base and asphalt pavement. A concrete ABA compliant curb ramp and ABA compliant parking spot. Concrete aprons will be placed around existing structures to match existing. Two new gates at the entrances to the NFH will also be installed. Entrance roads and parking areas will be closed during construction. PRINCIPAL WORK ITEMS: 30402-5300 Full Depth Reclamation Method 2, 6-inch depth: 6,800 SQYD 40301-0100 Asphalt Concrete Pavement, 1,250 TON 20401-0000 Roadway Excavation, 400 CUYD ANTICIPATED SCHEDULE: Advertisement � September 2026 Award - November 2026 Construction � June 2027 through October 2027 ESTIMATED COST RANGE: Between $700,000 and $2,000,000
Who won similar work
43 award notices on SAM.gov in the last 24 months. Match: Same office, same NAICS 237310.
| Winner | Awards | Value | Last |
|---|---|---|---|
| YORKSHIRE INDUSTRIES LLC | 3 | $4.3M | Jul 22, 2026 |
| AMRIZE SOUTHWEST INC · $AMRZ | 2 | $93.0M | Jul 31, 2026 |
| STEVE MANNING CONSTRUCTION INC | 2 | $32.1M | Apr 23, 2026 |
| FDT WATER INFRASTRUCTURE, LLC | 2 | $16.7M | Mar 3, 2025 |
| PINE BLUFFS GRAVEL & EXCAVATING, INC. | 2 | $14.6M | Apr 22, 2026 |
| WHELCON CONTRACTORS LLC | 2 | $9.0M | Nov 3, 2025 |
| CONSTRUCTION SOLUTIONS GROUP, LLC | 2 | $8.3M | Dec 11, 2025 |
| C-A NATIVE CONSTRUCTORS INC | 2 | $4.6M | Feb 24, 2025 |
| BATTLE RIDGE BUILDERS, LLC | 2 | $1.7M | Aug 7, 2025 |
| MARTIN BROTHERS CONSTRUCTION Sacramento CA 95826 USA | 1 | $250.0M | Jan 20, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Aug 26, 2026Gideon Contracting, Limited$3.2MCO ERFO FS SNJUAN 2026-1(1) Fall Creek Road
- Aug 12, 2026HAWK CONTRACTING LLC$3.8MAZ NP GRCA 14(2) Roadway Improvements
- Jul 31, 2026AMRIZE SOUTHWEST INC$66.5MCA NP MOJA 11(2) 10(2) KELBAKER, KELSO-CIMA, CIMA and MORNING STAR MINE ROADS
- Jul 28, 2026AMRIZE SOUTHWEST INC$26.5MNV FLAP NYE 10(1) Bob Ruud Mem Hwy & Bell Vista Ave
- Jul 22, 2026PRECISION GRADING LLC$1.0MSD FLAP SDGFP PARKING(1) North Point Parking Lot
- Jul 22, 2026YORKSHIRE INDUSTRIES LLC$389KSD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD
- Jun 8, 2026GCS LLC$207KCO NP COLM 10(5), GUARDRAIL IMPROVEMENT
- Apr 23, 2026STEVE MANNING CONSTRUCTION INC$9.4MWY FLAP SHE 26(1), Red Grade Road, Phase 1
- Apr 22, 2026Blu Riderz Minot ND 58701 USA$4.3MND OMAD 2024(1) MINUTEMAN MISSILE ACCESS ROAD
- Apr 22, 2026PINE BLUFFS GRAVEL & EXCAVATING, INC.$6.0MCO OMAD 300(70) MINUTEMAN MISSILE ACCESS ROAD
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Federal Highway Administration (FHA) since 2024 (0 filings)
- 0 of their lobbyists list a past Federal Highway Administration (FHA) job
- $3K from their corporate PACs since 2024 to members of House Committee on Appropriations, House Committee on Transportation and Infrastructure, Senate Committee on Appropriations, Senate Committee on Environment and Public Works
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 10 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 1 of the past winners are listed companies
- 11 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.