FY26 Installation of New 3-Phase Primary Underground Electrical Service Ellington Field, TX
Army · W7N2 USPFO ACTIVITY TXANG 147
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation W50S77-26-Q-A001 in this department, oldest first.
- Jun 25, 2026Combined Synopsis/SolicitationOpen
- Jul 1, 2026Combined Synopsis/SolicitationOpen
- Jul 2, 2026Combined Synopsis/SolicitationOpen
- Jul 9, 2026Combined Synopsis/SolicitationOpen
- Jul 16, 2026 · this noticeCombined Synopsis/Solicitation
- Jul 21, 2026Combined Synopsis/SolicitationOpen
- Jul 23, 2026Combined Synopsis/SolicitationOpen
- Sep 23, 2026Combined Synopsis/SolicitationOpen
- Sep 23, 2026Combined Synopsis/SolicitationOpen
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
7/16/26: Issued Amendment 0002 to extend the due date to 24 JUL 2026; revise Section 01 00 00 paragraph 24.2; Replace Statement of Work; and incorporate Questions & Answers. See attachments to this posting. 7/9/26: Added the 7/8/26 pre-quote site visit slides and sign in sheet as attachments to this posting. 7/2/26: Issued Amendment 0001 to extend the due date to 17 JUL 2026 and attach Identifier 0002 (2020 Utility Drawings) and Identifier 0003 (2019 Site Photos) in Section 00 01 15. See attachments to this posting. 7/1/26: Added the 7/1/26 pre-quote site visit slides and sign in sheet as atta… (show all)
chments to this posting. Notice ID: W50S77-26-Q-A001 Notice Type: Combined Synopsis/Solicitation Notice Issue Date: June 25, 2026 Date for Receipt of Responses: July 15, 2026 at 4:00pm CDT Contracting Office: United States Property & Fiscal Office - Texas Air National Guard Title: FY26 Installation of New 3-Phase Primary Underground Electrical Service Project Number: FWJH262710 Location: Ellington Field Joint Reserve Base,14657 Sneider Street, Houston, Texas 77034 Category: N � Installation of Equipment NAICS: 238210 � Electrical Contractors and Other Wiring Installation PSC: N061 � Installation of Equipment � Electric Wire and Power Distribution Equipment Magnitude: Between $25,000.00 - $50,000.00 Set Aside: Total Small Business Set-Aside Combined Synopsis/Solicitation Number W50S77-26-Q-A001 is issued as a request for quotation (RFQ) for the replacement of the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base, Houston, TX. This project is required to restore reliable electrical service to the mobile shooting range and return the facility to full operational capability in support of training and mission readiness. This is a combined synopsis/solicitation for commercial services prepared in accordance with Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. The Government intends to award a Firm Fixed Price (FFP) purchase order resulting from this RFP to the responsible vendor whose quote conforms to the RFQ and is most advantageous to the Government considering only price and price related factors. Solicitations, information notices, and amendments for this RFQ will be posted at https://sam.gov. Scope of Work: The project includes all labor, parts, tools, plant, equipment, appliances, transportation, materials, and supervision necessary to replace the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base as specified in the attached Statement of Work. The purchase order duration will be 60 days after notice to proceed to include inspection and punch list. Pre-Quote Conference/Site Visit: We are offering two sessions of the pre-quote conference and site visit. See the RFQ Section 00 21 00 � Instructions for details. Due Date: Quotes are due via email to carrie.a.mckay2.civ@army.mil and david.m.best.civ@army.mil by the date and time indicated in block 13 of the RFQ (Standard Form 1442 � Solicitation, Offer, and Award). Your attention is directed to Revolutionary FAR Overhaul (RFO) clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states; By submission of an offer and execution of a contract (purchase order), the Contractor will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor�s 85 percent subcontract amount that cannot be exceeded. In accordance with RFO FAR 36.101-4, the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at Revolutionary FAR Overhaul (RFO) 43.304, DFARS RFO Deviation 243.304 and AFARS 5143.304. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements. DISCLAIMER: The official plans and specifications are located on https://sam.gov, and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the quoter�s responsibility to check the website periodically for any amendments to the solicitation. The Government will not compensate for costs incurred in preparation of quotes. Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a quoter's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
Who won similar work
6 award notices on SAM.gov in the last 24 months. Matched by: Same agency (Army), same product/service code (PSC) N061.
Single-winner award sizes (6): middle half $74K to $6.2M, median $220K; range $47K to $45.4M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| YELLOWSTONE ELECTRIC CO Billings MT 59101 USA | 1 | $45.4M | Mar 20, 2025 |
| KOONTZ ELECTRIC COMPANY | 1 | $8.2M | Sep 23, 2025 |
| ADJOINER CORPORATION | 1 | $298K | Aug 12, 2026 |
| MILLERCO, INC. | 1 | $142K | Sep 25, 2026 |
| COLLRICH, LLC | 1 | $52K | Jun 3, 2025 |
| WILLIAMS DIVERSIFIED LLC | 1 | $47K | Sep 23, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in. Revenue next to a ticker is the company's last annual revenue from its 10-K.
- Sep 25, 2026MILLERCO, INC.$142KMSANG CRTC 125kW Generator and ATS
- Sep 23, 2026WILLIAMS DIVERSIFIED LLC$47KFY26 Installation of New 3-Phase Primary Underground Electrical Service Ellington Field, TX
- Aug 12, 2026ADJOINER CORPORATION$298KVindicator Upgrade.
- Sep 23, 2025KOONTZ ELECTRIC COMPANY$8.2M15kV Switchgear Replacement
- Jun 3, 2025COLLRICH, LLC$52KEOC Improvement
- Mar 20, 2025YELLOWSTONE ELECTRIC CO Billings MT 59101 USA$45.4MWolf Creek GSU Replacement
Competitive landscape
For the 6 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.