DOS Overseas Furniture Install Services
State · ACQUISITIONS - AQM MOMENTUM
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 19AQMM26R0279 in this department, oldest first.
- Jul 17, 2026SolicitationOpen
- Aug 7, 2026SolicitationOpen
- Aug 13, 2026SolicitationOpen
- Aug 13, 2026SolicitationOpen
- Aug 17, 2026SolicitationOpen
- Aug 18, 2026 · this noticeSolicitation
- Aug 27, 2026SolicitationOpen
- Aug 27, 2026SolicitationOpen
- Aug 27, 2026SolicitationOpen
- Aug 27, 2026SolicitationOpen
- Aug 27, 2026SolicitationOpen
- Aug 27, 2026SolicitationOpen
- Aug 27, 2026SolicitationOpen
- Aug 27, 2026SolicitationOpen
- Sep 9, 2026SolicitationOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
Please see all supporting attachments. You are responsible for reading all attachments. SOW is attached. This is a 100% Small Busines Set A side. You must be designated as a Small Business under NIACS Code 238390 on Sam.gov in order to participate in this solicitation. All requested information is due August 28, 2026 5pm EST. 1.0 GENERAL The Department of State Overseas Buildings Operations Interior Design Division requires overseas furniture installation services. This work includes installation of furniture and furnishings at an indefinite number of US Department of State (DoS) overseas faci… (show all)
lities and may also include performing state-side warehouse trips for inspection of the furniture freight prior to being shipped overseas. There are both secure and non-secure projects with an average project range of 10-200 desks and an average installation time of 1-4 weeks. This is a 100% Small Business �set aside�. The U.S. Government reserves the right to make multiple awards. The exact number of awarded vendors is up to the discretion of the U.S. Government. The U.S. Government may make an award at any time. 2.0 OBJECTIVE The object of this RFI is to identify subject matter expertise of systems furniture installation, furniture project scheduling and coordination services, and furniture-trained labor to DoS overseas facilities for furniture designed and procured by the Department of State, Overseas Buildings Operations, Design and Engineering Office, Interior Design Division (DE/ID) and GA Global Acquisitions 3.0 BACKGROUND Utilizing funds provided by overseas facilities referred to as �Post,� DE/ID specifies, designs, and procures systems furniture using Blanket Purchase Agreements (BPAs) with Allsteel, MillerKnoll, and Haworth and Open Market ancillary furniture. DE/ID provides these services for a variety of post�s requirements including adding additional desks, updating post�s furniture to current standards, or providing for post�s changing departmental functional alignments. DE/ID offers this IDIQ installation contract vehicle to post, utilizing post funds, to provide professional furniture installation services for the removal of the existing furniture and installation of the new furniture. 4.0 TASK OVERVIEW The successful offeror shall provide the basic professional services required to install furniture procured by DE/ID and GA. This work may include additional services such as Quality Control, Product Inventory, and Pre-performance Conference as outlined below. The Contractor shall be responsible for the manpower, training, tools, making of travel arrangements, materials, and coordination and documentation time required to comply with the requirements of this contract. The performance of this contract shall be in accordance with the highest professional standards as set forth in the contract. For each project (task order), the scope of work, period of performance, and deliverable milestones shall be set forth by the Contracting Officer and Contracting Officer�s Representative (COR). In some cases, the task order issued under this contract may include requirements for more than one service for a project. An individual task order could include any or all of the services which are outlined below. The established project milestones may be adjusted and negotiated at each phase to accurately reflect existing and predictable project conditions. Security clearance requirements will be specified for each task. 5.0 SERVICES/TASKS The services required under this contract have been divided into basic and optional services as outlined below. Individual task orders may include any one service or any combination of services. Basic Services Project Review Installation and Close Out Additional Services Quality Control Product Inventory Pre-Performance Conference 5.1 BASIC SERVICES � PROJECT REVIEW Contract Review On a project-by-project basis, the Contractor shall review all documents provided by the GA Global Acquisitions Contract Specialist, the Interior Designer and/or COR to clarify the project specific scope of work required for contract performance. The contractor shall become familiar with the existing contract documents and clarify any questions relating to statement of work, clearance requirements; reimbursable expenses; and logistical concerns. The Contractor shall establish communication protocols with the Contract Specialist, COR and the Interior Designer as the Point of Contact (POC) for the project. Document Review The Contractor shall review all project documents prepared by the Interior Designer, including furniture floor plans, electrical and telecom plans, specifications, and finish samples. The Contractor shall verify quantity take-offs and bills of materials (BOMs) against the floor plans; purchase orders; and packing instructions and shall identify any discrepancies or missing information. Implementation Plan The Contractor shall develop a comprehensive Installation Plan that identifies and coordinates all activities required for project implementation, including required resources (personal, equipment, and materials), sequencing of activities, and integration with power, voice, and data (PVD) installations and other work elements installed by others. Where required, the Installation Plan shall also include a seismic bracing plan. For installations in regions of high seismic risk (as specified in the task order), the Contractor shall develop a detailed plan for bracing and/or anchorage in accordance with Section 6.0. The Contractor shall create a detailed Project Implementation Schedule showing milestone dates, critical path activities, dependencies, proposed personnel deployment dates, and coordination points with Post and other contractors. The Contractor shall confirm and document all post-specific requirements, including Department of State regulations, host?country regulations and conditions, post access and security procedures, working hours, local holidays, and applicable restrictions. The Contractor shall compile a detailed travel and logistics schedule, including the proposed itinerary, work to be accomplished each day, and personnel assignments. The Contractor shall also identify and comply with all equipment and materials shipping requirements. The Contractor shall submit electronic Country Clearance (eCC) requests to the COR at least fourteen (14) calendar days prior to deployment. Earlier submission is strongly encouraged to accommodate potential processing delays. Deliverables The Contractor shall, within the determined time frame as established, transmit the following materials to the COR or project lead for review and approval prior to the next phase: Listing of discrepancies to be submitted within five (5) working days after COR or project lead provides documentation to the Contractor for review. E-mail form. Implementation Plan � including bracing and anchoring plan where required, to be submitted within ten (10) calendar days after COR or project lead provides documentation to the Contractor for review. E-mail form. 5.2 BASIC SERVICES � INSTALLATION AND CLOSE OUT The Contractor shall coordinate the installation schedule with the Contract Specialist, the OBO Interior Designer and the COR, and shall include the On-Site Post Representative (Post Management Officer, General Services Officer, or Facilities Manager) in this coordination. The Contractor shall also coordinate with the Regional Security Officer, if required. The Contractor shall review and comply with all personnel clearance procedures, adhere to secure handling and escort requirements, and follow all post-specific security protocols. The Contractor shall obtain RSO approval before photographing any diplomatic facility. The Contractor shall conduct an initial walk?through with the on?Site Post Representative to identify and document any existing damage, verify site readiness for installation, confirm access to work areas, and identify any site?specific constraints
Who won similar work
15 award notices on SAM.gov in the last 24 months. Match: Same agency (State), same industry group (NAICS 2383).
| Winner | Awards | Value | Last |
|---|---|---|---|
| USG GLOBAL SOURCE LLC | 1 | $8.0M | Oct 26, 2025 |
| ABBATELLI - S.R.L. Roma RM 00185 ITA | 1 | $4.7M | May 5, 2025 |
| EDIL PROJECT S.R.L. Roma RM 00144 ITA | 1 | $4.4M | May 5, 2025 |
| MISCELLANEOUS FOREIGN AWARDEES Washington DC 20405 USA | 1 | $4.1M | Oct 26, 2025 |
| ARAZI ILAN PAINT WORKS Rosh Haayin 4852511 ISR | 1 | $2.8M | Oct 26, 2025 |
| Piperhill Construction Limited | 1 | $501K | Jul 15, 2026 |
| BUILDCARE REPAIRS Suva FJI | 1 | $83K | May 22, 2025 |
| NC Partnerid O� Tallinn EST | 1 | $50K | Jun 20, 2025 |
| BESTI JGUPI LLC | 1 | $48K | Oct 9, 2025 |
| BEN BUILDING ENTERPRISE APS Hedehusene 2640 DNK | 1 | $40K | Aug 27, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Oct 1, 2026ANVIL ENTERPRISES Imus Cavite 4103 PHL$28KExterior Wall Repainting and Roofing Project for the Baguio Residence
- Aug 25, 2026TEAM WESTPOINT LLC$4KWallpaper Install at CMR 50 UN Plaza, New York, NY
- Jul 15, 2026Piperhill Construction Limited$501KPainting Services at Winfield House, London, UK
- Oct 26, 2025USG GLOBAL SOURCE LLC$8.0MResidential Interior Painting Services on behalf of United States Embassy in Jerusalem Israel
- Oct 26, 2025ARAZI ILAN PAINT WORKS Rosh Haayin 4852511 ISR$2.8MResidential Interior Painting Services on behalf of United States Embassy in Jerusalem Israel
- Oct 26, 2025MISCELLANEOUS FOREIGN AWARDEES Washington DC 20405 USA$4.1MResidential Interior Painting Services on behalf of United States Embassy in Jerusalem Israel
- Oct 10, 2025PARQUET SERVICE GE Tbilisi GEO$36KFinished Engineered Hardwood Flooring for US Embassy Tbilisi
- Oct 9, 2025BESTI JGUPI LLC$48KSolicitation for Installation of Poured Terrazzo Flooring
- Aug 27, 2025BEN BUILDING ENTERPRISE APS Hedehusene 2640 DNK$40KResidential Window Replacements X17017
- Aug 13, 2025VAVILON-GRUP TOV Kiev 03179 UKR$19KFENCING REPAIR AND REPAINTING AT THE U.S. EMBASSY KYIV COMPOUND
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied State, Dept of (DOS) since 2024 (0 filings)
- 0 of their lobbyists list a past State, Dept of (DOS) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 33 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.