ROD,WELDING
NAVSUP (Naval Supply Systems Command) · NAVSUP WEAPON SYSTEMS SUPPORT MECH
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation N0010425QFA01 in this department, oldest first.
- Oct 3, 2024 · this noticeSolicitation
- Oct 7, 2024SolicitationOpen
- Feb 7, 2025SolicitationOpen
- Feb 7, 2025SolicitationOpen
- Jun 24, 2025SolicitationOpen
- Jun 24, 2025SolicitationOpen
- Sep 19, 2025SolicitationOpen
- Sep 19, 2025SolicitationOpen
- Jan 23, 2026SolicitationOpen
- Jan 23, 2026SolicitationOpen
- Mar 20, 2026SolicitationOpen
- Mar 20, 2026SolicitationOpen
- Oct 7, 2026SolicitationOpen
- Oct 7, 2026SolicitationOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
CONTACT INFORMATION|4|N743.4|WVL|717-605-1501 |amanda.l.bailey50.civ@us.navy.mil | ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8||x||x||||| VARIATION IN QUANTITY (APR 1984)|3|0%|-5%|total contract quantity| TIME OF DELIVERY (JUNE 1997)|20|0001|500 LB|365|||||||||||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2… (show all)
023)|16|Stand-Alone Receiving Report - Certifications Combo-Receiving Report & Invoice - Material|N/A|TBD|N00104|TBD|N39040|N50286|TBD|133.2|N/A|N/A|S4306A - Material|N/A|N/A|See DD1423|PORT_PTNH_WAWF_NOTIFICATION@NAVY .MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|365 days after acceptance of material|365 days after acceptance of material||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|333992|1,250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| 1. Data Item A001 (inspection and Test Plan) may be waived if already on fileat NAVSUP WSS Mech. 2. NAVSUP WSS Mech will be considering past performance in the evaluation ofoffers. See Clause 252.213-7000. 3. The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS after receipt Final delivery of material (365 days) Please quote actual delivery days Early and incremental delivery is acceptable at no additional cost to the Government. 4. A variation in quantity of -5% of the total contract quantity is allowed. See FAR 52.211-16 for further details. 5. FAR 52.232-25(a)(5), entitled Prompt Payment, Constructive Acceptance ischanged from 7 days to 45 days after delivery of the supplies in accordancewith the terms and conditions of the contract. 6. This requirement has no Government source inspection. Inspection and Acceptance will occur at destination/destination. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. DOCUMENT REF DATA=AWS A5.01 | | | |930101|A| | | DOCUMENT REF DATA=AWS A5.28 | | | |200630|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | 3. REQUIREMENTS 3.1 Manufacture and Design - The item furnished under this contract/purchase order must meet the requirements as specified in AWS-A5.28, except as amplified or modified herein. AWS-A5.28 ordering data information is provided below: A. American Welding Society Specification AWS-A5.28; Low Alloy Steel filler metals for gas shielded arc welding. AWS Classification - ;ER90S-B3; Size, Diameter - ;3/32; Spool Size, Weight - ;N/A; Cut Length - ;36 inches; B. American Welding Society Specification AWS-A5.01; Filler Metal Procurement Guidelines. Lot Classification - Class S2 Intensity of Testing - Schedule J 3.2 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing (if any) per applicable specifications is still required, but certifications are only required as listed below. Test - ;Quality Conformance/Compliance Inspection (Includes Chemicals and Mechanicals); Item - ;Rod, Welding; Performance - ;AWS A5.01 and AWS A5.28; Acceptance - ;AWS A5.01 and AWS A5.28; 3.3 Container Size - Welding Electrodes must be supplied in ;10; pound containers. 3.4 Welding Electrode Strip Heaters - Electrical resistance rod-type or pad-type heaters (i.e. strip heaters) that are controlled automatically by thermocouples or manually by an on-off switch must be used to maintain preheat/interpass temperatures within the required range before and during welding of the usability (i.e. soundness) test plate and the mechanical property (when required) test plate. The test plate must be insulated or separated from the work bench. OXY-FUEL heating of any test plate is not permitted. 3.4.1 Holding fixture - During welding, the mechanical property test plate must be held in place by a fixture built in accordance with "HOLDING FIXTURE FOR MECHANICAL PROPERTY TEST PLATES", (CSD005 in the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/) The strip heaters required above must be placed against the back side of the test plate, between the test plate and the base plate of the test fixture. The length and width of the test plate must be dimensioned so as to be adequately held in place by the fixture. 3.5 Radiography - Radiography is required for test weldments and must be performed in accordance with T9074-AS-GIB-010/271 as modified by AWS-A5.28. Acceptance criteria must be AWS-A5.28. 3.6 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government inelectronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.6.1 Waivers/Deviations -
Who won similar work
39 award notices on SAM.gov in the last 24 months. Matched by: Same agency (NAVSUP (Naval Supply Systems Command)), same industry group (NAICS 3339).
Single-winner award sizes (39): middle half $46K to $478K, median $123K; range $23K to $40.0M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| CARVER PUMP COMPANY | 3 | $1.0M | May 11, 2026 |
| CURTISS-WRIGHT ELECTRO-MECHANICAL CORP · $CW · $2.8B | 2 | $4.1M | Sep 24, 2025 |
| Palfinger Marine USA, LLC | 2 | $1.6M | Oct 1, 2025 |
| Northrop Grumman Systems Corporation · $NOC · $39.3B | 2 | $719K | Aug 21, 2026 |
| WEST COAST WIRE ROPE & RIGGING, INC. | 2 | $83K | Sep 18, 2026 |
| Electric Boat Groton CT USA | 1 | $40.0M | Sep 28, 2026 |
| MEGGITT DEFENSE SYSTEMS, INC. · $PH · $19.9B | 1 | $4.2M | Mar 11, 2025 |
| ALLIED SYSTEMS COMPANY | 1 | $982K | Jul 9, 2025 |
| Parker-Hannifin Corportaion Irvine CA 92618 USA | 1 | $833K | Jun 8, 2026 |
| THE BOEING COMPANY | 1 | $775K | Aug 10, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- $CW reported $2.8B revenue in FY2025. The median single-winner award in these 39 past awards, $123K, is under 0.1% of that. 10-K
- $NOC reported $39.3B revenue in FY2025. The median single-winner award in these 39 past awards, $123K, is under 0.1% of that. 10-K
- $PH reported $19.9B revenue in FY2026. The median single-winner award in these 39 past awards, $123K, is under 0.1% of that. 10-K
One award's total value against one year of revenue; many awards are paid over several years.
- Oct 13, 2026Kijero, LLC$38KHydraulic Power Unit CFAO Port Operations White BeachNo listed company matched (Materiality N/A)
- Sep 28, 2026Electric Boat Groton CT USA$40.0MACTUATOR, HYDRAULICNo listed company matched (Materiality N/A)
- Sep 24, 2026WESTEX GROUP, INC$25K3940 CHAIN TOP RIGGINGNo listed company matched (Materiality N/A)
- Sep 23, 2026KIPPER TOOL COMPANY$31KPower Hawk P-16 DC-1 Damage Control KitNo listed company matched (Materiality N/A)
- Sep 18, 2026WEST COAST WIRE ROPE & RIGGING, INC.$46KBRAND NAME HARRINGTON HOISTS INC. - STATIC & DYNAMIC LOAD TESTERNo listed company matched (Materiality N/A)
- Aug 25, 2026BURHANI ENTERPRISES INC$64KAir Dryer PartsNo listed company matched (Materiality N/A)
- Aug 21, 2026Northrop Grumman Systems Corporation$420KSTEERING WHEELMateriality: <0.01% of $NOC revenue (Low) SEC
- Aug 19, 2026WEST COAST WIRE ROPE & RIGGING, INC.$36KELECTRONIC CHAIN HOISTNo listed company matched (Materiality N/A)
- Aug 13, 2026FLOW INTERNATIONAL CORPORATION$59KSole Source Award NoticeNo listed company matched (Materiality N/A)
- Aug 10, 2026THE BOEING COMPANY$775KSWITCH,FIBER OPTICMateriality: <0.01% of $BA revenue (Low) SEC
Materiality: one award's value as a share of the winner's revenue over the latest 12 months in its SEC filings (or its last fiscal year, as noted when you point at it). Low under 1%, Medium 1 to 5%, High 5% or more. Many awards are paid over several years, so this overstates a single year's share.
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 2 of these past winners lobbied Navy, Dept of or U.S. Marines since 2024 (27 filings)
- 0 of their lobbyists list a past Navy, Dept of or U.S. Marines job
- $453K from their corporate PACs since 2024 to members of House Committee on Appropriations, House Committee on Armed Services, Senate Committee on Appropriations, Senate Committee on Armed Services
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 8 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 3 of the past winners are listed companies
- 1 insider buys and 3 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.