DY-BO131-4P -Renovate Facades, Replace Windows/Doors & Repair Drainage of Bldgs. #8404 & #8405, Baumholder MILCOM
Army · 0409 AQ HQ CONTRACT
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation DY-BO131-4P in this department, oldest first.
- Jul 23, 2026Pre-solicitationOpen
- Jul 29, 2026 · this noticePre-solicitation
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Answer the notice: this is when the requirement can still be shaped.
- Contact the contracting officer named on the notice.
- Check who won similar work; they are the likely bidders.
What the notice says
Solicitation Synopsis: Renovate Facades, Replace Windows/Doors & Repair Drainage of Bldgs. #8404 & #8405 This Synopsis is issued to meet the requirements in FAR Subpart 5.101 Presolicitation Notice and FAR Subpart 14.211 Two-Step Sealed Bidding. (i) Description of the supplies or services required The U.S. Army, 409th Contracting Support Brigade (409th CSB), intends to award a Firm-Fixed-Price, single award contract for the Renovation of Facades, Replacement of Windows/Doors, and Repair of Drainage at Buildings #8404 and #8405 (Project DY-BO131-4P) at the Baumholder Military Community, Germany… (show all)
. Services required include the restoration of the building facades and natural stone masonry to mitigate water infiltration, replacement of exterior windows and doors, minor roof repairs, and upgrades to external infrastructure (drainage, walkways, and lighting). (ii) Statement of intent to use the two-step method This solicitation and resulting contract are utilizing a Two-Step Sealed Bidding procurement method as described in FAR Part 14.211. Step One is a request for technical proposals only, and offerors determined to be acceptable will be notified of Step Two via receipt of the Invitation for Bid (IFB) solicitation document. (iii) Requirements of the technical proposal The technical proposal must include at least the following: Set up so that no additional explanations and information are required. Indication of the applied German Institute for Standardization, or Deutsches Institut f�r Normung (DINs), Regulations and Standards. Sketches/Drawings, if necessary. Submitted in English. Provided in electronic PDF format. Provide all information/documents requested in the technical evaluation criteria. (iv) Evaluation criteria, including all factors and any significant subfactors Proposals will be evaluated to be "Acceptable", "Reasonably susceptible of being made acceptable", or "Unacceptable" based on the following technical criteria: FACTOR 1: Offerors shall show method of accomplishment and materials to be used. Offerors must submit a copy of specifications and materials proposed, describing how the project will be accomplished as required by the SOW. Proposed materials and methods must meet or exceed minimum applicable DIN standards for Civil Work (B3), Architectural Work (B4), Electrical Work (B5), and Engineering Services (B6). FACTOR 2: Offerors shall provide a Progress Schedule outlining the plan to meet the 365 calendar day delivery time for all specification requirements, including the timeframe for deliverables, materials possession, preparation, mobilization dates, and planned sequence of work. FACTOR 3: Offerors shall provide documentation, specifically one copy of their Certificates for doing business in Germany, authorizing the firm to conduct business in Germany (e.g., Handwerkskammer or IHK registration). FACTOR 4: Past Performance & SPRS Evaluation. Offerors must demonstrate a record of satisfactory past performance. (v) Statement regarding prices or pricing information The submission requirements of Step One, Request for Technical Proposal, shall not include any prices or pricing information. Technical Proposals MUST NOT include prices. For awareness of the pricing structure that will apply during Step Two (Invitation for Bid): Currency: All proposed prices must be submitted in EURO only. Price Evaluation: The Total Evaluated Price (TEP) will be calculated as the sum of CLIN 0001 (Base Bid - Bldg. 8404) and CLIN 0002 (Additive Item - Bldg. 8405). Award Criteria: The Government intends to make a single contract award for the Base Bid (CLIN 0001) and the Additive Item (CLIN 0002) to the responsible bidder who submits the lowest responsive, aggregate bid for both CLINs. However, in the event that the lowest aggregate bid exceeds available funding, or if funding is reduced at the end of the fiscal year, the Government reserves the right to make an award for the Base Bid (CLIN 0001 - Building 8404) only. (vi) Date and hour by which the technical proposal must be received The closing date for the technical proposals is currently listed as TBD. Proposals must be sent via email to the addresses specified in the solicitation handout (andre.carvalhodossantos.ln@army.mil and brandon.m.donalson.civ@army.mil). If no exact time is specified in the eventual IFB, the time for receipt is 4:30 p.m., local time. (vii) Statement regarding the second step (A) In Step Two, only bids based upon technical proposals determined to be acceptable, either initially or because of discussions from Step One, will be considered for award. (B) Each bid in Step Two must be based on the bidder's own technical proposal that was submitted, evaluated, and determined to be acceptable in Step One. (viii) Statement regarding acceptability and further information (A) Bidders should submit technical proposals that are acceptable without additional explanation or information. (B) The Government may make a final determination regarding a technical proposal's acceptability solely on the basis as submitted. (C) The Government may proceed with the second step without requesting further information from any bidder; however, the Government may request additional information from bidders of bids that it considers "reasonably susceptible of being made acceptable" and may discuss bids with their bidders. (ix) Statement regarding notice of unacceptability If the Government finds a technical proposal unacceptable during evaluations, a notice of unacceptability will be forwarded to the offeror upon completion of the technical evaluation. (x) Statement regarding multiple technical proposals Bidders are welcome and encouraged to submit multiple technical proposals presenting different basic approaches. Each technical proposal submitted will be separately evaluated, and the submitter will be notified as to its acceptability (see FAR 52.214-24). (1) Points of Contact: Contract Specialist: Andre Carvalho dos Santos (Email: andre.carvalhodossantos.ln@army.mil) Contracting Officer: Brandon Donalson (Email: brandon.m.donalson.civ@army.mil)
Who won similar work
549 award notices on SAM.gov in the last 24 months. Match: Same agency (Army), same NAICS 236220.
| Winner | Awards | Value | Last |
|---|---|---|---|
| BL HARBERT INTERNATIONAL LLC | 7 | $1.1B | Aug 3, 2026 |
| K2 CONTRACTING GROUP, LLC | 6 | $2.6M + 2 shared | May 29, 2026 |
| Gideon Contracting, Limited | 5 | $514.9M + 1 shared | Sep 30, 2025 |
| ACC CONSTRUCTION CO., INC. | 5 | $493.2M | Aug 27, 2026 |
| FEDERAL CONTRACTING INC | 5 | $348.3M | Aug 18, 2026 |
| CONTI FEDERAL SERVICES, LLC | 5 | $257.3M | Oct 2, 2026 |
| EVERGREEN CONTRACTORS LLC | 5 | $8.5M | Sep 18, 2026 |
| YEAJIN E&C CO.,Ltd. | 5 | $4.4M | Jul 23, 2026 |
| All American AA LLC | 5 | $768K | Aug 24, 2026 |
| TREND CONSTRUCTION INC | 4 | $172.5M | Jul 15, 2025 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Oct 16, 2026SUSTECH LLC$17.5MInvitation for Bid: Army National Guard Military Construction, Engineering/Housing Maintenance Shop, Camp Santiago, Salinas, PR
- Oct 13, 2026PORR Government Services GmbH Kaiserslautern 67657 DEU$49.0MAward for DHA Minor Construction SATOC in Germany, Belgium, and Italy
- Oct 8, 2026GRUNLEY CONSTRUCTION CO., INC.$18.1MRepair East Runway, Mill and Overlay North Half, Joint Base Andrews, MD
- Oct 8, 2026JV SKE GROUP AM SAGEWERK 10 GOLDBACH 63773 DEU$50.0MDODEA MINOR CONSTRUCTION SATOC
- Oct 5, 2026WAYNE CONTRACTING COMPANY$93KRestroom Repair (MOF)
- Oct 2, 2026CONTI FEDERAL SERVICES, LLC$109.9MHangar/Aircraft Maintenance Unit at Davis-Monthan Air Force Base, Arizona
- Oct 1, 2026BUILDZ, LLC$38.0MBLDG 212 Fort Stewart GA OTA
- Oct 1, 2026COAKLEY & WILLIAMS CONSTRUCTION, LLC. 4500 EAST WEST HWY STE 500 BETHESDA MD 20814 USA$57.8MROCKET MISSILE MAINTENANCE FACILITY (RMMF) LETTERKENNY ARMY DEPOT (LEAD) PRECISION STRIKE MISSILE SYSTEM (PRSM) AND COMMERCIAL VEHICLE ACCESS CONTROL POINT (ACP)
- Oct 1, 2026TST TACTICAL DEFENSE SOLUTIONS, INC.$3.4MRHS HVAC Replacement ERVD172002
- Oct 1, 2026T & T CONSTRUCTION ENTERPRISES, LLC$233KNolin River Lake Tailwater Restroom Construction
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard since 2024 (0 filings)
- 0 of their lobbyists list a past Army, Dept of (Corps of Engineers) or Army, Dept of (Other) or Natl Guard job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 32 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.