Parachutist Oxygen Delivery System (PODS) Prototype
Army Contracting Command (ACC) · W6QK ACC-APG
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation W91CRB-Parachutist-Oxygen-Delivery-System-(PODS)-Prototype in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
PODS: Parachutist Oxygen Delivery System THIS IS NOT A SOLICITATION. IT IS A REQUEST FOR INFORMATION. In accordance with Federal Acquisition Regulations Part 10 responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Please respond by 26 June 2026 at 11:59 PM. Objective This Request for Project Preproposal (RPP) is issued to request preproposals (white papers) in accordance with Section III, B, 1 of the U.S. Army Combat Capabilities Development Command Soldier Center (DEVCOM SC) Broad Other Transaction Authority Announcement (BOTAA) 22-01 co… (show all)
mpetitive announcement and is being issued for planning purposes only. It is not to be construed as a commitment by the Government to award an agreement, nor will the Government pay for the information solicited. Product Manager Soldier Clothing and Individual Equipment (PdM SCIE) is seeking information on the capabilities and willingness of private entities (non-profit and commercial) to provide a Parachutist Oxygen Delivery System (PODS) design that will support a prototype project, as defined on page 5 of the BOTAA. Background PdM SCIE is executing a project to evaluate prototype supplemental oxygen delivery systems. The PODS capability is intended to be single materiel solution that is suitable for Military Free Fall (MFF) operations utilizing the Advanced Ram Air Parachute System (RA-1). The PODS system is planned to support the U.S. Army�s MFF community by addressing a capability gap to support all high-altitude parachutist mission profiles (e.g., High Altitude Low Opening (HALO) and High-Altitude High Opening (HAHO)) requiring supplemental oxygen. The PODS will comprise the following components: Parachutist Oxygen Mask (POM), Individual Oxygen Source (IOS), pre-breathing ports, transfer pump, and test stand. Included is a Non-traditional Defense Contractor Certification form to be filled out. Requirements The purpose of this RPP is to request preproposals to conduct Test and Evaluation (T&E) of systems that can meet PODS capability requirements. The proposed designs may be based on reusing, modifying, or enhancing existing designs. The preproposals shall address the full requirements of this RPP for a technology that is at or above Technology Readiness Level (TRL) six (6) as defined in the attached Technology Readiness Assessment Guidebook. Proposed solutions shall be fully compliant with the Berry Amendment, Defense Acquisition Regulation Supplement (DFARS) 252.225-7012, and the Buy American Act, DFARS 252.225-7001. PdM SCIE will conduct a phased T&E approach to select the best materiel solution for the Army. The T&E will include the following phases: Developmental Testing (DT) Phase 1, DT Phase 2, and Operational Testing (OT). The Government will make the final down-selection to one (1) candidate system at the conclusion of DT Phase 1 Live Jumps at 17,999ft Mean Sea Level (MSL). However, failure to meet performance criteria at any stage of DT Phase 1 may result in candidate systems being disqualified from continuing to the next stage. DT Phase 1 will include: Chamber test Environmental test Benchtop testing as required to verify KPPs, KSAs, and APAs Integration Assessment User Evaluations including Live Jumps up to 17,999ft MSL Following Live Jumps at 17,999ft MSL, the Government will down-select to one (1) candidate system to continue T&E. Selection will be based on best value. Life cycle costs, including initial procurement and sustainment based on the proposed maintenance concept, will be considered in addition to technical performance. DT Phase 1 will then conclude with the down-selected candidate system completing Live Jumps at 24,999ft MSL. DT Phase 2 will consist of a series of Live Jumps by Army Test and Evaluation Command (ATEC) test jumpers up to 24,999ft MSL. OT will consist of Live Jumps by the operational force to include various mission profiles including those outlined in the requirements. In addition, the test stand, console, and maintenance concepts will be evaluated. A Production OTA may be awarded to the down-selected vendor after successful completion of OT and obtaining Milestone C and Low-Rate Initial Production decisions. Production OTA award is contingent on availability of funds. PODS Performance Requirements The system performance requirements are given in Tables 1, 2, and 3 below. These tables provide both Threshold (T) and Objective (O) levels. The objective level is the performance goal, whereas the threshold level is the minimum acceptable level. PdM SCIE strongly prefers a solution that can meet objective levels of the PODS performance requirements. Table 1: Key Performance Parameters Key Performance Parameter (KPP) Production Threshold Production Objective KPP #1 � Performance (POM). Shall be capable of delivering the parachutist with O2 during pre-breathe, jump and landing (T=O). T=O KPP #2 � Performance (IOS). Shall provide parachutist with sufficient supply of O2 for minimum of 45 minute parachutist descent using a minimum 400 liter capacity utilizing the POM (T). Shall provide parachutist with sufficient supply of O2 for minimum 1 hour descent, plus provide sufficient O2 to support parachutist through pre-breathing phase of 75 minutes (O). KPP #3 � Reliability and Confidence (IOS and POM). Shall have reliability of 0.95 @ 90 percent (90%) confidence level without occurrence of system abort or system failure (T). Shall have reliability of greater than (>) 0.95 at 90 percent (90%) confidence level without occurrence of system abort or system failure (O). Note on KPP#2 � (O) allows for different capacity/size IOS than the stated minimum size in the (T) Table 2: Key System Attributes Key System Attribute (KSA) Production Threshold Production Objective KSA #1 - Performance (Pre-Breather Ports). Each shall be capable of providing 20-lpm of O2 for 75 minutes (T). Each shall be capable of providing a parachutist with 20-lpm for 2 hours (O). KSA #2 - Air Standardization (System) Use of Aviator�s Breathing Oxygen (ABO) shall not degrade system, components or safety (T=O). T=O KSA #3 - Override System (Pre-Breather) Pre-Breather shall possess means to override IOS pressure when parachutist is connected to Pre-Breather port/station (T). Shall possess visual indicator to alert parachutist if oxygen from IOS is being consumed during pre-breathing operations (O). KSA #4 - Pressure Gauges (System) Transfer Pump, Pre-Breather, and IOS shall possess indicators and pressure gauges to verify functionality (T). Shall possess digital indicators readable in all light conditions and while wearing NVD and will be read by the parachutist (O). KSA #5 � POM Shall have provision for communications, compatible with parachutist�s organic devices (T=O). T=O Table 3: Additional Performance Attributes Additional Performance Attribute (APA) Production Threshold Production Objective APA 1 - Performance (Transfer Pump). Shall be capable of recharging 6 IOS simultaneously (T). Shall be capable of recharging 12 IOS simultaneously (O). APA 2 � Connectors / Fittings / Valves (System) Connectors shall be self-sealing quick disconnect assemblies; Transfer Pump shall possess pressure bleed-off valves; Transfer Pump manifold shall possess individual shut off values and individual pressure relief values; all connectors shall provide protection for O2 fittings when not in use (T=O). T=O APA 3 - Compatibility (System) IOS shall be physically and functionally compatible with legacy POMs, Pre-Breathers and charging assemblies (T). Shall be capable of modification to incorporate new technologies (O). APA 4 - Hoses (POM and Pre- Breather) Shall possess self-sealing medium pressure (50 � 100) pounds per square inch (psi)) and withstand rigors of high altitude operations. Shall not impede parachutist�s ability to locate and deploy main or reserve parachutes (T=O). T=O APA 5 - Environmental Conditions (IOS and POM) Shall operate at temperatures ranging from -45 degrees
Who won similar work
1272 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Army Contracting Command (ACC)), any industry: a loose match.
Loose match: same agency, any industry. Read the titles before treating these as competitors.
Single-winner award sizes (1222): middle half $107K to $4.5M, median $487K; range $405 to $20.0B.
| Winner | Awards | Value | Last |
|---|---|---|---|
| DMYLES INC. | 18 | $13.6M | Sep 21, 2026 |
| Lockheed Martin Corporation · $LMT · $67.6B | 15 | $30.5B | Sep 15, 2026 |
| DYNASTY CHEMICAL CORP | 14 | $1.4M | Oct 13, 2026 |
| Northrop Grumman Systems Corporation · $NOC · $39.3B | 10 | $10.7B | Sep 3, 2026 |
| ADVANCED TECHNOLOGY INTERNATIONAL Summerville SC 29486 USA | 10 | $150.6M | Sep 3, 2026 |
| AMERICAN ORDNANCE LLC | 10 | $70.3M | Sep 23, 2025 |
| PHILLIPS CORPORATION | 8 | $38.4M | Sep 26, 2025 |
| NEW TECH SOLUTIONS, INC. | 8 | $2.5M | Mar 4, 2026 |
| K2 CONTRACTING GROUP, LLC | 7 | $2.9M + 2 shared | May 29, 2026 |
| FSR CONSULTING LLC | 6 | $781K | Dec 25, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- $LMT reported $67.6B revenue in FY2025. The median single-winner award in these 1222 past awards, $487K, is under 0.1% of that. 10-K
- $NOC reported $39.3B revenue in FY2025. The median single-winner award in these 1222 past awards, $487K, is under 0.1% of that. 10-K
One award's total value against one year of revenue; many awards are paid over several years.
- Oct 15, 2026SHIFT5, INC.$99.0MShift5 Apps Enterprise ContractNo listed company matched (Materiality N/A)
- Oct 14, 2026ALL WORLD MACHINERY SUPPLY INC$1.1MW519TC-26-Q-A173 CNC Grinders Solicitation Amendment 0001 Award NoticeNo listed company matched (Materiality N/A)
- Oct 13, 2026AO Facility Contractors LLC$344KREPAIR WINDOWS AT WATERVLIET ARSENAL BUILDING 40-3No listed company matched (Materiality N/A)
- Oct 13, 2026GFS SUPPLY & SERVICES COMPANY$36KLab Microphone SystemNo listed company matched (Materiality N/A)
- Oct 13, 2026HARDWIRE LLC$35.0MAward Notice Small Arms Protective Insets (SAPI) Foreign Military SalesNo listed company matched (Materiality N/A)
- Oct 13, 2026DYNASTY CHEMICAL CORP$90KElectropolish for the Watervliet ArsenalNo listed company matched (Materiality N/A)
- Oct 9, 2026TUNISTA OPERATIONS SUPPORT SERVICES LLC$4.0MFuel Delivery Services - Rock Island ArsenalNo listed company matched (Materiality N/A)
- Oct 9, 2026Dunhill & Associates LLC$2.5MSnow and Ice Removal Services in Johnstown, PA (PA051)(PA052)(PA053) - W15QKN26QA142No listed company matched (Materiality N/A)
- Oct 8, 2026BURLINGTON ENGINEERING CORPORATION$34KSPARE FBC BAR BUSHINGS FOR THE VARINELLI RIFLERS for Watervliet ArsenalNo listed company matched (Materiality N/A)
- Oct 7, 2026Lewis Engineering Company$127KSplit Sleeve, 81mm Award NoticeNo listed company matched (Materiality N/A)
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 2 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (20 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- $759K from their corporate PACs since 2024 to members of House Committee on Appropriations, House Committee on Armed Services, Senate Committee on Appropriations, Senate Committee on Armed Services
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 8 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 2 of the past winners are listed companies
- 0 insider buys and 2 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.