Where this opportunity stands
Every notice posted under solicitation 36C25225B0001 in this department, oldest first.
- Jul 28, 2025Award NoticeJV6 CONTRACTING V2 LLC · $2.9MOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
36C25225B0001 0003 SF30 Continuation Sheet ACCOMPANYING 36C25225B0001 0003 SPS Renovation Construction Phases 2, 3 & 4 project#537-17-115 Jesse Brown VA Medical Center, Chicago, IL I. The following changes are to be made to the solicitation: 1. THE BID OPENING IS HEREBY CHANGED FROM IN-PERSON TO VIRTUAL. 2. THE BID OPENING DATE IS HEREBY EXTENDED FROM MARCH 17, 2025 AT 10:00AM TO MARCH 24, 2025 (see additional information below in red) 3. ADD RYAN McMILLIN TO THE point of contact OF REQUEST FOR INFORMATION (RFI) AND BID RECIPIANTS AT RYAN.McMILLIN@va.gov a. VIRTUAL BID OPENING INFORMATION: 1) … (show all)
Reminder, there will be no in-person public bid opening process. This will be conducted as a public virtual activity. 2) The virtual bid opening will be available to the public via Microsoft Teams at the following link and/or phone number: Join the meeting now (Meeting will be available to be accessed 15 min prior to bid opening) Meeting ID: 243 355 189 787 Passcode: B2gJ7Ae7 Dial-in by phone: 872-701-0185; Phone conference ID: 699 467 033# 3) IAW FAR 52.214-5 Submission of Bids and FAR 14.202-8 Electronic Bids; Bids shall be provided via email to the Contracting Officer at Stacy.Hoover2@va.gov AND Ryan.McMillin@va.gov as follows: BIDS DUE: Vendor bids are due via email as shown above at 10:00 AM local time on 3/24/2025. The virtual public bid opening will be held at 11:00 AM local time on 3/24/2025 at the link and/or the phone # provided above. A hard copy submission is not required. Any bids received after the date and time specified for receipt of bids will be processed in accordance with FAR 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999). 4) Ensure your complete bid including bid bond are provided in your submission. The successful low bidder is required to furnish their original bid bond within five (5) days after notification by the Contracting Officer. 5) Ensure your bid includes the completed VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) found on pages 67 and 68 in the original SF1442 solicitation document for reference. 6) It is highly recommended that Bidders submit their bid at least one hour prior to the bid due date/time to avoid any transmission issues. II. The following changes are made on project specifications: n/a III. The following changes are made on project drawings: n/a IV. The following Questions and Answers / Clarifications are the result of bidders request(s) for information: Please confirm if the superintendent can be SSHO and QCM. 1a. Yes. As long as the superintendent has the necessary qualifications and experience to manage safety and quality control responsibilities on-site. Please confirm if the VA will be hiring the commissioning agent directly. 2a. Yes. VA has contract in place with commissioning services. What are the construction hours? Are we able to start as early as 6:00 am? Please confirm any areas that require off-hour work for each phase. 3a. A 6:00am start time is acceptable. Work in all phases can generally be performed during the day M-F. However, per the SOW work that generates significant noise, odor, vibration (e.g. core drilling) and any utility shutdowns that are not localized to just the construction area must be performed off-hours to minimize impact to the facility and without cost-increase to the VA. Are contractors able to provide trailers and/or storage boxes?� 4a. Not at this time Will the VA provide laydown/storage areas? If so, where will they be located?� 5a. There is limited space available on 3rd floor of bed tower. Contractors can also store within the construction zone. Will the VA provide an area for a dumpster? If so, where will that be located?� 6a. Space for a dumpster is not available for the full duration of the project. However, during demolition the COR / station will make every effort to free up space in one of the dock areas - however space is very limited and the dumpster location must be coordinated with the COR to prevent interference with deliveries and pick-ups. Are CAD files available for all of the issued drawings?� Or will they be available after award is made? 7a. CAD files will be made available after award. Reference Specification 010000, Section 1.28 & 29: Please confirm that the photographer must be 3rd party contractor outside of GC s company, or can be performed by GC personnel. It lists Monthly, Weekly, and Regular photographic documentation are we required to have professional photographer provide the monthly? The weekly? And the regular progression photos? There are costs associated with this work, so please clarify specifically. 8a. This spec section is not applicate as this is not a Major construction project. GC personnel are expected to take photographs for daily logs, inspections, RFI etc. But, professional photography is not required. Reference Specification 010000, Section 1.31 Is there a cost for the use of VA Tririga CPMS? Will there be training required or provided for use of this system? Are we able to propose a separate project management software option, if GC provides? 9a. This is not a major construction project, therefore the Tririga CPMS requirement is not applicable. Project Management Software Submittal Exchange to be used - VA will provide the software access (i.e. No cost to the GC / no licensing fee for this software). Please confirm requirements for required onsite personnel when work is being performed. Refer to specifications 013526 and 014000. Is the GC required to have 1 or 2 onsite personnel full time while work is being performed? We interpret that we are required to have (1) SSHO/Safety onsite when work is being performed. Is the (1) QCM as a separate individual, required onsite while work is being performed? Can the QCM also serve as the site superintendent? This affects project costs. Please confirm. 10a. Please see response to question #1. Duties of the SSHO and QCM can be performed by the same person (e.g. the superintendent) provide that person has the necessary qualifications and experience to manage safety and quality control responsibilities on-site. Will the VA be providing a 3rd party commissioning agent for this project? If yes, will they have separate documentation required to be completed prior to project being complete? 11a. See response #2 - Yes, VA will provide commissioning agent. Specification 078400 Firestopping, please confirm that any inspectors of fireproofing are required to be independent 3rd party contractor and ASTM E699 certified. 12a. Yes, contractor to engage a qualified inspector to perform firestop inspections and final reports. V. general information: 1. Additional Instructions to bidders: VAAR 852.219-73 was included in this solicitation and references the SBA certification database at https://veterans.certify.sba.gov/.� However, the website portal at the foregoing link is now static and is no longer being updated as of August 2024.� To be eligible for award, a vendor must be listed as SDVOSB certified in the SBA certification database (under Government Certifications) found at the Dynamic Small Business Search website: � https://dsbs.sba.gov/search/dsp_dsbs.cfm. � � � � � � � ******NOTHING FOLLOWS******
Who won similar work
8 award notices on SAM.gov in the last 24 months. Matched by: Same office (252-NETWORK CONTRACT OFFICE 12 (36C252)), same product/service code (PSC) Z2DA.
Single-winner award sizes (8): middle half $36K to $1.7M, median $522K; range $26K to $4.4M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| TROOP CONTRACTING INC | 2 | $3.9M | Nov 17, 2025 |
| API HVAC SERVICES, INC. | 2 | $64K | Aug 12, 2026 |
| PROGRESSIVE CONSTRUCTION SERVICES LLC | 1 | $4.4M | Apr 4, 2026 |
| PANACEA CONSTRUCTION GROUP LLC | 1 | $802K | Mar 26, 2026 |
| HIRT ELECTRIC, LLC | 1 | $243K | May 21, 2025 |
| FRANKI'S CONCRETE CORP | 1 | $29K | Jan 7, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Aug 12, 2026API HVAC SERVICES, INC.$38KZ2DA--Emergency Water Main Break Sprinkler Feed Bldg. 5/7No listed company matched (Materiality N/A)
- Apr 4, 2026PROGRESSIVE CONSTRUCTION SERVICES LLC$4.4MZ2DA--695-22-117: CN New Audiology Clinic 5BNNo listed company matched (Materiality N/A)
- Mar 26, 2026PANACEA CONSTRUCTION GROUP LLC$802KZ2DA--Install Building Lightning Protection_Construction Project 695-22-106No listed company matched (Materiality N/A)
- Mar 24, 2026API HVAC SERVICES, INC.$26KZ2DA--EMG.Bldg.6 Water Main Break & Valve ReplacementNo listed company matched (Materiality N/A)
- Nov 17, 2025TROOP CONTRACTING INC$1.4MZ2DA--537-24-105 OR Suite Lighting ReplacementNo listed company matched (Materiality N/A)
- Oct 15, 2025TROOP CONTRACTING INC$2.5MZ2DA--Correct Mental Health Safety Deficiencies 537-24-102No listed company matched (Materiality N/A)
- May 21, 2025HIRT ELECTRIC, LLC$243KZ2DA--537-23-102 VMU Equipment Tie-inNo listed company matched (Materiality N/A)
- Jan 7, 2025FRANKI'S CONCRETE CORP$29KZ2DA--EMERGENCY Concrete Work for MRI / SPSNo listed company matched (Materiality N/A)
Competitive landscape
For the 6 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.