CYLINDER,PUMP
NAVSUP (Naval Supply Systems Command) · NAVSUP WEAPON SYSTEMS SUPPORT MECH
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation N0010426QFC81 in this department, oldest first.
- Mar 13, 2026 · this noticeSolicitation
- Oct 22, 2026SolicitationView
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
CONTACT INFORMATION|4|N743.30|N/A|N/A|SCOTT.R.YOUNGBLOOD2.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO|N/A|TBD|TBD|TBD|TBD|TBD|TBD|TBD|N/A|N/A|N/A|N/A|N/A|N/A|N/A| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BAS… (show all)
IC (DEV 2026-O0037)(FEB 2026))|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Any contract awarded as a result of this solicitation will beDO rated order national defense use under the Defense Priorities andAllocations System (DPAS). 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the CYLINDER,PUMP . 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;PL-D-4527 63857 M B; 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.3 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| |01| 3. REQUIREMENTS 3.1 Design, Manufacture, and Performance - Except as modified herein, the item furnished under this contract/purchase order must meet the design, manufacture, and performance requirements specified on CAGE ;63857; Drawing ;PL-D-4527 find number 1; . 3.2 Marking - This item must be physically identified in accordance with MIL-STD-130. 3.3 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government inelectronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.3.1 Waivers/Deviations - Waivers and Deviations must be designated as Critical, Major, or minor. All waivers and deviations require review and approval bythe Contracting Officer. A copy of approved waivers and deviations with related OQE must be submitted via WAWF as part of the entire OQE package. (SOC MCD C material requires both approved and disapproved waivers and deviations be submitted) Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to theoperational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.3.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.3.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of theproduct. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineeringchange. 3.4 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 4. QUALITY ASSURANCE 4.1 Notes to the Contractor - 4.1.1 The Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. The departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 The Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A record of these departures, traceable to the applicable part number and contract number must be submitted to the PCO. 4.1.3 The Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 The Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions, and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in
Who won similar work
4 award notices on SAM.gov in the last 24 months. Matched by: Same office (NAVSUP WEAPON SYSTEMS SUPPORT MECH), same product/service code (PSC) 4320 and NAICS 333914.
Single-winner award sizes (4): middle half $135K to $855K, median $498K; range $53K to $920K.
| Winner | Awards | Value | Last |
|---|---|---|---|
| CARVER PUMP COMPANY | 2 | $973K | May 6, 2026 |
| Parker-Hannifin Corportaion Irvine CA 92618 USA | 1 | $833K | Jun 8, 2026 |
| S I T CORPORATION | 1 | $162K | Jul 31, 2025 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
- Jun 8, 2026Parker-Hannifin Corportaion Irvine CA 92618 USA$833KPUMP,ROTARYNo listed company matched (Materiality N/A)
- May 6, 2026CARVER PUMP COMPANY$53K43--PUMP UNIT,CENTRIFUG-IN REPAIR/MODIFICATION OFNo listed company matched (Materiality N/A)
- Dec 17, 2025CARVER PUMP COMPANY$920KPUMP UNIT,CENTRIFUGNo listed company matched (Materiality N/A)
- Jul 31, 2025S I T CORPORATION$162K61--CONTROLLER, IN REPAIR/MODIFICATION OFNo listed company matched (Materiality N/A)
Competitive landscape
For the 3 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Navy, Dept of or U.S. Marines since 2024 (0 filings)
- 0 of their lobbyists list a past Navy, Dept of or U.S. Marines job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.