Loading the records…
Loading the records…
NAVSEA, naval shipyards and surface/undersea warfare centers · NAVSEA HQ
NAVSEA is planning to buy "RFI - AEGIS Combat System Support Equipment, Electronic Equipment Fluid Cooler, AN/SPY Radar Warhead Data Receiver Cabinets (WDRC)". This is an early notice: it is not taking bids yet. The original due date (Jan 16, 2025) has passed; check the latest amendment for the current one. In the last 2 years, similar work went to 2 companies, usually for about $22.8M per award. An award could come any day: the usual time to award has passed.
Put together from the facts on this page; the details and sources are below.
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Every notice posted under solicitation N00024-25-RFI-AEGIS-HARDWARE in this department, oldest first.
Standard steps for the notice type; not advice about this buyer.
s interest in one of the requirements or all of the requirements (WDRC, ACSSE, and EEFC) listed above. Interested sources may receive Controlled Unclassified Information (CUI) to support your RFI response within 30 days from receipt of the executed Terms of Use Agreement (TOUA). Additionally, NAVSEA anticipates holding an industry day for these requirements on or around 9 January 2025. Interested parties shall identify whether they are interested in attending an industry day when emailing the TOUA to the POCs below or prior to 16 December 2024. The scope of this RFI includes: 1. Production of WDRC equipment, which consists of two (2) cabinets per ship, ancillary equipment, and spares. 2. Production of shipsets of ACSSE Equipment, consisting of Maintenance Assist Modules (MAMs) storage cabinets, and various pieces of equipment such as panels, switches, and cabling. 3. Production of EEFCs, where there are 50 and 100 Gallon Per Minute (GPM) variants, which consists of up to (4) water coolers per ship (depending on ship configuration). 4. Engineering support to update and maintain the Level 3 Technical Data Package (TDP) as defined in MIL-STD-31000B. 5. Maintaining an Engineering test facility, consisting of an Electromagnetic Interference (EMI) shielded , controlled, filtered electronic cooling system with capacity to cool multiple systems, and capability of handling classified and Communications Security (COMSEC) equipment and support to conduct WDRC system level testing. This is shipboard tactical equipment, which meets Navy Surface Ship Environmental Qualification Requirements (to include MIL-STD-901D shock, MIL-STD-167 vibration and MIL-STD-461 EMI) for installation aboard U.S. and Foreign Military Sales (FMS) ships. The Government anticipates a majority of the work to be performed at the contractor's site. Interested parties shall address the following in the RFI submission: Cover Page - Company Information Provide company name, address, Unique Entity Identifier, CAGE code, tax identification number, designated representative name(s) and point of contact, including phone numbers and e-mail addresses. Confirmation that your firm has up to SECRET safeguarding If your company has an approved Quality Management System (in accordance with NAVSEA Standard 009-04) 2. Experience and Performance Capability for production of WDRC, EEFC, and/or ACSSE Provide an overview of your company's experience and capabilities for producing complex tactical processing systems using a Government provided Level 3 TDP. The overview should describe current or past contracts providing: Systems engineering to design, develop, test, qualify, produce, deliver and support other related hardware using Government provided Level 3 TDPs. Spare Modules Miscellaneous hardware to include cabinet locks Managing all design and production aspects of a Radio Frequency (RF) and Digital Processing Cabinets EMI shielded Testing facilities with a controlled, filtered electronic cooling system with capacity to cool multiple systems to include Special Test Equipment (STE) design and integration experience. Summarize your experience supporting the following activities: Conducting formal design and test reviews Implementing and maintaining a Configuration Management (CM) program in accordance with NAVSEAINST 4130.12B. Managing obsolescence to include a Diminishing Manufacturing Sources and Material Shortages (DMSMS) plan and metrics. Implementing and maintaining a Reliability, Maintainability and Quality Assurance (RMQA) program. Planning and implementing a production program. Conducting Life Cycle Cost (LCC) analyses and updates. Providing Integrated Logistics Support (ILS) related technical data, technical publications and supply support analyses such as technical manuals, maintenance procedures/instructions and other training documentation, repair parts lists, tool lists, and provisioning documentation. Engineering Support to define and update TDP Describe the company's capabilities and experience in providing engineering support for developing and updating TDPs, with specific emphasis on current and future tactical processing in a complex weapon system. The contractor will periodically update/maintain the Level 3 (Production Level) WDRC, ACSSE, and/or EEFC TDPs, as defined in MIL-STD-31000B, to address production component obsolescence. The Navy is interested in the company's analytical and documentation process for TDPs. Production Capacity Interested parties shall provide evidence of its ability to produce quantities at the required rate and provide a plan for producing the maximum quantities. A throughput capacity of up to six (6) WDRC shipsets, up to six (6) shipsets of ACSSE equipment, and/or six (6) EEFC shipsets per year is anticipated. The EEFCs System require delivery dates are twenty-four (24) months after award including all factory level system testing, the ACSSE required delivery dates are twelve (12) months after award and the WDRC System's required delivery dates are twenty-two (22) months after award. Barriers to Competition Please identify any obstacles to competition to include whether these requirements should be procured under one contract. If delivery schedule is an issue, please advise any GFP or what delivery schedule your firm could deliver to. In addition, the company should recommend solutions or mitigation paths for the Navy to overcome the obstacles. Firms are encouraged to discuss any potential financial/internal concerns it would have that could be a potential barrier to entry. Responses to this Request for Information notice shall be UNCLASSIFIED and shall not exceed twenty (20) pages in length, Responses shall be composed using Times New Roman, 10-pt font, one (1) inch margins, and submitted in Microsoft Word 2010 or searchable Adobe Portable Document Format (PDF). Each submission shall be electronic (virus-scanned) and submitted via email to the Government Points of Contact listed below. This RFI is issued for informational and planning purposes only and is not to be construed as a commitment by the Government to issue a solicitation or to award a contract. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. As such, the Government will not reimburse any costs associated with responding to this notice. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's qualifications to meet the requirement. Any information submitted by respondents is strictly voluntary. Respondents should properly mark their responses with the appropriate restrictive markings. Information that is proprietary or competition-sensitive may be protected from disclosure under the Public Records Law only if properly labeled as such. The Government may choose not to respond to specific questions or comments submitted in response to this RFI notice or information provided as a result of this RFI. Respondents will not be notified of the results of this notice. The information obtained from submitted responses may be used in the development of an acquisition strategy and future solicitation. If a solicitation is issued, it will be announced separately on sam.gov and all interested parties must respond to that
3 award notices on SAM.gov in the last 24 months. Matched by: Same office (NAVSEA HQ), same product/service code (PSC) 1285 and NAICS 334511.
Single-winner award sizes (3): middle half $11.7M to $42.7M, median $22.8M; range $487K to $62.6M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| LOCKHEED MARTIN CORPORATION · $LMT · $77.0B | 2 | $85.5M | Apr 10, 2025 |
| MERCURY SYSTEMS INC · $MRCY · $983.6M | 1 | $487K | Jul 10, 2025 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
One award's total value against one year of revenue; many awards are paid over several years.
Materiality: one award's value as a share of the winner's revenue over the latest 12 months in its SEC filings (or its last fiscal year, as noted when you point at it). Low under 1%, Medium 1 to 5%, High 5% or more. Many awards are paid over several years, so this overstates a single year's share.
For the 2 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.