Loading the records…
Loading the records…
Army Corps of Engineers · W072 ENDIST LOUISVILLE
Army Corps of Engineers is planning to buy "Sources Sought / Market Intelligence: Multi-Projects for Air Force Reserve Command (AFRC) Program - Construction Management at Risk (CMAR) utilizing Other Transaction Authority (OTA)". This is an early notice: it is not taking bids yet. The original due date (Oct 14, 2026) has passed; check the latest amendment for the current one. In the last 2 years, similar work went to 10 or more companies, usually for about $13.0M per award. An award is expected between January 2027 and June 2027.
Put together from the facts on this page; the details and sources are below.
Your briefs and their views: My briefs.
Every notice posted under solicitation W912QR-CMAR-AirForceReserveMultipleProjects in this department, oldest first.
Standard steps for the notice type; not advice about this buyer.
ll not affect a firm�s ability to submit a proposal or bid should a formal solicitation or project announcement be issued in the future. North American Industry Classification System (NAICS) Code: 236220 � Commercial and Institutional Building Construction and 237310 � Highway, Street and Bridge Construction. (Note: While Other Transaction Authority is not governed by Federal Acquisition Regulation (FAR)-based small business set-aside regulations, this NAICS code is provided for market research purposes to assist the Government in understanding the industrial base demographics and capability.) Small Business Size Standard: $45.0 Million _______________________________________________________________ PROGRAM & PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Louisville District, is conducting market intelligence to assess industry interest, capability, and commercial best practices for delivering multiple military construction (MILCON) / sustainment projects for the Air Force Reserve Command (AFRC) program utilizing Construction Management at Risk (CMAR) executed under Other Transaction Authority (OTA) pursuant to Title 10, United States Code (U.S.C.) Section 2808a. The Louisville District intends to award six separate, standalone OT agreements (one per project), while using this consolidated RFI to survey industry capacity and interest in CMAR with OTA across multiple projects within the Air Force Reserve portfolio. The projects under evaluation include: Project 1: Mass Parking Apron (MPA) Paving Rows C&D � Grissom Air Reserve Base, Indiana Estimated Acquisition Magnitude: $35,000,000 � $45,000,000 Scope of Work Summary: Correct approximately 9.6 acres of failing Mass Parking Apron paving through full-depth Portland cement concrete pavement replacement to support KC-135 and KC-46 aircraft operations at Grissom Air Reserve Base (ARB), Indiana. Due to the required concrete volume, the project requires an on-site concrete batch plant. The project also includes partial replacement of existing storm-drainage utilities supporting the apron. Current Design Status: The design is 65% complete. The Designer of Record is working toward a 95% design deliverable in October 2026. Anticipated CMAR Entry Point: ~95% Design Project 2: Combined Operations Facility Niagara Falls Air Reserve Station, New York Estimated Acquisition Magnitude: $35,000,000 � $50,000,000 Scope of Work Summary: Construct a new two-story, 54,000 square foot facility to consolidate the 914 Operations Group functions, including the 914 Operations Group Staff, 914 Operations Support Squadron (with Aircrew Flight Equipment), 328th Air Refueling Squadron, and 914th Aeromedical Evacuation Squadron. The facility will provide administrative, operational, training, and support spaces to include a command suite, crew readiness areas, kitchen/dining and sleeping quarters for 10 alert aircrew, fitness and locker facilities, flight planning, SERE, night vision device maintenance, mobility operations, weather, secured briefing rooms, and a multi-use auditorium, along with shared conference, break, and storage spaces. The project includes a reinforced concrete foundation with spread footings, reinforced masonry walls with brick veneer, structural steel framing, standing seam metal roof, elevator, emergency generator, fire protection, mass notification, communications, exterior lighting, and all supporting utilities. Site improvements will include access roads, parking, sidewalks, and stormwater management. The facility is located along the airfield and potential PFAS-contaminated soil, and groundwater may be encountered and require testing for appropriate management and disposal during construction. Current Design Status: The design is 100% complete (Certified Final) but requires a Unified Facilities Criteria (UFC) refresh. Anticipated CMAR Entry Point: ~95% Design Project 3: Renovate Fuel Cell Hangar, Building 647� Patrick Space Force Base, FL Estimated Acquisition Magnitude: $18,000,000 � $30,000,000 Scope of Work Summary: The Government requires comprehensive repair and renovation of Fuel Cell Hangar Building 647 to restore full operational capability in support of aircraft fuel cell maintenance activities. The work encompasses the hangar bay, associated maintenance areas, and administrative spaces. The project includes testing for hazardous materials and appropriate abatement where required. Exterior work includes full roofing system replacement (including gutters and downspouts), replacement of louvers and windows, reskinning of the hangar exterior with insulated panels, major repairs to hangar doors and top rails, replacement of roll-up doors (including the aircraft tail rudder door), replacement of exterior man doors, repair of the exterior stairway, and replacement of the lightning protection system. Interior work includes reconfiguring the first and second floor administrative spaces to meet user requirements and standards, including a breakroom and conference room on the second floor. Major building systems requiring repair or replacement include heating, ventilation, and air conditioning; electrical distribution and related components; fire protection and suppression systems (including removal of existing foam systems and installation of a code-compliant replacement); communications infrastructure; provide a new fire alarm/mass notification system, and all associated control systems. Site preparation, utility connections, and related support work are also included. All work shall be performed in accordance with applicable Unified Facilities Criteria, National Fire Protection Association standards, and installation requirements. Sustainable design and construction practices consistent with current Department of Defense guidance will be incorporated. Current Design Status: The design is 65% complete. Anticipated CMAR Entry Point: ~95% Design Project 4: Communications Facility � Pittsburgh Air Reserve Station, PA Estimated Acquisition Magnitude: $15,000,000 � $30,000,000 Scope of Work Summary: Construction of a new 11,615 SF facility to support the mission of the 911th Communications Squadron. Construction to include concrete foundation and floor slab, steel frame, roof, CMU or metal stud backup, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air-conditioning, electrical and communications systems, emergency generator, delivery and storage area, and supporting utility infrastructure. The project will include demolition of the existing facility with exception of the demarcation room and construct sidewalks and horizontal assets. Due to cost and the Growth Off Set Policy, the demolished facility will be replaced with one of equal size. Facilities will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01. Sustainable principles, to include life-cycle cost effective practices will be integrated with the design, development and construction of the project in accordance with Unified Facility Criteria 1-200-02. This includes preparation of life-cycle cost analysis for energy consuming systems, renewable energy generating systems. This project will comply with the Department of Defense antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Current Design Status: The des
46 award notices on SAM.gov in the last 24 months. Matched by: Same office (W072 ENDIST LOUISVILLE), same NAICS 236220.
Single-winner award sizes (46): middle half $6.6M to $22.1M, median $13.0M; range $95K to $134.4M.
| Winner | Awards | Value | Last |
|---|---|---|---|
| Howard W. Pence, Inc. | 4 | $30.4M | Sep 30, 2026 |
| Butt Construction Company | 4 | $23.9M | Sep 24, 2025 |
| BENAKA, INC. | 2 | $42.8M | Jan 15, 2026 |
| Gideon Contracting, Limited | 2 | $12.7M | Sep 18, 2025 |
| T & T CONSTRUCTION ENTERPRISES, LLC | 2 | $502K | Oct 1, 2026 |
| Harper Construction Company | 1 | $134.4M | Sep 18, 2025 |
| MESSER CONSTRUCTION CO Cincinnati OH 45203 USA | 1 | $82.5M | Sep 21, 2026 |
| J. E. DUNN CONSTRUCTION COMPANY | 1 | $54.8M | Sep 19, 2025 |
| BL HARBERT INTERNATIONAL LLC | 1 | $46.0M | Nov 19, 2025 |
| COX CONSTRUCTION CO Vista CA 92081 USA | 1 | $36.6M | Mar 19, 2026 |
Value counts new single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling (same contract, or the same office, day and amount); that ceiling is not one company's win, so it is not added in. Contract modifications are not new awards and are not added in either. Notices whose amount is a placeholder such as $999,999,999 are not added in. Revenue next to a ticker is the company's revenue over the latest 12 months in its SEC filings.
Materiality: one award's value as a share of the winner's revenue over the latest 12 months in its SEC filings (or its last fiscal year, as noted when you point at it). Low under 1%, Medium 1 to 5%, High 5% or more. Many awards are paid over several years, so this overstates a single year's share.
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
None of these past winners filed lobbying reports naming Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024. No sign of an incumbent lobbying push at this agency.
No lobbyist on these filings lists a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job: no revolving-door tie found in these filings. (These are lobbyists the companies pay, not their own staff.)
None of these winners matched a listed company, so PAC and FARA checks did not run.
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
No bills named on these filings under Army Corps of Engineers-related issues.
A bill's title is shown only when the filing's own text names it; filings often cite last Congress's bill numbers.
No executive order in the last 12 months names Army Corps of Engineers in its title or summary.
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards. A sale marked 10b5-1 was made under a trading plan set up in advance.
None of the past winners matched a listed company.
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name, including the subsidiaries a company lists in its SEC filings. A company we could not match shows no market rows; that is a miss, not a finding.