Special NoticePosted Oct 13, 2026·Responses due Oct 16, 2026

N059--Fire Alarm Upgrade

Veterans Affairs · 241-NETWORK CONTRACT OFFICE 01 (36C241)

Stage
Early notice (sources sought, presolicitation or special notice)
NAICS
238210
Value
Not stated
Solicitation
36C24126Q0760
Set-aside
None stated
PSC
N059
Place
Not stated
Contact
Issa Shawki (issa.shawki@va.gov)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 36C24126Q0760 in this department, oldest first.

Early notice
  • Oct 13, 2026 · this notice
    Special Notice
Solicitation
None posted
Award
Not yet. Typical award: Dec 14, 2026 to Mar 10, 2027, middle of the range Jan 24, 2027.
Measured from 91 past early notices at Veterans Affairs, Department of with NAICS 238210 that later posted an award (middle half of cases, counted from Oct 13, 2026).

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Answer the notice: this is when the requirement can still be shaped.
  • Contact the contracting officer named on the notice.
  • Check who won similar work; they are the likely bidders.

What the notice says

The Department of Veterans Affairs, Networking Contracting Office (NCO 01) located in Brockton, MA intends to enter a sole source procurement, pursuant to the authority of FAR 6.302-1, with Encore Holdings LLC, for the following requirement: STATEMENT OF WORK (SOW) Background The VAMC Brockton campus operates an Edwards EST-3 fire alarm network that supports life safety monitoring, campus fire alarm annunciation, remote annunciation, sprinkler and control point reporting, notification appliances, and associated interfaces. The existing EST-3 platform is aged and obsolete. Place of Performance:… (show all)

940 Belmont Street, Brockton, MA Objective The objective of this requirement is to furnish all labor, supervision, programming, materials, tools, equipment, project management, testing, documentation, and training required to transition the VAMC Brockton campus fire alarm network from the existing Edwards EST-3 platform to an Edwards EST-4 networked platform while maintaining required fire alarm coverage and minimizing impairment duration. Applicable Standards and Requirements Work shall comply with applicable federal, state, local, VA, VHA, Joint Commission, OSHA, and Authority Having Jurisdiction requirements, including the latest adopted editions applicable to this facility. At a minimum, work shall be performed in accordance with the following, as applicable: NFPA 70, National Electrical Code. NFPA 72, National Fire Alarm and Signaling Code. NFPA 101, Life Safety Code. NFPA 25, where sprinkler supervisory and waterflow interfaces are affected. VA/VHA life safety, interim life safety measures, cybersecurity, infection-control, and facility access requirements. Manufacturer requirements for Edwards EST-4 hardware, programming, FireWorks integration, and compatible SIGA field devices. Scope of Work The Contractor shall provide a complete, operational, tested, documented, and accepted Edwards EST-4 upgrade of the existing Brockton campus fire alarm network. The scope includes, but is not limited to, the following work elements. Project Management and Coordination Conduct a kickoff meeting with VA Engineering, Safety, IT, Police/Dispatch, clinical stakeholders as needed, the VA fiber contractor if applicable, and the Contracting Officer Representative (COR). Develop and maintain a project schedule identifying submittal dates, material procurement, programming milestones, outage/cutover windows, fiber-demarcation coordination, testing, training, and closeout. Coordinate all work affecting fire alarm service, system monitoring, FireWorks, master box/monitoring paths, network drops, building access, and any life safety impairment with the VA before work begins. Submit a written cutover plan before any node, panel, annunciator, or network segment is taken offline. The plan shall identify expected downtime, temporary monitoring method, notifications, responsible parties, rollback steps, and acceptance testing sequence. Coordinate with VA IT staff for FireWorks integration, IP/network drops, cybersecurity review, firewall modules, and any network-connected components required for the EST-4 platform. Provide manufacturer-certified project supervision and programming support throughout the project. EST-3 to EST-4 Programming Migration Pre-program and transition the existing Edwards EST-3 fire alarm program/database into an Edwards EST-4 architecture for the existing campus fire alarm network. Use qualified Edwards/EST-4 factory-trained programming personnel. Complete pre-programming off-site to the maximum practical extent and have the EST-4 program ready for integration after hardware upgrades are completed. Replicate any approved changes made to the EST-3 program before implementation into the EST-4 program before cutover. Perform program verification, input/output mapping, matrix verification, cause-and-effect review, FireWorks point mapping, and device/zone/nodal naming verification before final acceptance testing. Hardware Replacement and Installation Decommission and replace existing EST-3 internal fire alarm panel components that must be replaced as part of the EST-4 upgrade. Furnish and install Edwards EST-4 networked platform components, panel hardware, power supplies, network cards, modules, enclosures, batteries, and accessories required for a complete operational system. Replace all existing remote annunciators and backboxes in their existing locations with compatible EST-4 units. New units may differ in size from existing units; contractor shall identify any surrounding finish impacts before installation. Reuse existing field wiring, initiating devices, notification appliances, sprinkler/suppression interface points, and SIGA addressable devices where compatible and functional. Label new and replaced components, update panel directories, and provide device/node identifiers consistent with the accepted program and testing documents. Protect existing finishes, equipment, patient care areas, and building systems. Cutting, patching, and painting are excluded unless separately authorized in the final contract. Field Device and System Integration Integrate all existing addressable initiating devices, notification devices, sprinkler points, control points, audio/visual devices, and field wiring into the EST-4 platform to the extent they are compatible and functional. Maintain existing fire alarm sequence of operations unless changes are approved in writing by the VA. Integrate the upgraded system with the existing FireWorks system and campus monitoring architecture. Advanced scheduling with VA staff and IT staff is required. Verify interfaces to supervisory circuits, waterflow/tamper devices, elevator recall/shunt trip interfaces, HVAC shutdown, door release, smoke control, or other building systems where such interfaces are part of the existing fire alarm sequence. Replacement of field devices, node-to-node rewiring, correction of existing wiring defects, and correction of pre-existing system troubles are excluded unless separately authorized by the Contracting Officer. Brockton Fiber Coordination and Network Stability Review the existing FACP node fiber terminations and identify any fiber-demarcation conditions that could affect EST-4 network stability. Coordinate with the VA and VA fiber contractor regarding local demarcation panels adjacent to each FACP, fiber patch cords within each panel enclosure to each FACP, and any other fiber remediation recommended before or during EST-4 cutover. Document any fiber-related deficiencies, risks, or recommended actions discovered during planning or cutover. Fiber-related costs, fiber installation, fiber remediation, and third-party fiber contractor work are excluded unless separately authorized. Do not proceed with final cutover of affected FACP nodes where identified fiber conditions create an unacceptable risk of network instability unless the VA approves the risk mitigation or sequencing plan. Continuity of Monitoring and System Impairment Control No fire alarm panel, node, annunciator, or monitoring path shall be removed from service until the VA approves a written impairment/cutover plan. The Contractor shall support the VA in identifying temporary measures required to maintain monitoring coverage during each cutover window. Temporary cellular dialer or similar temporary monitoring measures shall be used if included in the final award or otherwise authorized by the Contracting Officer. The Contractor shall provide advance notice for all impairments and shall not leave a system impaired without VA approval. Fire watch is excluded from the base proposal unless separately authorized. If fire watch is required by VA or the AHJ, the VA will establish the fire watch approach or add it by contract action. Testing, Inspection, and Acceptance After hardware installation and programming are complete, perform 100 percent testing of the upgraded fire alarm system. Testing shall include, at a minimum, all addressable initiating

Who won similar work

6 award notices on SAM.gov in the last 24 months. Matched by: Same office (241-NETWORK CONTRACT OFFICE 01 (36C241)), same NAICS 238210.

Single-winner award sizes (6): middle half $234K to $302K, median $282K; range $106K to $762K.

WinnerAwardsValueLast
ANDY RAMOS ELECTRIC LLC1$762KNov 20, 2024
PANACEA CONSTRUCTION GROUP LLC1$308KMar 31, 2025
RICHARD GROUP LLC1$283KJan 2, 2025
KEE SOLUTIONS LLC1$280KDec 2, 2024
DIVERSIFIED SITE SERVICES LLC1$219KFeb 27, 2025
AMAZ CONSULTING LLC1$106KJan 16, 2026

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.

Latest awards

Competitive landscape

For the 6 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
  • 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 25 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.