Z1DA--556-24-113 Oil Transformer and Switch Enclosure Upgrades
Veterans Affairs · 252-NETWORK CONTRACT OFFICE 12 (36C252)
Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.
Where this opportunity stands
Every notice posted under solicitation 36C25226B0029_0001 in this department, oldest first.
- Aug 21, 2026 · this noticeSolicitation
Next steps for this stage
Standard steps for the notice type; not advice about this buyer.
- Decide bid or no bid before the response deadline.
- Look at the past winners for likely competitors and teaming partners.
- Follow the opportunity to hear about amendments and the award.
What the notice says
CONSTRUCTION STATEMENT OF WORK Date: September 13, 2025 Project Number: 556-24-113 Project Name: Oil Transformer and Switch Enclosure Upgrade (GC) Location: Captain James A. Lovell FHCC 3001 Green Bay Rd, North Chicago, IL 60064 Part 1: Project Scope of Work Overview: Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project. Replace medium voltage oil-filled transformers that serve the following buildings on the James A. Lovell FHCC campus: 1, 3, 9, 11, 66, 137 and 187. Transformers… (show all)
have 4160 volt primary and 208/120 volt secondary. There are (4) transformers rated for 150 KVA, (2) transformers rated for 300 KVA and (1) transformer rated for 750 KVA. The 150 KVA transformer at building 3 will need to be relocated as well. Replace the electrical distribution switchboard at building 137. Replace the electrical distribution switchboard at building 3. Replace concrete pads for medium voltage oil filled transformers at buildings 9, 66, and 187. New transformer location at building 3 requires a new concrete pad as well. Install anti-ram rated bollards at all transformers. Part 2: Period of Performance: The following model presents the summary logic of the milestone sequence working backward from the delivery date of the longest lead time in the critical path to determine a mobilization date, and then forward from the delivery date of the longest lead time to completion of all work. Listed milestones and phases (calendar days): Notice To Proceed Day 0 Division 01 Submissions Completed Day 14 Division 01 VA Reviews Day 35 Division 02+ Submissions Day 50 Division 02+ VA Reviews Day 71 Longest Lead Item Procurement Day 72 (GC to determine and submit) VA review and GC revise schedule Day 93 Mobilize and Demo Day 94 (If all pre-construction submittals were approved) Pre-Longest Lead Item Construction Day 214 (GC to determine) Longest Lead Item Delivery Date Day 215 (GC to determine) Post Long-Lead Item Construction Day 335 (GC to determine) Construction Complete and Closeouts approved Day 356 Closeout (Contract end date) Day 357 Total: 357 days reflects an example workup of the plan. GC must submit the factory ship date commitment to VA and revise the Baseline Schedule to work forward and backward from that date to optimize the time in field (disruption of customer and reduction of GC costs). Part 3: Detailed Project Requirements: Project Objectives: Contractor is required to expedite planning and execution of this work, enabling the work to start and continue without interruptions caused by failure to procure long lead equipment and plan around the delivery dates This project is required to enable compliant and safe conditions for maintenance of electrical systems. GC and their consulting engineer to plan and execute a robust quality assurance plan and safety plan to prevent time and rework losses. List of AE Documents to be included in this Contract: See: 00 01 10 Table of Contents and the entire Project Manual See: 00 01 15 List of Drawing Sheets and the entire volume of drawings Pre-Bid Conference: VA shall schedule one pre-bid conference to be attended by prospective bidders to observe current conditions within the work area(s). Do not expect additional events to occur. The AE shall not attend the pre-bid event. No questions will be allowed during the event. All questions by all prospective contractors shall follow the RFI process described in the Solicitation. Prospective bidders shall not attempt to contact the AE or VA facilities engineering staff during the solicitation and bidding period. The AE and VA facilities engineering staff are instructed to ignore all such inquiries and report them to the VA Contracting Officer. All inquiries regarding this project shall be presented as complete and coherent Requests for Information (RFI) specifically citing design or specification sections, pages, paragraphs, notes, details, etc. to enable responses to RFI s. Follow the instructions provided by the Contracting Officer within the Solicitation regarding submission of RFI s. VA will post responses developed to enable all prospective bidders to receive the same information at the same time.
Who won similar work
11 award notices on SAM.gov in the last 24 months. Match: Same office, same NAICS 238210.
| Winner | Awards | Value | Last |
|---|---|---|---|
| PANACEA CONSTRUCTION GROUP LLC | 2 | $3.2M | Sep 14, 2026 |
| U.S. VET GENERAL CONTRACTING, LLC | 2 | $3.0M | Sep 21, 2026 |
| VETERANS ELECTRIC LLC | 1 | $8.5M | Sep 24, 2026 |
| VALLEY MECHANICAL INC | 1 | $4.0M | Apr 9, 2026 |
| KISH & SONS ELECTRIC INC | 1 | $1.5M | Sep 15, 2026 |
| J3 ENTERPRISE LLC | 1 | $682K | Jul 28, 2026 |
| ELECTRICAL SYSTEMS MANAGEMENT, LLC | 1 | $436K | Aug 11, 2026 |
| BRYANT POWER SOLUTIONS L.L.C GRAND BLANC 48439 | 1 | $320K | Sep 15, 2025 |
| N-OVATION TECHNOLOGY GROUP LLC | 1 | $306K | Feb 2, 2026 |
Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.
- Sep 24, 2026VETERANS ELECTRIC LLC$8.5MZ1DZ--695-22-123 Upgrade N Campus Medium Voltage Feeders
- Sep 21, 2026U.S. VET GENERAL CONTRACTING, LLC$399KZ1DA--B406 AHU to Emergency Power 676-22-108
- Sep 15, 2026KISH & SONS ELECTRIC INC$1.5MEmergency Electric Panel Repair Service.
- Sep 14, 2026PANACEA CONSTRUCTION GROUP LLC$2.4MZ1DA--550-23-104 Install Rooftop PV Multiple Buildings (CON)
- Aug 11, 2026ELECTRICAL SYSTEMS MANAGEMENT, LLC$436KJ059--Panel Maintenance & Survey
- Jul 28, 2026J3 ENTERPRISE LLC$682KJ065--VFD Maintenance
- Apr 9, 2026VALLEY MECHANICAL INC$4.0MZ1DA--585-25-103 - Upgrade Facility Generator Controls Construction (VA-26-00020767)
- Mar 26, 2026PANACEA CONSTRUCTION GROUP LLC$802KZ2DA--Install Building Lightning Protection_Construction Project 695-22-106
- Feb 2, 2026N-OVATION TECHNOLOGY GROUP LLC$306KJ059--Maintenance for Satellite TV System
- Sep 15, 2025BRYANT POWER SOLUTIONS L.L.C GRAND BLANC 48439$320KJ061--Inspect, Test and Adjust Electrical System/Arc Flash Hazard Analysis
Competitive landscape
For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.
- 0 of these past winners lobbied Veterans Affairs, Dept of (VA) since 2024 (0 filings)
- 0 of their lobbyists list a past Veterans Affairs, Dept of (VA) job
- No corporate PAC money from them to the overseeing committees since 2024
- 0 foreign-agent (FARA) registrations
Policy around it
Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.
- 0 bills named on the past winners' lobbying filings
- 25 rules from the department in the last 12 months
- 0 executive orders naming the agency in the last 12 months
Market
For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.
- 0 of the past winners are listed companies
- 0 insider buys and 0 insider sells at them in the last 90 days
Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.
Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.