Market Intelligence - Richmond ARC - CM at Risk
Army Corps of Engineers · W072 ENDIST LOUISVILLE
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation W912QR-CMRISK-RICHMOND-ARC in this department, oldest first.
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
***NOTICE*** Use the link provided under "Submission Instructions" to respond to the questions. Responses submitted any other way will not be accepted. REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reim… (show all)
burse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm�s ability to submit a proposal should formal solicitation be issued in the future. NAICS Code: 236220 � Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Louisville District, has a requirement for the construction of Army Reserve Center (ARC) at DSCR Richmond, VA. The scope of work consists of furnishing all necessary equipment, materials, labor, supervision, quality control, and supplies to deliver a fully functional 300 Member Army Reserve Center, including an Un-Heated Storage (UHS) Building. ARC is estimated at 56,678 SF and the UHS is estimated at 1,217 SF. Estimated Acquisition Magnitude: $30,000,000 � $50,000,000 PLANNED ACQUISITION STRATEGIES UNDER EVALUATION: Construction Management at Risk (CM@Risk) via Other Transaction Authority (OTA). The Louisville District is evaluating a Construction Management at Risk (CM@Risk) strategy utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. � 2808a. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. Currently, the Government has advanced the design to 65% and has the capability to progress to a full design. Therefore, the Government is utilizing this RFI to assess industry capability, interest, and the advantages of utilizing Construction Management at Risk (CM@Risk) utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. � 2808a. The CM@Risk Course of Action (10 U.S.C. � 2808a): This path allows USACE to execute a construction project where the Construction Firm is brought in during the design. Based on the current status of the Richmond ARC design effort, the Louisville District anticipates onboarding the CMAR at around 90% completion. Phase 1 Preconstruction: The builder is hired during Phase 1 to act as an expert consultant, helping the Designer of Record (DOR) push the design from 90% to 100% using real-time market data and MII (MCACES 2nd Generation) cost comparisons. Phase 2 Construction: Once the design hits 100% and the MII estimate validates the open-book pricing, the agreement transitions to Phase 2, where the builder goes "At-Risk" to construct the facility under a Guaranteed Maximum Price (GMP). The DOR retains design liability, but the contractor drives constructability and assumes responsibility for layout, schedule, and trade coordination. The CM@Risk Pricing Structure: Preconstruction Services Fee: A small, fixed-price amount paid to the contractor strictly to fund their time spent helping the Architect Engineer (A/E) finalize the 90% design into a 100% design. The Target Fee: The contractor�s transparent profit margin for managing the actual construction, bid competitively upfront. The GMP: The absolute ceiling for the construction phase (Validated Direct Costs + Target Fee + Shared Contingency). PHASED EXECUTION PLAN Phase 1: Preconstruction Services Agreement (CM@Risk Advisory) Solicitation (White Papers): The Solicitation would likely include the 65% design. The Deliverable is anticipated to be a concise 10 page White Paper. Submission requirements will likely include Corporate capability and experience with collaborative project delivery methods including CM@Risk, Progressive Design Build, Early Contractor Involvement; preconstruction approach (how the firm plans to collaborate with the Government's A/E to close the remaining 10% design gap, identify value-engineering opportunities, and mitigate supply-chain risks); evidence of bonding capability. The Pitch Meeting (Oral Presentations): A 90-minute pitch where the contractor must bring their Project Manager, Site Superintendent, and their Preconstruction Manager. The Government team assesses how well the contractor's team will integrate with the A/E during the critical final design push and manage successful construction completion. The OT is initially awarded and funded only for the Preconstruction Services Fee. Design Finalization (Bridging the 10% Gap): The contractor�s Preconstruction team sits with the Government and the DOR. Because the design is not locked, they can actively change it. They perform value engineering, finalize equipment selections, and ensure the drawings are 100% constructible. Open Book Pricing vs. MII: As the design reaches 100%, the contractor conducts open-book market outreach. The Government and contractor review actual sub-bids together. USACE cost estimators finalize the Independent Government Estimate (IGE) using the MII software to validate costs and establish the GMP base. Phase 2: Construction Execution Agreement (Going "At-Risk") Execution: The Agreements Officer (AO) executes a bilateral modification to the OT Agreement, incorporating the GMP and funding the physical construction. Risk Allocation: Under CM@Risk, the contractor is now "At-Risk." While the DOR retains design liability, the contractor collaborates to identify constructability conflicts during Phase 1. During Phase 2, while the DOR still owns fundamental engineering failures, the contractor loses the ability to claim "defective design" for constructability issues, material delays, or coordination errors, because they were explicitly paid to help finalize those exact decisions using market and MII data during Phase 1. INFORMATION REQUESTED Interested parties are requested to respond to the following questions to help shape the final acquisition strategy. Responses shall be made using the link or QR code in the attachment: Company Profile: Q1. Firm Name Q2. Address Q3. Point of Contact (Name, Title) Q4. Phone Number Q5. Email Address Q6. Unique Entity ID Q7. CAGE code Q8. Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.) Q9. Participating Role (Prime Contractor, Subcontractor, Design Firm, Other) Other Transaction Authority (OTA) & Statutory Compliance: Q10. OTA Experience: Describe your firm's previous experience (if any) executing projects under an OTA. Q11. Barriers to Innovation: What commercial or Government-imposed barriers currently make it difficult to propose or implement innovative construction technologies on traditional military construction projects? How could the flexibility of an OTA help overcome these barriers? Q12. Custom Commercial Terms & Dispute Resolution: To optimize the flexibilities of the Other Transaction Authority (OTA) framework, what specific commercial terms (e.g., tailored dispute resolution/rapid escalation mechanisms, commercial milestone payment structures, or shared intellectual property rights for innovative methods) would your firm recommend the Government adopt to minimize risk and incentivize your participation? Q13. What project characteristics make CM@Risk-OTA particularly advantageous or disadvantageous for this requirement? CM
Who won similar work
20 award notices on SAM.gov in the last 24 months. Matched by: Same office (W072 ENDIST LOUISVILLE), same product/service code (PSC) Y1JZ and NAICS 236220.
Single-winner award sizes (20): middle half $9.1M to $22.8M, median $14.3M; range $720K to $54.8M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| Butt Construction Company | 2 | $14.2M | May 16, 2025 |
| J. E. DUNN CONSTRUCTION COMPANY | 1 | $54.8M | Sep 19, 2025 |
| BL HARBERT INTERNATIONAL LLC | 1 | $46.0M | Nov 19, 2025 |
| COX CONSTRUCTION CO Vista CA 92081 USA | 1 | $36.6M | Mar 19, 2026 |
| J & J Contractors, Inc. | 1 | $33.1M | Sep 11, 2026 |
| COMMERCIAL CONTRACTING CORP | 1 | $23.5M | Sep 2, 2025 |
| F & R CONSTRUCTION GROUP INC | 1 | $22.6M | Sep 23, 2025 |
| BENAKA, INC. | 1 | $19.7M | Aug 14, 2025 |
| HAYDON COMPANIES LLC | 1 | $17.4M | Mar 28, 2025 |
| QBS INC | 1 | $16.3M | Jul 2, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Sep 17, 20269-12 LLC$10.4MVIRTUALIZED ELECTROMAGNETIC WARFARE AND MISSION ENGINEERING CENTER (VEWMEC)No listed company matched (Materiality N/A)
- Sep 11, 2026J & J Contractors, Inc.$33.1MDesign-Bid-Build Construction of a Collective Enlisted Training Barracks at Devens Reserve Forces Training Area (DRFTA), MANo listed company matched (Materiality N/A)
- Aug 27, 2026KREMPP CONSTRUCTION INC$9.8MUnmanned Fusion Warfare Laboratory at NSWC Crane INNo listed company matched (Materiality N/A)
- Mar 19, 2026COX CONSTRUCTION CO Vista CA 92081 USA$36.6MAWARD - Design Bid Build - Construction of the Advanced Skills Trainee Barracks at Parks Reserve Forces Training Area, CANo listed company matched (Materiality N/A)
- Nov 21, 2025DAP CONSTRUCTION MANAGEMENT LLC$6.5MConstruction of Davis-Monthan POTFF Facility, Tucson, AZNo listed company matched (Materiality N/A)
- Nov 19, 2025BL HARBERT INTERNATIONAL LLC$46.0MDesign Bid Build for Army Reserve Center in Birmingham, AlabamaNo listed company matched (Materiality N/A)
- Sep 23, 2025F & R CONSTRUCTION GROUP INC$22.6MAdvanced Skills Training Barracks - Fort Buchanan, Puerto RicoNo listed company matched (Materiality N/A)
- Sep 19, 2025J. E. DUNN CONSTRUCTION COMPANY$54.8MDesign-Bid-Build Construction of an Army Reserve Center (ARC) at Dobbins Air Reserve Base (ARB), GeorgiaNo listed company matched (Materiality N/A)
- Sep 18, 2025Gideon Contracting, Limited$6.8MAward - DBB - Construct Addition and Renovation AGE Facility B820, Minneapolis-St.Paul ARS, MNNo listed company matched (Materiality N/A)
- Sep 2, 2025COMMERCIAL CONTRACTING CORP$23.5MDTA Manned/Unmanned Tactical Vehicle LabNo listed company matched (Materiality N/A)
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.