Sources SoughtPosted Oct 9, 2026·Responses due Oct 9, 2026

DA01--Enterprise Resource Planning (ERP), System Integrator (SI) Information/Discovery Session

Veterans Affairs · TECHNOLOGY ACQUISITION CENTER NJ (36C10B)

Stage
Early notice (sources sought, presolicitation or special notice)
NAICS
541519
Value
Not stated
Solicitation
36C10B27Q0032
Set-aside
None stated
PSC
DA01
Place
Not stated
Contact
John A Adamitis (john.adamitis1@va.gov)
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation 36C10B27Q0032 in this department, oldest first.

Early notice
  • Oct 7, 2026
    Sources Sought
    Open
  • Oct 9, 2026 · this notice
    Sources Sought
  • Oct 9, 2026
    Sources Sought
    Open
Solicitation
None posted
Award
Not yet. Typical award: Oct 24, 2026 to Dec 2, 2026, middle of the range Nov 4, 2026.
Measured from 70 past early notices at Veterans Affairs, Department of with NAICS 541519 that later posted an award (middle half of cases, counted from Oct 7, 2026).

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Answer the notice: this is when the requirement can still be shaped.
  • Contact the contracting officer named on the notice.
  • Check who won similar work; they are the likely bidders.

What the notice says

1. VA intends to hold information/discovery sessions with respondents that will serve as the prime contractor who will be responsible as the System Integrator and provide all required licenses and products as a service, by offering their COTS product or solution. Vendors shall identify all OEMs they would intend to partner with to meet the solution. The solution shall meet VA's ERP requirements by acting as the Systems Integrator (SI) responsible for implementing and integrating the proposed solution. Vendors responding solely as subcontractors or without the capability to serve in either of t… (show all)

he aforementioned capacities should not respond for inclusion in these sessions. 2. Requirement Status: VA's ERP requirements remain in draft status and are currently undergoing further development, refinement, and revision. Interested vendors should be aware that the Government anticipates changes to the requirements outlined in the Draft Performance Work Statement (PWS) previously provided through earlier RFIs. The previously posted Draft PWS should not be considered final or representative of the Government's finalized requirements. Information gathered through ongoing market research and discovery sessions may further inform the development of the acquisition requirements and strategy. VA plans to post a new draft PWS prior to RFP release. 3. If you have responded to the original posting of RFI 36C10B27Q0032 and confirmed the above there is no need to respond again to this RFI amendment. 4. The Due date remains the unchanged. 10.9.26 3:00 PM EST. 5. For background, the current PWS reflects an approach in which licenses are procured through a Systems Integrator (SI) as a managed service. Platform Architecture: The requirement for a single platform to natively provide all functionality has been removed. SIs may propose multi-tool solutions, provided all requirements are met. Migration Approach: The Government no longer requires that all existing customizations be migrated prior to transitioning to a greenfield environment. A hybrid approach is now permitted, in which the SI may implement a greenfield solution first and subsequently migrate scoped applications. The Government is continuing to develop and refine the scope and functional requirements for these applications, which will be reflected in the forthcoming Request for Proposals (RFP). Systems Integrators (SIs) offering native solutions that address the functionality of applications ultimately included within the scope of the procurement may explain those capabilities. Data Retention: The solution shall retain data in accordance with applicable NARA-approved records retention schedules and VA records management policy [cite specific GRS/VA schedule number if known]. The System Integrator (SI) shall document the retention period, archival method, and disposition process for each data category within the system. Data Reporting: The solution shall provide data reporting and analytics capabilities. Reporting queries, dashboards, and ad hoc analytics shall not degrade the performance of the production environment. Data Migration: Full data migration from legacy systems to the new ERP tool solution is no longer a mandatory requirement. SIs may propose alternative methods of legacy data access in reportable and usable format in lieu of complete migration (e.g., federated access, API-based retrieval, or incremental/selective migration). Any proposed alternative must: Preserve compliance with NARA retention requirements above; Support the production reporting capability described above; Be clearly documented with associated risks, limitations, and long-term support implications. Transition Timeline: The current requirement is a 9-month transition period, consisting of onboarding and implementing the SI's proposed solution. ServiceNow (SN) Licensing: Where an SI proposes a re-platforming solution that may include the incumbent tool, the SI will be responsible for any residual licenses or components required after expiration of the current contract (September 2027). SIs proposing such a solution must include a cost-reduction plan that migrates functionality to the new platform over time, retaining only those incumbent components that cannot reasonably be eliminated. Super Intelligence: Incorporation of Super Intelligence capabilities is now a required element of the proposed solution rather than an optional feature.

Who won similar work

160 award notices on SAM.gov in the last 24 months. Match: Same office, same NAICS 541519.

WinnerAwardsValueLast
V3GATE, LLC24$305.2MOct 18, 2026
Alvarez LLC16$31.7MOct 7, 2026
THUNDERCAT TECHNOLOGY, LLC15$31.7MSep 30, 2026
REDHAWK IT SOLUTIONS LLC14$16.5MSep 23, 2026
MINBURN TECHNOLOGY GROUP, LLC12$9.9MOct 8, 2026
FOUR POINTS TECHNOLOGY, L.L.C.7$7.3MMay 13, 2026
ARCHITECHTURE SOLUTIONS LLC6$3.9MOct 13, 2026
METGREEN SOLUTIONS INC5$162.1MSep 24, 2026
GREENBRIER GOVERNMENT SOLUTIONS INC5$22.4MSep 23, 2026
COLOSSAL CONTRACTING LLC4$42.3MMay 18, 2026

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.

Latest awards

Competitive landscape

For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
  • 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 25 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.