SolicitationPosted Oct 6, 2026·Responses due Nov 20, 2026

59--CIRCUIT BREAKER, IN REPAIR/MODIFICATION OF

NAVSUP (Naval Supply Systems Command) · NAVSUP WEAPON SYSTEMS SUPPORT

Stage
Open solicitation
NAICS
335313
Value
Not stated
Solicitation
N0038326RHA69
Set-aside
None stated
PSC
5925
Place
Not stated
Contact
Electronic Mail: MICHAEL.J.ZUCCARINI.CIV@US.NAVY.MIL (MICHAEL.J.ZUCCARINI.CIV@US.NAVY.MIL)
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation N0038326RHA69 in this department, oldest first.

Early notice
  • Aug 6, 2026
    Pre-solicitation
    Open
  • Oct 6, 2026
    Pre-solicitation
    Open
Solicitation
  • Aug 24, 2026
    Solicitation
    Open
  • Oct 6, 2026 · this notice
    Solicitation
Award
Not yet. Typical award: Oct 12, 2026 to Feb 19, 2027, middle of the range Nov 9, 2026.
Measured from 32 past solicitations at Dept of the Navy with NAICS 335313 that later posted an award (middle half of cases, counted from Aug 24, 2026).
Responses are due Nov 20, 2026, so an award before then is unlikely; past cases include short solicitations.

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS … (show all)

(DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 DAYS AFTER DELVIERY OF THE UNIT|45 DAYS AFTER THE DEFECT WAS FOUND||||| SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4||||| SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023)|9|||||||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA --MODIFICATIONS (DEV 2026-O0048)(MAR 2026))|7|||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)|1|EMAIL| TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| The purpose of this amendment is to increase the quantity by 70ea, from 43ea to 113ea. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. Early and incremental deliveries accepted. The requested RTAT for this repair solicitation is 104 days. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.3 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.5 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: CIRCUIT BREAKER ;458SUE2-1; P/N, ;015378655; NSN, ;IAW Applicable manuals; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing

Who won similar work

6 award notices on SAM.gov in the last 24 months. Match: Same agency (NAVSUP (Naval Supply Systems Command)), same industry group (NAICS 3353).

WinnerAwardsValueLast
TELEDYNE INSTRUMENTS INC2$501KMay 14, 2025
EDINBURGH DESIGNS LTD1$1.1MApr 30, 2026
L3 TECHNOLOGIES, INC. · $LHX1$118KMay 7, 2025
EOLA POWER LLC1$68KSep 29, 2025
ADIRONDACK ELECTRONICS INC1$15KApr 30, 2026

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.

Latest awards

Competitive landscape

For the 5 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Navy, Dept of or U.S. Marines since 2024 (0 filings)
  • 0 of their lobbyists list a past Navy, Dept of or U.S. Marines job
  • $234K from their corporate PACs since 2024 to members of House Committee on Appropriations, House Committee on Armed Services, Senate Committee on Appropriations, Senate Committee on Armed Services
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 32 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.

  • 1 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.