SolicitationPosted Aug 19, 2026·Responses due Sep 8, 2026

Conex Refurbishment, Officer Training School (OTS), Maxwell AFB

Air Force and Space Force · FA3300 42 CONS CC

Stage
Open solicitation
NAICS
238350
Value
Not stated
Solicitation
FA330026P0819
Set-aside
None stated
PSC
J054
Place
AL, USA
Contact
Katrice Perry Barganier (Katrice.barganier@us.af.mil)
CSV Email

Capture briefs (a one-page, shareable copy of this page) are part of Pro. The CSV here holds the notice, its timeline and past awards.

Where this opportunity stands

Every notice posted under solicitation FA330026P0819 in this department, oldest first.

Early notice
None posted
Solicitation
  • Aug 19, 2026 · this notice
    Solicitation
  • Aug 31, 2026
    Solicitation
    Open
  • Sep 8, 2026
    Solicitation
    Open
Award
Not yet. Typical award: Sep 17, 2026 to Nov 11, 2026, middle of the range Oct 10, 2026.
Measured from 688 past solicitations at Dept of the Air Force that later posted an award (middle half of cases, counted from Aug 19, 2026).

Next steps for this stage

Standard steps for the notice type; not advice about this buyer.

  • Decide bid or no bid before the response deadline.
  • Look at the past winners for likely competitors and teaming partners.
  • Follow the opportunity to hear about amendments and the award.

What the notice says

Statement of Requirements Conex Refurbishment, Officer Training School (OTS), Maxwell AFB Purpose: The purpose of this requirement is to obtain comprehensive restoration services for 27 Conex containers located at the Vigilant Warrior (VW) training site. The restoration is necessary to eliminate significant safety hazards posed by severe wood deterioration, restore the environmental integrity of the containers, and ensure their operational effectiveness for training over 5,000 cadets annually. Description of Items: The contractor shall provide all necessary personnel, supervision, materials, e… (show all)

quipment, tools, and services to perform complete restoration and repair of the 27 Conex containers. The work includes, but is not limited to, the following: Structural Component Restoration Assess and replace all deteriorated wood framing, flooring, and structural elements. Ensure all replacement materials meet or exceed original load-bearing specifications and comply with military construction standard UFC 1-200-01. All structural modifications must be certified by a licensed structural engineer. Window and Door Frame Restoration Restore window and door frames to provide a complete weatherproof seal when closed. Hardware must enable secure locking mechanisms to prevent unauthorized access. Materials used must resist corrosion and deterioration in outdoor environments. Environmental Protection Systems Achieve complete weather resistance to prevent water, snow, and wind infiltration. All joints, seams, and penetrations must be properly sealed. All openings must be sealed to prevent the entry of rodents, birds, and insects. Delivery Requirements: The contractor shall provide a detailed construction phasing plan to the government for approval. The plan must ensure that a minimum of 70% of the containers remain operational at all times. No more than 12 containers may be out of service simultaneously without prior government approval. The work will be performed on-site at the Vigilant Warrior training site located in Elmore County, Alabama. The address is: 407 Lakeland Drive, Titus AL. Installation Requirements: The contractor will be responsible for the installation of all new materials and components as part of the restoration services. When material replacement is required, the contractor shall procure and install materials as per specifications approved by Officer Training School (OTS). Standard Warranty: The contractor shall provide any Original Equipment Manufacturer (OEM) standard commercial warranty applicable to the products being purchased at no additional cost to the Government. Warranty shall include, as a minimum, technical support, troubleshooting assistance, and replacement of faulty equipment. The contractor must provide a 48-hour response for any warranty issues that affect training operations. All materials shall demonstrate a minimum 15-year service life, with a manufacturer's warranty of a minimum of 10 years on primary structural components. Prior to project acceptance, the contractor shall provide the customer with all manufacturer warranties as needed for any component incorporated into this project such as equipment manuals, literature, and other documentation on all equipment. Prior to project acceptance, the contractor shall provide the written procedures, points of contact within the company, and required information for all warranty services prior to project acceptance. This information shall include written confirmation of the warranty period, phone numbers and contact information/procedures for technical support, troubleshooting assistance, and replacement of faulty equipment. General Information: Items must be brand new. Refurbished items are not authorized. Reporting: The contractor is required to provide monthly progress reports detailing progress, materials used, quality control activities, and any safety incidents. Quality Control: The contractor shall establish and maintain a Quality Control Program. A Quality Program Plan (QPP) must be submitted within 30 days of contract award. This program will include inspection hold points at 25%, 50%, and 75% completion for each container, with government inspection rights at each phase. Statement of Requirements Conex Refurbishment, Officer Training School (OTS), Maxwell AFB Purpose: The purpose of this requirement is to obtain comprehensive restoration services for 27 Conex containers located at the Vigilant Warrior (VW) training site. The restoration is necessary to eliminate significant safety hazards posed by severe wood deterioration, restore the environmental integrity of the containers, and ensure their operational effectiveness for training over 5,000 cadets annually. Description of Items: The contractor shall provide all necessary personnel, supervision, materials, equipment, tools, and services to perform complete restoration and repair of the 27 Conex containers. The work includes, but is not limited to, the following: Structural Component Restoration Assess and replace all deteriorated wood framing, flooring, and structural elements. Ensure all replacement materials meet or exceed original load-bearing specifications and comply with military construction standard UFC 1-200-01. All structural modifications must be certified by a licensed structural engineer. Window and Door Frame Restoration Restore window and door frames to provide a complete weatherproof seal when closed. Hardware must enable secure locking mechanisms to prevent unauthorized access. Materials used must resist corrosion and deterioration in outdoor environments. Environmental Protection Systems Achieve complete weather resistance to prevent water, snow, and wind infiltration. All joints, seams, and penetrations must be properly sealed. All openings must be sealed to prevent the entry of rodents, birds, and insects. Delivery Requirements: The contractor shall provide a detailed construction phasing plan to the government for approval. The plan must ensure that a minimum of 70% of the containers remain operational at all times. No more than 12 containers may be out of service simultaneously without prior government approval. The work will be performed on-site at the Vigilant Warrior training site located in Elmore County, Alabama. The address is: 407 Lakeland Drive, Titus AL. Installation Requirements: The contractor will be responsible for the installation of all new materials and components as part of the restoration services. When material replacement is required, the contractor shall procure and install materials as per specifications approved by Officer Training School (OTS). Standard Warranty: The contractor shall provide any Original Equipment Manufacturer (OEM) standard commercial warranty applicable to the products being purchased at no additional cost to the Government. Warranty shall include, as a minimum, technical support, troubleshooting assistance, and replacement of faulty equipment. The contractor must provide a 48-hour response for any warranty issues that affect training operations. All materials shall demonstrate a minimum 15-year service life, with a manufacturer's warranty of a minimum of 10 years on primary structural components. Prior to project acceptance, the contractor shall provide the customer with all manufacturer warranties as needed for any component incorporated into this project such as equipment manuals, literature, and other documentation on all equipment. Prior to project acceptance, the contractor shall provide the written procedures, points of contact within the company, and required information for all warranty services prior to project acceptance. This information shall include written confirmation of the warranty period, phone numbers and contact information/procedures for technical support, troubleshooting assistance, and replacement of faulty equipment. General Information: Items must be brand new. Refurbished items are not authorized. Reporting: The contractor is requ

Who won similar work

32 award notices on SAM.gov in the last 24 months. Match: Same agency (Air Force and Space Force), same industry group (NAICS 2383).

WinnerAwardsValueLast
OCEAN FLOORING, INC.2$12.1MAug 27, 2026
FED SERVE LLC2$5.0M + 1 sharedSep 21, 2026
Red Dog Contracting Services LLC2$5.0M + 1 sharedSep 21, 2026
OSTROM PAINTING & SANDBLASTING, INC2$2.0MSep 30, 2026
See Description JPN1$50.0MMar 2, 2025
VANGUARD PACIFIC LLC1$7.4MJul 15, 2025
VERSA-TILE & MARBLE INC1$4.7MAug 14, 2026
K & S FLOORING BY KEITH, LLC1$4.0MApr 17, 2025
GULF PACIFIC CONTRACTING LLC1$4.0MApr 11, 2025
J E CONCEPTS, INC.1$750KSep 22, 2026

Value counts single-winner awards. "Shared" awards are multiple-award contracts that list every winner with the same total ceiling; that ceiling is not one company's win, so it is not added in.

Latest awards

Competitive landscape

For the 8 most frequent past winners above. Lobbying is matched by the company's exact name or exact ticker; agencies are as named on the filings.

  • 0 of these past winners lobbied Air Force, Dept of since 2024 (0 filings)
  • 0 of their lobbyists list a past Air Force, Dept of job
  • No corporate PAC money from them to the overseeing committees since 2024
  • 0 foreign-agent (FARA) registrations
See who and the source records with Pro

Policy around it

Bills the past winners named while lobbying this agency's issues, rules from the department, and executive orders that name the agency, last 12 months.

  • 0 bills named on the past winners' lobbying filings
  • 32 rules from the department in the last 12 months
  • 0 executive orders naming the agency in the last 12 months
See who and the source records with Pro

Market

For past winners matched exactly to a listed company. Insider trades are open-market buys and sells (Form 4) in the last 90 days, shown as facts; our own study found insiders do not reliably buy ahead of awards.

  • 0 of the past winners are listed companies
  • 0 insider buys and 0 insider sells at them in the last 90 days
See who and the source records with Pro

Sources: SAM.gov notices and award notices; Senate LDA lobbying filings; FEC filings; FARA; Federal Register; congress.gov; SEC Form 4. Every row above links to its record.

Companies are matched to tickers by exact name only. A company we could not match shows no market rows; that is a miss, not a finding.