Combined Synopsis/SolicitationPosted Jul 13, 2026·Responses due Jul 14, 2026

Building 504 Electrical Outlets

Air Force and Space Force · FA3099 47 CONF CC

Stage
Open solicitation
NAICS
238210
Value
Not stated
Solicitation
FA309926Q0016
Set-aside
Small Business Set Aside - Total
PSC
N061
Place
Laughlin AFB, TX, USA
Contact
Alejandro De Hoyos (alejandro.de_hoyos@us.af.mil)
Loading your pipeline and notes…
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation FA309926Q0016 in this department, oldest first.

Early notice
None posted
Solicitation
  • Jul 10, 2026
    Solicitation
    Open
  • Jul 10, 2026
    Combined Synopsis/Solicitation
    Open
  • Jul 13, 2026
    Combined Synopsis/Solicitation
    Open
  • Jul 13, 2026 · this notice
    Combined Synopsis/Solicitation
  • Jul 18, 2026
    Solicitation
    Open
  • Jul 28, 2026
    Solicitation
    Open
Award
Not yet. Typical award: Aug 16, 2026 to Sep 21, 2026, middle of the range Sep 7, 2026.
Measured from 18 past solicitations at Dept of the Air Force with NAICS 238210 that later posted an award (middle half of cases, counted from Jul 10, 2026).

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

The contractor is responsible for delivering all materials, labor, tools, equipment, transportation, and supervision required to complete the installation in a single phase to minimize facility downtime. All design and construction must comply with Laughlin AFB Division 01 Specifications, Environmental Contractor Technical Specifications, UFC 1-200-01 (DoD Building Code), and NFPA 70 (National Electrical Code). The technical execution requires a Stormwater Pollution Prevention Plan (SWPPP) to manage runoff and eliminate Foreign Object Debris (FOD). Physical works include trenching from the tra… (show all)

nsformer to a distribution rack positioned ten feet behind it, followed by running 160 feet of overhead power lines on three newly installed utility poles (Poles #1, #2, and #3) to B504. These utility poles must not exceed the 28-foot height of the neighboring B502. Hydro trenching is restricted to a ten-foot stretch from the transformer to the rack and a three-foot diameter around each utility pole. The electrical infrastructure demands 180 feet of 2 � inch conduit and properly sized wiring to support six 480-volt weatherproof twist-lock receptacles, complete with dedicated disconnect switches, system grounding, and bonding. The contractor must also coordinate secondary power conduit termination with the Rio Grande Electric Cooperative (RGEC) and assume all associated subcontracting costs. Following installation, the site must be restored, graded, and cleared of rocks larger than three inches. Site visit will be scheduled for 13 July 2026 at 2:00 pm. If you have any questions direct them to the primary point of contacts email. All questions, comments and inquiries will be returned to all those parties that submitted quotes. All quotes must include all costs associated with engineering design, labor, tools, equipment, materials, transportation, installation, testing, and site restoration. All quotes must be accompanied by technical specification sheets for all proposed hardware. *ALL QUOTES MUST BE ON COMPANY LETTERHEAD* *ALL QUOTES MUST REMAIN VALID UNTIL 30 SEPTEMBER 2026* Vendors shall provide: - Itemized pricing breakdown (design, labor, and materials). - Manufacturer name and model numbers for proposed receptacles, disconnects, panels, and conduit. - Lead times for materials and design submittals. - Warranty information (covering materials and workmanship). - Confirmation of ability to meet the 128-day Period of Performance. - Written confirmation that the quote remains firm and valid through 30 September 2026. Note: The selected Contractor will be required to submit physical samples of the weatherproof conduit, weatherproof receptacle boxes, receptacles, cover plates, fasteners, disconnects, and the electrical panel to the Government for review and approval upon award. Funding Availability Release of Solicitations in Advance of Funding Availability Notice to Offeror(s)/Supplier(s): Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. The agency will consider and has the right to award the contract to the vendor whose offer represents the best value to the Government. IAW RFO 2.101, Best Value means the expected outcome of an acquisition that, in the Government's estimation, provides the greatest overall benefit in response to the requirement. Evaluation factors include: - Technical Acceptability: Adherence of design and hardware to commercial-grade and military code standards (NFPA 70/UFC 1-200-01). - Requirement Compliance: Strict adherence to the SOW-specified submittal schedules and construction parameters (including overhead line height limits and hydro-trenching restrictions). - Project Schedule: Feasibility of meeting the 128-day Period of Performance (114 days design/procurement, 14 days construction). - Warranty: Scope and length of warranties provided on electrical components and installation workmanship. - Past Performance: History of successful completion of similar electrical design-build or installation projects. - Total Evaluated Price: Combined price of all design, labor, materials, testing, and GPC fees. Basis for Award The Government intends to award a single firm-fixed-price purchase order to the responsible vendor whose quotation represents the best value to the government. The contracting officer has broad discretion in establishing how quotations will be evaluated. The contracting officer may perform a comparative evaluation of quotations. The evaluation factors are (in descending order of importance): 1. Price: The total evaluated price. 2. Past Performance: The Government will assess the relevance and quality of recent past performance. 3. Technical Approach: The feasibility and clarity of the proposed plan and timeline. Applicable Provisions & Clauses This acquisition is being conducted under RFO 12, treating construction as a commercial service. The following provisions apply: � FAR 52.212-1, Instructions to Offerors�Commercial Products and Commercial Services. � FAR 52.212-4, Contract Terms and Conditions�Commercial Products and Commercial Services. � FAR Part 36, Construction and Architect-Engineer Contracts, and FAR Subpart 22.4, Labor Standards for Contracts Involving Construction (including Davis-Bacon Act requirements) remain applicable to this requirement. The applicable Wage Determination will be incorporated into the awarded purchase order. Due to the Statement of Work (SOW) being locked, the governemrnt will conduct a second site visit on 7/14/2026 at 9:00 am. If you are interested in attanding the site visit please email Alejandro De Hoyos at alejandro.de_hoyos@us.af.mil by close of businress on 7/13/2026.

Who won similar work

46 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Air Force and Space Force), same NAICS 238210.

Single-winner award sizes (46): middle half $103K to $798K, median $299K; range $4K to $66.0M.

WinnerAwardsValueLast
MODERN INTERNATIONAL INC3$49.2MAug 21, 2025
ISCANI INDUSTRIES LLC2$2.7MSep 4, 2026
Ready Power, L.L.C.2$502KOct 14, 2026
AMORSERV LLC2$323KFeb 17, 2026
JJS ELECTRIC INC1$66.0MSep 4, 2025
RANCO CONSTRUCTION INC1$66.0MSep 4, 2025
OK2 CONSTRUCTION, LLC1$66.0MSep 4, 2025
Drew Investment Group, LLC1$1.5MSep 15, 2025
MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC1$1.4MApr 2, 2026
AUTOMATED CONTROL SYSTEMS INC1$1.1MOct 1, 2026

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.

Latest awards

Competitive landscape

For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Air Force, Dept of since 2024 (0 filings)
  • 0 of their lobbyists list a past Air Force, Dept of job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 32 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.